Prefabricated transformer substation for photovoltaic power generation
Through the design of pre-installed substations, the combined structure of embedded parts and pre-installed parts is simplified, the installation process of the substation is solved, the problem of low efficiency of traditional installation methods is solved, and the rapid and convenient installation effect is achieved.
Patent Information
- Application Number
- CN202421453765.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2034-06-25
AI Technical Summary
The installation method of traditional substations requires digging holes and pouring concrete, which leads to long installation time and low efficiency.
The pre-installed substation design is adopted, including embedded parts and pre-installed parts pre-embedded underground. The main body of the power station is connected to the embedded parts by fastening bolts, supplemented by structures such as assisted slope plates, box doors, door handles and assisted components to simplify the installation process.
It realizes rapid installation of the substation, shortens installation time, improves installation efficiency, and improves installation convenience and safety through power assist devices.
Smart Images

Figure CN222785677U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of transformer substations, in particular to a prefabricated transformer substation for photovoltaic power generation. Background Art
[0002] Substations are mainly used for the transmission and distribution of electric energy. They can convert electricity from high-voltage transmission lines into low-voltage and connect it to different power consumption areas. The traditional installation method of substations is to first dig a hole in the ground, then pour concrete into the hole, wait for the concrete to solidify to form cement piles, and then install the corresponding base accessories on the power station on the cement piles by drilling. Digging holes and waiting for concrete to solidify takes a long time, which greatly delays the installation progress of the power station and reduces the installation efficiency of the power station.
[0003] In view of the above problems, the present invention makes improvements. Summary of the invention
[0004] The utility model provides a prefabricated substation for photovoltaic power generation, which solves the above-mentioned problems existing in the use process of the prior art.
[0005] The technical solution of the utility model is implemented as follows: a prefabricated substation for photovoltaic power generation, including four embedded parts buried underground, the embedded parts are plugged with preassembled parts, the inner sides of the four preassembled parts are welded with connecting plates, and the tops of the four preassembled parts are provided with bases, and the four corners of the top of the base are plugged with fastening bolts one, and the bottom ends of the fastening bolts one pass through the preassembled parts to the inside of the embedded parts, and the top of the base is provided with two card slots, and the insides of the card slots are plugged with card blocks, and the tops of the two card blocks are fixedly connected with power station boxes, and two fastening bolts two are penetrated on one side of the base, and one end of the fastening bolt two passes through the card block to the outside of the base.
[0006] The utility model is a prefabricated substation for photovoltaic power generation as described above, further comprising: two box doors arranged opposite to each other are movably mounted on one side of the power station box, and door handles are fixedly mounted on the front sides of the box doors.
[0007] The utility model is a prefabricated substation for photovoltaic power generation as described above, further comprising: power-assisting ramps fixedly mounted on both sides of the base, the power-assisting ramps being located below the power station box.
[0008] The utility model is a prefabricated substation for photovoltaic power generation as described above, further comprising: a mounting groove is provided at the bottom of the inner cavity of the embedded part, and a power assist component is arranged inside the mounting groove.
[0009] The utility model is a prefabricated substation for photovoltaic power generation as described above, further comprising: the power assist assembly includes a fixing frame fixedly connected to the inside of the mounting groove, a plurality of sliding rods are provided through the top of the fixing frame, and an adaption frame is fixedly installed on the top of the plurality of sliding rods.
[0010] The utility model is a prefabricated substation for photovoltaic power generation, further comprising: a plurality of rolling rods are movably installed inside the adaptable frame, and the plurality of rolling rods are evenly spaced and distributed inside the adaptable frame.
[0011] The utility model is a prefabricated substation for photovoltaic power generation as described above, further comprising: a spring sleeved on the surface of the sliding rod, the top end of the spring fixedly connected to the inner wall of the fixing frame, and the bottom end of the spring fixedly connected to the sliding rod.
[0012] In summary, the beneficial effects of the present invention are:
[0013] 1. The utility model adopts a structural design that combines the power station body and embedded parts. During installation, the user can first bury the embedded parts underground, leaving only the part connected to the power station body exposed, and then move the corresponding power station body to the embedded parts and adjust and fix them. In this way, the installation of the substation can be completed quickly in the shortest time, thereby improving the installation efficiency of the substation.
[0014] 2. The utility model provides a box door and a door handle. The box door is used to shield the components inside the embedded parts to prevent them from being damaged by foreign objects. The door handle can provide assistance for users to open and close the box door, providing convenience for users.
[0015] 3. The utility model sets a power-assisting ramp, which is located on the ground during installation, and the top of the power-assisting ramp is set in a slope. In this way, when installing the power station box, the user can easily push the power station box from the power-assisting ramp to the base for installation, which provides convenience for the user's work.
[0016] 4. The utility model provides an assisting component. When installing the substation, that is, installing the power station box, the power station box will first be pressed on the adapting frame and the rolling rod. Then, when the power station box is moved and adjusted, all the rolling rods will roll along with it, so as to reduce the friction between the power station box and the base when the power station box is adjusted, thereby providing assistance for the user's installation work. When the power station box is pressed on the adapting frame and the rolling rod, the adapting frame and the rolling rod will also move downward, thereby driving the sliding rod to move up and down on the fixed frame, stretching the spring at the same time, and then the fastening bolts can be inserted to fix the power station box, thereby providing convenience for the user's installation work.
