Monitoring device for full framing preloading settlement

By designing a monitoring device for prepressure settlement for the whole bracket including a base, a bracket, a prepressing plate and a monitoring mechanism, the problem of only a fixed settlement distance in the prior art can be monitored, and flexible adaptation to different heights and monitoring distances is achieved, and monitoring flexibility and accuracy are improved.

CN222773981UActive Publication Date: 2025-04-18ROAD & BRIDGE INT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421331946.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2025-04-18
Estimated Expiration
2034-06-12

AI Technical Summary

Technical Problem

The existing prepressure settlement monitoring device of the stent can only monitor the fixed settlement distance and cannot adapt to the different settlement monitoring distance requirements of different construction stages or structural components, which limits the varied environmental adaptability of the monitoring device.

Method used

A monitoring device for prepressure settlement of a full-door bracket including a base, a plurality of brackets, a prepressing plate and a monitoring mechanism is designed. By adjusting the monitoring assembly, the bracket can adapt to different heights and monitoring distances, and the fixed assembly is used to quickly and stably connect the bracket, achieving real-time monitoring of different settlement distances.

Benefits of technology

The device can quickly adjust the monitoring distance, adapt to different heights and monitoring requirements, enhance adaptability, facilitate monitoring of bracket settlement, and improve monitoring flexibility and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222773981U_ABST
    Figure CN222773981U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of full framing pre-pressing deformation monitoring, in particular to a full framing pre-pressing settlement monitoring device which comprises a base, a plurality of supports are fixedly installed on one side of the base, a pre-pressing plate and a connecting monitoring mechanism are fixedly installed at one end of each support, and the pre-pressing plate is connected with the monitoring mechanism. The connection monitoring mechanism used for conducting connection monitoring on one side of the support is arranged on one side of the base, and the connection monitoring mechanism comprises a fixing pipe fixedly installed on one side of the base; when the connection monitoring mechanism is used, the supports at different positions can be positioned and fixed by adjusting the monitoring assembly so as to adapt to the supports with different heights, and when the supports are used, the monitoring distance can be quickly adjusted by adjusting the monitoring assembly so as to adapt to different monitoring requirements, so that the adaptability is enhanced, and the practicability is high. And during monitoring, the device can be quickly and stably connected with the bracket needing to be connected through the fixing assembly, so that the settlement of the bracket can be conveniently monitored.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of full-chamber bracket pre-compression deformation monitoring, in particular to a full-chamber bracket pre-compression settlement monitoring device. Background Art

[0002] The full-bridge support method is widely used in bridge construction, and support preloading is an important construction technology link. Through support preloading, the inelastic deformation of the support and foundation is eliminated, the elastic deformation value is obtained, and the support pre-arch is accurately set to ensure that the beam line meets the requirements. Support settlement observation and monitoring is an important technical means to ensure support safety and test whether the support preloading is qualified. It is an important measure to obtain accurate support pre-arch and ensure that the bridge line meets the requirements. Full-bridge support preloading deformation monitoring technology plays a key role in the safety of bridge support construction and the appearance quality of the beam.

[0003] As shown in the reference case "A full-chamber support pre-compression settlement monitoring device" announcement number "CN110455255B", it is easy to assemble and set up, the observation operation is simple, and it is less affected by the site, weather, and human factors. It does not require highly qualified professional surveyors, the observation operation efficiency is high, the observation data is highly real-time, and the observation data is highly accurate and precise;

[0004] However, during monitoring, usually only a fixed settlement distance can be monitored. However, since different construction stages or different structural components may require different settlement monitoring distances, fixed settlement distance monitoring limits the ability of the monitoring device to cope with changing environments.

[0005] Therefore, a monitoring device for pre-compression settlement of a full-bridge support is proposed to solve the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a monitoring device for the pre-compression settlement of a full-bridge support in order to solve the above-mentioned problem, which improves the problem that usually only a fixed settlement distance can be monitored during monitoring, but different construction stages or different structural components may require different settlement monitoring distances, and the fixed settlement distance monitoring limits the monitoring device's ability to cope with changing environments.

