Sewage treatment monitoring system
By installing three temperature sensors in the sewage treatment equipment and using a PLC controller for weighted average calculation, the overheating or supercooling problems caused by uneven heat and damage to the temperature sensor are solved, and high-precision temperature control and effective disinfection and sterilization of sewage are achieved.
Patent Information
- Application Number
- CN202420636189.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-03-29
AI Technical Summary
During the high-temperature disinfection and sterilization process, existing sewage treatment equipment may be overheated or overcooled due to uneven heating and poor temperature measurement accuracy during high-temperature disinfection and sterilization.
A sewage treatment monitoring system was designed, using three temperature sensors located in the middle of the left, middle and top of the tank, and the weighted average calculation was performed through the PLC controller to improve the temperature measurement accuracy. When a certain temperature sensor is damaged, the other two sensors can still effectively control the heating temperature.
High-precision temperature measurement and control are achieved, the disinfection and sterilization effect of sewage is ensured, and the fluidity of sewage is improved, and the condensation of oily substances in low-temperature sewage is prevented.
Smart Images

Figure CN222774746U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage treatment equipment, in particular to a sewage treatment monitoring system. Background Art
[0002] In the process of biopharmaceutical production or scientific research experiments, a lot of live poison wastewater is generated. The discharged wastewater contains radioactive nuclides such as iodine, phosphorus, gold, sodium, etc., which need to be treated to meet the standards before they can be discharged. These wastewaters are sterilized at high temperature and then cooled before they can be discharged to the next level for further treatment. In order to reach the process temperature, the heating temperature must be controlled. The existing control method is to use a temperature sensor placed in the middle of the top of the inactivation tank, but this method has the following disadvantages:
[0003] 1. Due to the large volume of the tank, the temperature measurement accuracy may be poor due to uneven heating;
[0004] 2. When the temperature sensor is damaged and fails, overheating or overcooling problems may occur, resulting in failure to meet the disinfection and sterilization requirements. Utility Model Content
[0005] Based on this, it is necessary to provide a sewage treatment monitoring system to address the problem of uneven heating, which can meet the requirements of high temperature measurement accuracy, good disinfection and sterilization effect, and safe and reliable sewage treatment monitoring system.
[0006] A sewage treatment monitoring system comprises sewage treatment equipment, wherein the discharge end of the sewage treatment equipment is connected to a sewage filtration treatment equipment via a first pipe fitting, and the discharge end of the sewage filtration treatment equipment is connected to a sewage sedimentation treatment equipment via a second pipe fitting; the sewage sedimentation treatment equipment is connected to the sewage filtration treatment equipment via a third pipe fitting, and a filter, a pump body and a first solenoid valve are sequentially connected to the third pipe fitting, the third solenoid valve is installed on the first pipe fitting, the second solenoid valve is installed on the second pipe fitting, and a PLC controller is installed on the sewage filtration treatment equipment, and the PLC controller is electrically connected to the first solenoid valve, the second solenoid valve and the third solenoid valve, respectively.
[0007] As a preferred solution, a pressure relief valve is installed on the top of the sewage treatment equipment, and the pressure relief valve is electrically connected to the PLC controller.
[0008] As a preferred solution, the sewage treatment equipment is connected to a weighing hopper via a fourth pipe fitting, a sixth solenoid valve is installed on the fourth pipe fitting, and the sixth solenoid valve is electrically connected to the PLC controller.
[0009] As a preferred solution, a fourth solenoid valve is installed on the sewage treatment equipment, a liquid inlet end of the fourth solenoid valve is connected to a clean water pipeline, and the fourth solenoid valve is electrically connected to the PLC controller.
[0010] As a preferred solution, a fifth solenoid valve is installed on the sewage treatment equipment, the liquid inlet end of the fifth solenoid valve is connected to a flow meter, the liquid inlet end of the flow meter is connected to a sewage pipe, and the fifth solenoid valve is electrically connected to the PLC controller.