[0007] The utility model achieves the above-mentioned purpose through the following technical solutions: a monitoring device for pre-stressing settlement of a full-hall support, comprising: a base, a plurality of supports fixedly installed on one side of the base, a pre-stressing plate fixedly installed on one end of each of the plurality of supports, a connecting monitoring mechanism, and the connecting monitoring mechanism for connecting and monitoring one side of the support is arranged on one side of the base, wherein the connecting monitoring mechanism comprises a fixing pipe fixedly installed on one side of the base, an adjusting monitoring component is arranged on one side of the fixing pipe, and a fixing component is also arranged on one side of the fixing pipe. When the connecting monitoring mechanism is in use, the supports at different positions can be positioned and fixed by adjusting the monitoring component, so as to adapt to supports of different heights. When the support is in use, the monitoring distance can be quickly adjusted by adjusting the monitoring component, so as to adapt to different monitoring requirements, thereby enhancing adaptability. When monitoring is performed, the fixing component can be used to quickly and stably connect with the support to be connected, so as to facilitate monitoring of the settlement of the support.

[0008] Preferably, the adjustment monitoring component includes a moving rod slidably mounted on one side of a fixed tube, the fixed component is arranged on one side of the moving rod, a gas cylinder is arranged on one side of the fixed tube, one side of the gas cylinder is fixedly connected to the base, a movable block is slidably mounted inside the fixed tube, a piston plate is fixedly mounted on the bottom of the movable block, the output end of the gas cylinder extends to the inside of the fixed tube, the piston plate is located above the output end of the gas cylinder, a pressure sensor is fixedly mounted on the top of the movable block, and a contact plate is fixedly mounted on the output end of the pressure sensor, and the contact plate is located below the moving rod. When in use, the surface of the bracket can be quickly connected and fixed by the fixing component first, at this time the moving rod moves with the fixing component and is positioned and fixed, when the monitoring distance needs to be adjusted, gas can be injected to the bottom of the piston plate through the gas cylinder, the movable block and the pressure sensor are pushed by the gas, and after the movable block and the pressure sensor are pushed by the gas, real-time monitoring of different settlement distances is realized, so that the monitoring device can adapt to different monitoring needs.

[0009] Preferably, the adjustment and monitoring component also includes a first magnet fixedly mounted on one side of the moving rod and the movable block, a slide groove fixedly mounted on one side of the fixed tube, and two second magnets are slidably mounted inside the slide groove, and the two second magnets are respectively located on one side of the two first magnets. When the moving rod and the movable block move, the adjacent second magnets will be synchronously driven to move inside the slide groove through the first magnet on one side. The distance change between the moving rod and the pressure sensor can be more intuitively understood through the two second magnets located on the outside, thereby facilitating the adjustment and change of the monitoring distance.

[0010] Preferably, a spring is fixedly installed on the inner bottom wall of the fixed tube, and the spring is located below the piston plate. The top of the spring is in contact with one side of the piston plate. The spring at the bottom of the fixed tube can be used to lift the movable block when the movable block is not in use and moves downward, so that the movable block can be stably located above the output end of the air cylinder, thereby facilitating the use of the air cylinder.

[0011] Preferably, a rubber plate is fixedly mounted on the bottom end of the moving rod, and the rubber plate is located above the contact plate. When the moving rod moves downward synchronously with the contact plate, the rubber plate at one end of the moving rod can reduce the impact force on the contact plate, thereby reducing damage to the contact plate.

[0012] Preferably, the fixing assembly includes a support rod rotatably mounted on the surface of the moving rod, a fixing plate is fixedly mounted on one end of the support rod, two clamping plates are slidably mounted on one side of the fixing plate, a bidirectional screw is installed through the two clamping plates, and the bidirectional screws are threadedly connected to one side of the two clamping plates. When the moving rod and one side of the bracket need to be fixed, the bidirectional screw can be rotated to allow the bidirectional screw and the two clamping plates to perform threaded movement, and the two clamping plates can be synchronously driven to approach each other to stably clamp and fix one side of the bracket, so that the moving rod can be fixed on one side of the bracket for monitoring.

[0013] Preferably, the fixing assembly also includes a rubber sleeve fixedly mounted on one adjacent side of the two clamps, the two rubber sleeves are both arranged in an arc shape, and a plurality of friction grooves are provided on the surface of the rubber sleeves. When the clamps are clamped, the two rubber sleeves can provide a more stable and reliable clamping effect. The arc shape of the rubber sleeves can better adapt to the surface of the bracket, and the plurality of friction grooves on the surface of the rubber sleeves can enhance the clamping stability, thereby making the fixing assembly safer and more reliable during monitoring and operation.

[0014] The beneficial effects of the utility model are:

[0015] 1. When the connection monitoring mechanism is in use, the brackets at different positions can be positioned and fixed by adjusting the monitoring components, so as to adapt to brackets of different heights. When the bracket is in use, the monitoring distance can be quickly adjusted by adjusting the monitoring components, so as to adapt to different monitoring requirements, thereby enhancing adaptability. When monitoring, the bracket to be connected can be quickly and stably connected through the fixing component, so as to facilitate the monitoring of the settlement of the bracket;

[0016] 2. When it is necessary to fix the moving rod and one side of the bracket, the bidirectional screw can be rotated to allow the bidirectional screw and the two clamping plates to perform threaded motion. The two clamping plates can be synchronously driven to approach each other to stably clamp and fix one side of the bracket, so that the moving rod can be fixed on one side of the bracket for monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the main structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the connection monitoring mechanism of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the adjustment monitoring component of the utility model;

[0020] Figure 4 It is a schematic diagram of the structure of the fixing component of the utility model.

[0021] In the figure: 1. base; 2. bracket; 21. pre-load plate; 3. connection monitoring mechanism; 31. fixed tube; 32. adjustment monitoring assembly; 321. moving rod; 322. movable block; 323. pressure sensor; 324. contact plate; 325. air cylinder; 326. piston plate; 327. spring; 328. first magnet; 329. slide groove; 3210. second magnet; 3211. rubber plate; 33. fixing assembly; 331. support rod; 332. fixing plate; 333. clamping plate; 334. bidirectional screw; 335. rubber sleeve; 336. friction groove. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] When implementing: Figure 1-4As shown, a monitoring device for pre-stressing settlement of a full-chamber support comprises: a base 1, a plurality of supports 2 are fixedly installed on one side of the base 1, a pre-stressing plate 21 is fixedly installed on one end of each of the plurality of supports 2, a connecting monitoring mechanism 3, and a connecting monitoring mechanism 3 for connecting and monitoring one side of the support 2. The connecting monitoring mechanism 3 is arranged on one side of the base 1, wherein the connecting monitoring mechanism 3 comprises a fixing pipe 31 fixedly installed on one side of the base 1, an adjusting monitoring component 32 is arranged on one side of the fixing pipe 31, and a fixing component 33 is also arranged on one side of the fixing pipe 31. The plurality of supports 2 are combined with each other to form a full-chamber support 2. When the connecting monitoring mechanism 3 is in use, the supports 2 at different positions can be positioned and fixed by adjusting the monitoring component 32, so as to adapt to supports 2 at different heights. When the support 2 is in use, the monitoring distance can be quickly adjusted by adjusting the monitoring component 32, so as to adapt to different monitoring requirements, thereby enhancing adaptability. When monitoring is performed, the fixing component 33 can be used to quickly and stably connect with the support 2 to be connected, so as to facilitate monitoring of the settlement of the support 2.