[0011] As a preferred solution, the sewage filtration treatment equipment includes a tank body, an electric heater and three temperature sensors, wherein the three temperature sensors are respectively located in the middle position of the left part of the tank body, the middle position of the right part of the tank body and the middle position of the top, and the three temperature sensors and the electric heater are electrically connected to the PLC controller.
[0012] As a preferred solution, the second pipe fitting is connected to the third pipe fitting via a tee pipe, and the tee pipe is located on the second pipe fitting between the second solenoid valve and the sewage filtering treatment equipment.
[0013] As a preferred solution, the PLC controller includes a data input / output module, a data processing module, a memory card and a CPU module.
[0014] The utility model is beneficial in that:
[0015] Sewage is treated step by step through sewage treatment equipment, sewage filtration treatment equipment and sewage sedimentation treatment equipment to achieve sewage purification treatment, so as to achieve the purpose of reasonable sewage discharge. In this process, harmful substances and wastes in sewage can be collected, and sewage that meets the indicators can be discharged; among them, different positions of the three temperature sensors give different weights to the measured temperature values, and then the industrial PC can obtain a temperature value with higher accuracy by weighted averaging the temperature measurement values transmitted by the three temperature sensors; in addition, due to the use of three temperature sensors, when a temperature sensor is damaged and fails, the remaining two temperature sensors can still effectively control the heating temperature, with high temperature measurement accuracy, heating can disinfect and sterilize sewage, and can further improve the fluidity of sewage, and prevent the wastewater containing oil substances in low-temperature sewage from cooling and condensing. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of one embodiment.
[0017] 1. Sewage treatment equipment; 2. Sewage filtration treatment equipment; 3. Sewage sedimentation treatment equipment; 4. Filter; 5. Pump body; 6. First solenoid valve; 7. Second solenoid valve; 8. Third solenoid valve; 9. Fourth solenoid valve; 10. Fifth solenoid valve; 11. Flow meter; 12. Sixth solenoid valve; 13. Pressure relief valve; 14. Heater; 15. Temperature sensor; 16. PLC controller; 17. Weighing hopper. DETAILED DESCRIPTION
[0018] In order to make the above-mentioned purposes, features and advantages of the utility model more obvious and easy to understand, the specific implementation methods of the utility model are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the utility model. However, the utility model can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the utility model, so the utility model is not limited by the specific embodiments disclosed below.
[0019] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.
[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0021] like Figure 1 As shown,
[0022] As an optional embodiment,
[0023] A sewage treatment monitoring system comprises a sewage treatment device 1, wherein the discharge end of the sewage treatment device 1 is connected to a sewage filtration treatment device 2 through a first pipe fitting, and the discharge end of the sewage filtration treatment device 2 is connected to a sewage sedimentation treatment device 3 through a second pipe fitting; the sewage sedimentation treatment device 3 is connected to the sewage filtration treatment device 2 through a third pipe fitting, and the third pipe fitting is sequentially connected to a filter 4, a pump body 5 and a first solenoid valve 6, the first pipe fitting is installed with a third solenoid valve 8, and the second pipe fitting is installed with a second solenoid valve 7, a PLC controller 16 is installed on the sewage filtration treatment device 2, and the PLC controller 16 is electrically connected to the first solenoid valve 6, the second solenoid valve 7 and the third solenoid valve 8 respectively, and the sewage filtration treatment device 2 comprises a tank body, an electric heater 14 and three temperature sensors 15, wherein the three temperature sensors 15 are respectively located at the middle position of the left part of the tank body, the middle position of the right part of the tank body and the middle position of the top, and the three temperature sensors 15 and the electric heater 14 are all electrically connected to the PLC controller 16.