[0024] like Figure 2 and Figure 3As shown, the adjustment monitoring component 32 includes a moving rod 321 slidably mounted on one side of the fixed tube 31, the fixed component 33 is arranged on one side of the moving rod 321, a gas cylinder 325 is arranged on one side of the fixed tube 31, one side of the gas cylinder 325 is fixedly connected to the base 1, a movable block 322 is slidably mounted inside the fixed tube 31, a piston plate 326 is fixedly mounted on the bottom of the movable block 322, the output end of the gas cylinder 325 extends to the inside of the fixed tube 31, the piston plate 326 is located above the output end of the gas cylinder 325, a pressure sensor 323 is fixedly mounted on the top of the movable block 322, and a contact plate 324 is fixedly mounted on the output end of the pressure sensor 323, and the contact plate 324 is located on the moving block 322. The bottom of the rod 321 can be quickly connected and fixed to the surface of the bracket 2 through the fixing component 33 when in use. At this time, the movable rod 321 moves with the fixing component 33 and is positioned and fixed. When the monitoring distance needs to be adjusted, gas can be injected into the bottom of the piston plate 326 through the gas cylinder 325, and the movable block 322 and the pressure sensor 323 are pushed by the gas. After the movable block 322 and the pressure sensor 323 are pushed by the gas, real-time monitoring of different settlement distances can be achieved, so that the monitoring device can adapt to different monitoring needs. The adjustment monitoring component 32 also includes a first magnet 328 fixedly installed on one side of the movable rod 321 and the movable block 322. The fixed tube A slide groove 329 is fixedly installed on one side of 31, and two second magnets 3210 are slidably installed inside the slide groove 329. The two second magnets 3210 are respectively located on one side of the two first magnets 328. When the moving rod 321 and the movable block 322 move, the adjacent second magnets 3210 are synchronously driven to move inside the slide groove 329 through the first magnet 328 on one side. The change in the distance between the moving rod 321 and the pressure sensor 323 can be more intuitively understood through the two second magnets 3210 located on the outside, so as to facilitate the adjustment of the monitoring distance. A spring 327 is fixedly installed on the inner bottom wall of the fixed tube 31. The spring 327 is located at the piston plate 326. At the bottom, the top of the spring 327 contacts one side of the piston plate 326. The spring 327 at the bottom of the fixed tube 31 can be used to lift the movable block 322 when the movable block 322 is not in use and moves downward, so that the movable block 322 can be stably located above the output end of the air cylinder 325, thereby facilitating the use of the air cylinder 325. A rubber plate 3211 is fixedly installed at the bottom end of the moving rod 321. The rubber plate 3211 is located above the contact plate 324. When the moving rod 321 moves downward synchronously with the contact plate 324, the rubber plate 3211 at one end of the moving rod 321 can reduce the impact force on the contact plate 324, thereby reducing damage to the contact plate 324.

[0025] like Figure 2 and Figure 4As shown, the fixing assembly 33 includes a support rod 331 rotatably mounted on the surface of the moving rod 321, one end of the support rod 331 is fixedly mounted with a fixing plate 332, one side of the fixing plate 332 is slidably mounted with two clamping plates 333, a bidirectional screw 334 is installed between the two clamping plates 333, and the bidirectional screw 334 is threadedly connected to one side of the two clamping plates 333. When it is necessary to fix the moving rod 321 and one side of the bracket 2, the bidirectional screw 334 can be rotated to make the bidirectional screw 334 and the two clamping plates 333 perform threaded movement, and the two clamping plates 333 can be synchronously driven to approach each other to stably clamp and fix one side of the bracket 2, so that the moving rod 321 can be fixed to one side of the bracket 2. 321 is fixed on one side of the bracket 2 for monitoring. The fixing component 33 also includes a rubber sleeve 335 fixedly installed on the adjacent side of the two clamps 333. The two rubber sleeves 335 are both arranged in an arc shape. The surface of the rubber sleeve 335 is provided with a plurality of friction grooves 336. When the clamps 333 are clamped, the two rubber sleeves 335 can provide a more stable and reliable clamping effect. The arc shape of the rubber sleeve 335 can better adapt to the surface of the bracket 2. The plurality of friction grooves 336 on the surface of the rubber sleeve 335 can enhance the clamping stability, so that the fixing component 33 is safer and more reliable during monitoring and operation.

[0026] When the utility model is in use, the surface of the bracket 2 can be quickly connected and fixed by the fixing component 33. At this time, the moving rod 321 moves with the fixing component 33 and is positioned and fixed. When the monitoring distance needs to be adjusted, gas can be injected into the bottom of the piston plate 326 through the gas cylinder 325, and the movable block 322 and the pressure sensor 323 are pushed by the gas. After the movable block 322 and the pressure sensor 323 are pushed by the gas, real-time monitoring of different sedimentation distances can be achieved, so that the monitoring device can adapt to different monitoring needs. When the moving rod 321 and the movable block 322 move, the adjacent second magnet 3210 will be synchronously driven to move inside the slide groove 329 through the first magnet 328 on one side. The distance change between the moving rod 321 and the pressure sensor 323 can be more intuitively understood through the two second magnets 3210 located on the outside, thereby facilitating the adjustment of the monitoring distance. The bottom of the fixed tube 31 can be used to adjust the distance between the moving rod 321 and the pressure sensor 323. The spring 327 lifts the movable block 322 when the movable block 322 is not in use and moves downward, so that the movable block 322 can be stably located above the output end of the air cylinder 325, thereby facilitating the use of the air cylinder 325. When it is necessary to fix the movable rod 321 to one side of the bracket 2, the bidirectional screw 334 can be rotated to allow the bidirectional screw 334 and the two clamping plates 333 to perform threaded movement, and the two clamping plates 333 can be synchronously driven to approach each other to stably clamp and fix one side of the bracket 2, so that the movable rod 321 can be fixed to one side of the bracket 2 for monitoring. When the clamping plates 333 are clamped, two rubber sleeves 335 can be used to provide a more stable and reliable clamping effect. The arc shape of the rubber sleeve 335 can better adapt to the surface of the bracket 2, and multiple friction grooves 336 on the surface of the rubber sleeve 335 can enhance the clamping stability, making the fixing component 33 safer and more reliable during monitoring and operation.