[0024] In the above structure, the sewage to be treated flows into the sewage treatment equipment 1, and after being treated by the sewage treatment equipment 1, it flows into the sewage filtration treatment equipment, and the sewage filtration treatment equipment further treats the inflowing sewage. Finally, the sewage in the sewage filtration treatment equipment after treatment enters the sewage sedimentation treatment equipment for sedimentation operation, so as to realize sewage purification treatment and achieve the purpose of reasonable sewage discharge;
[0025] The sewage treatment equipment 1 is provided with a radiation detector for detecting the radioactive activity of the sewage. If the radiation detector detects that the radioactive activity of the sewage is higher than the index value, a chemical elimination method including a chemical neutralization method and a chemical adsorption method is adopted, wherein chemical substances are used to react chemically with the nuclear radiation substances to convert them into harmless substances, such as using an adsorbent such as activated carbon to adsorb the radioactive substances on the surface, and then the substances are centrally processed until the radiation detector detects that the radioactive activity of the sewage reaches below the index value. Then, the PLC controller 16 controls the third solenoid valve 8 to open the first pipeline passage, so that the sewage can be discharged into the sewage filtration treatment equipment 2;
[0026] When entering the sewage filtering and treating device 2, the sewage filtering and treating device 2 filters the sewage. During the filtering process, the sewage can be heated by the electric heater 14, which can improve the fluidity of the internal liquid and prevent the sewage from sticking at low temperature. In addition, in order to further detect the temperature changes of various parts of the sewage, temperature detection sensors are installed at the middle position of the left part of the tank body, the middle position of the right part of the tank body, and the middle position of the top. The temperature sensor can detect the local temperature. Since three temperature sensors are used, when a temperature sensor is damaged and fails, the remaining two temperature sensors can still effectively control the heating temperature, with high temperature measurement accuracy. Heating can disinfect and sterilize the sewage, and can further improve the fluidity of the sewage and prevent the wastewater containing oil substances in the low-temperature sewage from cooling and condensing.
[0027] When entering the sewage sedimentation treatment equipment 3, the sewage is further cooled and placed for stratification treatment; then the supernatant is discharged.
[0028] Based on the first embodiment, Figure 1 As shown:
[0029] A pressure relief valve 13 is installed on the top of the sewage treatment equipment 1, and the pressure relief valve 13 is electrically connected to the PLC controller 16. In order to avoid excessive internal air pressure in the sewage treatment equipment 1, the pressure relief valve 13 is designed. The pressure relief valve 13 can effectively eliminate the internal air pressure of the sewage treatment equipment 1, which can improve the problem of excessive air pressure in the sewage treatment equipment 1.
[0030] As a preferred solution, the sewage treatment equipment 1 is connected to a weighing hopper 17 through a fourth pipe fitting, and a sixth solenoid valve 12 is installed on the fourth pipe fitting. The sixth solenoid valve 12 is electrically connected to the PLC controller 16. The set weighing hopper 17 can control the amount of the input material to achieve particle control of the input amount of the input material. Subsequently, the PLC controller 16 can control the opening and closing of the sixth solenoid valve 12 to achieve the purpose of automatically inputting the input material into the sewage treatment equipment 1.
[0031] As a preferred solution, a fourth solenoid valve 9 is installed on the sewage treatment equipment 1, and the liquid inlet end of the fourth solenoid valve 9 is connected to a clean water pipeline. The fourth solenoid valve 9 is electrically connected to the PLC controller 16. The fourth solenoid valve 9 is selected to open the clean water pipeline to connect with the sewage treatment equipment 1, and the radioactive activity of the sewage can be reduced by dilution. Conversely, clean water can be automatically connected to facilitate subsequent cleaning of the sewage treatment equipment. The fourth solenoid valve can be subsequently controlled to open and close by the PLC controller 16.
[0032] As a preferred solution, a fifth solenoid valve 10 is installed on the sewage treatment equipment 1, and the liquid inlet end of the fifth solenoid valve 10 is connected to a flow meter 11, and the liquid inlet end of the flow meter 11 is connected to a sewage pipe. The fifth solenoid valve 10 is electrically connected to the PLC controller 16. In order to further control the amount of sewage entering the sewage treatment equipment 1, the flow meter 11 is designed to control the sewage flow rate, and the fifth solenoid valve is controlled to open and close by the PLC controller to control whether the sewage is discharged into the sewage treatment equipment 1.
[0033] As a preferred solution, the second pipe fitting is connected to the third pipe fitting by a tee pipe, and the tee pipe is located on the second pipe fitting between the second solenoid valve 7 and the sewage filtering treatment equipment 2. The second solenoid valve 7 can be used to cut off the sewage in the sewage filtering treatment equipment 2 from being discharged into the sewage sedimentation treatment equipment 3. The second solenoid valve 7 is closed and the first solenoid valve 6 is opened. The pump body 5 flows the sewage sedimentation treatment equipment 3 into the sewage filtering treatment equipment. The upper clear liquid inside the sewage sedimentation treatment equipment 3 can be discharged into the sewage filtering treatment equipment 2, and the interior of the sewage filtering treatment equipment 2 is backwashed to clean the sewage filtering treatment equipment 2. At the same time, the filter 4 can filter the sewage flowing through to avoid sewage clogging the pump body.
[0034] As a preferred solution, the PLC controller 16 includes a data input / output module, a data processing module, a memory card and a CPU module, wherein the PLC controller 16 mainly adopts a PLC programmable controller, and is also equipped with an AD converter to achieve the effect of converting analog signals into digital signals. The data input / output module can adopt a DAM-3025D data acquisition module, and the memory card stores the execution program, specifically a GCAN-PLC series programmable master control module.
[0035] The above-mentioned embodiments only express several implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the utility model patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.
Claims
1. A sewage treatment monitoring system, characterized in that: The invention comprises a sewage treatment device (1), wherein the discharge end of the sewage treatment device (1) is connected to a sewage filtration treatment device (2) via a first pipe fitting, the discharge end of the sewage filtration treatment device (2) is connected to a sewage sedimentation treatment device (3) via a second pipe fitting, the sewage sedimentation treatment device (3) is connected to the sewage filtration treatment device (2) via a third pipe fitting, the third pipe fitting is connected in sequence to a filter (4), a pump body (5) and a first solenoid valve (6), the first pipe fitting is installed with a third solenoid valve (8), the second pipe fitting is installed with a second solenoid valve (7), the sewage A PLC controller (16) is installed on the water filtration treatment device (2), and the PLC controller (16) is electrically connected to the first solenoid valve (6), the second solenoid valve (7) and the third solenoid valve (8) respectively. The sewage filtration treatment device (2) comprises a tank body, an electric heater (14) and three temperature sensors (15), and the three temperature sensors (15) are respectively located at the middle position of the left part of the tank body, the middle position of the right part of the tank body and the middle position of the top part. The three temperature sensors (15) and the electric heater (14) are all electrically connected to the PLC controller (16).
2. A sewage treatment monitoring system according to claim 1, characterized in that: A pressure relief valve (13) is installed on the top of the sewage treatment equipment (1), and the pressure relief valve (13) is electrically connected to the PLC controller (16).
3. A sewage treatment monitoring system according to claim 1, characterized in that: The sewage treatment equipment (1) is connected to a weighing hopper (17) via a fourth pipe fitting, a sixth solenoid valve (12) is installed on the fourth pipe fitting, and the sixth solenoid valve (12) is electrically connected to the PLC controller (16).
4. A sewage treatment monitoring system according to claim 1, characterized in that: The sewage treatment equipment (1) is provided with a fourth solenoid valve (9), the liquid inlet end of the fourth solenoid valve (9) is connected to a clean water pipeline, and the fourth solenoid valve (9) is electrically connected to the PLC controller (16).
5. A sewage treatment monitoring system according to claim 1, characterized in that: The sewage treatment equipment (1) is provided with a fifth solenoid valve (10), the liquid inlet end of the fifth solenoid valve (10) is connected to a flow meter (11), the liquid inlet end of the flow meter (11) is connected to a sewage pipe, and the fifth solenoid valve (10) is electrically connected to the PLC controller (16).
6. A sewage treatment monitoring system according to claim 1, characterized in that: The second pipe fitting is connected to the third pipe fitting via a three-way pipe, and the three-way pipe is located on the second pipe fitting between the second solenoid valve (7) and the sewage filtering treatment equipment (2).
7. A sewage treatment monitoring system according to claim 1, characterized in that: The PLC controller (16) comprises a data input / output module, a data processing module, a memory card and a CPU module.