[0027] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A monitoring device for preloading and settlement of a full-chamber support, characterized in that: include: A base (1), wherein a plurality of brackets (2) are fixedly mounted on one side of the base (1), and a pre-pressing plate (21) is fixedly mounted on one end of each of the plurality of brackets (2); A connection monitoring mechanism (3), used for performing connection monitoring on one side of the bracket (2), the connection monitoring mechanism (3) being arranged on one side of the base (1); The connection monitoring mechanism (3) comprises a fixed tube (31) fixedly mounted on one side of the base (1), an adjustment monitoring component (32) is arranged on one side of the fixed tube (31), and a fixing component (33) is also arranged on one side of the fixed tube (31).

2. A monitoring device for preloading and settlement of a full-chamber support according to claim 1, characterized in that: The regulating and monitoring component (32) comprises a moving rod (321) slidably mounted on one side of a fixed tube (31); the fixed component (33) is arranged on one side of the moving rod (321); a gas cylinder (325) is arranged on one side of the fixed tube (31); one side of the gas cylinder (325) is fixedly connected to the base (1); a movable block (322) is slidably mounted inside the fixed tube (31); a piston plate (326) is fixedly mounted on the bottom of the movable block (322); an output end of the gas cylinder (325) extends into the interior of the fixed tube (31); the piston plate (326) is located above the output end of the gas cylinder (325); a pressure sensor (323) is fixedly mounted on the top of the movable block (322); a contact plate (324) is fixedly mounted on the output end of the pressure sensor (323); and the contact plate (324) is located below the moving rod (321).

3. A monitoring device for preloading and settlement of a full-chamber support according to claim 2, characterized in that: The adjustment monitoring assembly (32) also includes a first magnet (328) fixedly mounted on one side of the moving rod (321) and the movable block (322); a slide groove (329) is fixedly mounted on one side of the fixed tube (31); two second magnets (3210) are slidably mounted inside the slide groove (329); and the two second magnets (3210) are respectively located on one side of the two first magnets (328).

4. The monitoring device for preloading and settlement of a full-chamber support according to claim 1 is characterized in that: A spring (327) is fixedly mounted on the inner bottom wall of the fixed tube (31), and the spring (327) is located below the piston plate (326), and the top end of the spring (327) is in contact with one side of the piston plate (326).

5. The monitoring device for preloading and settlement of a full-chamber support according to claim 2 is characterized in that: A rubber plate (3211) is fixedly mounted on the bottom end of the moving rod (321), and the rubber plate (3211) is located above the contact plate (324).

6. The monitoring device for preloading and settlement of a full-bridge support according to claim 1 is characterized in that: The fixing assembly (33) comprises a support rod (331) rotatably mounted on the surface of the moving rod (321); a fixing plate (332) is fixedly mounted on one end of the support rod (331); two clamping plates (333) are slidably mounted on one side of the fixing plate (332); a bidirectional screw rod (334) is installed through the two clamping plates (333); and the bidirectional screw rod (334) is threadedly connected to one side of the two clamping plates (333).

7. The monitoring device for preloading and settlement of a full-chamber support according to claim 1 is characterized in that: The fixing assembly (33) further comprises a rubber sleeve (335) fixedly mounted on one side adjacent to the two clamping plates (333); the two rubber sleeves (335) are both arranged in an arc shape; and a plurality of friction grooves (336) are provided on the surface of the rubber sleeves (335).

Citation Information

Patent Citations

  • A monitoring device and method for pre-compression settlement of a full-chamber support

    CN110455255B