[0017] 5. The utility model provides rolling rods. During the installation of the substation, the substation will slide on multiple rolling rods for adjustment, and the rolling rods will also roll along during the movement of the substation, which provides convenience for the user's adjustment work, thereby improving the installation efficiency of the substation.
[0018] 6. The utility model is provided with a spring. When working, the sliding rod will move down and stretch the spring at the same time. Then, when the work is completed, the spring will contract to push the sliding rod back to its original position to prepare for the next work, providing convenience for the user's work. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 It is a bottom-up schematic diagram of the three-dimensional structure of the power station box;
[0022] Figure 3 It is a schematic diagram of the partial three-dimensional structure of the utility model;
[0023] Figure 4 This is a schematic diagram of the three-dimensional structural decomposition of the power assist component.
[0024] In the figure: 1. embedded parts, 2. pre-assembled parts, 3. connecting plate, 4. base, 5. fastening bolt 1, 6. slot, 7. mounting slot, 8. power assist assembly, 9. block, 10. fastening bolt 2, 11. power station box, 12. box door, 13. door handle, 14. power assist ramp, 81. fixed frame, 82. adaptive frame, 83. rolling rod, 84. sliding rod, 85. spring. DETAILED DESCRIPTION
[0025] The following will be combined with the attached embodiment of the utility model Figure 1-4 , clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example
[0026] A prefabricated substation for photovoltaic power generation, including four embedded parts 1 buried underground, wherein the embedded parts 1 are plugged with preassembled parts 2, the inner sides of the four preassembled parts 2 are welded with connecting plates 3, the tops of the four preassembled parts 2 are provided with bases 4, the four corners of the top of the base 4 are plugged with fastening bolts 5, the bottom ends of the fastening bolts 5 pass through the preassembled parts 2 and penetrate into the embedded parts 1, the top of the base 4 is provided with two card slots 6, the insides of the card slots 6 are plugged with card blocks 9, the tops of the two card blocks 9 are fixedly connected with power station boxes 11, one side of the base 4 is penetrated with two fastening bolts 10, one end of the fastening bolt 10 passes through the card block 9 and penetrates to the outside of the base 4.
[0027] The specific usage process is as follows: when installing the substation, first dig a matching soil pit at a suitable position, and then directly bury the four embedded parts 1 into the corresponding pits. It should be noted that in order to ensure the stability of the embedded parts 1, a base plate with a diameter larger than the embedded parts 1 can be welded to the bottom of the embedded parts 1, and then the embedded parts 1 are buried. In this way, when filling the soil, the contact area between the embedded parts 1 and the soil layer can be increased, thereby improving the stability of the substation. After the four embedded parts 1 are buried, the four pre-installed parts 2 can be inserted into the corresponding embedded parts 1. Because the connecting plate 3 is welded to the four pre-installed parts 2, after the four pre-installed parts 2 are plugged in and installed, the connecting plate 3 is also installed along with the pre-installed parts 2, and then the base 4 is adjusted to the direction and angle for docking. The four preassembled parts 2 are then inserted into the bolts at the four corners of the base 4 respectively, and are inserted into the embedded parts 1 through the base 4 and the preassembled parts 2. Finally, the four fastening bolts 5 are tightened in sequence to fasten the base 4, the four preassembled parts 2 and the four embedded parts 1 together. It should be noted that when tightening the fastening bolts 5, a diagonal tightening sequence should be adopted. This method can ensure that the embedded parts 1, the preassembled parts 2 and the base 4 are subjected to uniform force in four directions, thereby improving the firmness of the connection and installation of the embedded parts 1, the preassembled parts 2 and the base 4. At this point, the preassembled parts of the substation are installed. Compared with the traditional method of pouring concrete piles, this method can greatly save installation time, increase installation speed, and improve the installation efficiency of the substation, which is convenient for users to use. It provides convenience, and then the substation can be installed. During installation, the power station box 11 is lifted so that the card block 9 at the bottom of the power station box 11 is overlapped on the power-assisting ramp 14 on either side. Then, with the help of the slope on the top of the power-assisting ramp 14, the user can easily push the power station box 11 and drive the card block 9 to be inserted into the corresponding card slot 6. Then, the user continues to push the card block 9 to move and adjust the position of the card block 9 in the card slot 6, wherein the card block 9 will slide on the power-assisting assembly 8, as follows. When installing the substation, that is, when installing the power station box 11, the power station box 11 will first be pressed on the adaptation frame 82 and the rolling rod 83, and then when moving and adjusting the power station box 11, all the rolling rods 83 will roll along to reduce the friction between the power station box 11 and the base 4 when adjusting the power station box 11. To provide assistance for the user's installation work, when the power station box 11 is pressed on the adaptation frame 82 and the rolling rod 83, the adaptation frame 82 and the rolling rod 83 will also move down, thereby driving the sliding rod 84 to move up and down on the fixed frame 81, and at the same time stretching the spring 85, and then the fastening bolt 10 can be inserted to fix the power station box 11, thereby providing convenience for the user's installation work. During the installation of the substation, the substation will slide on multiple rolling rods 83 for adjustment, and the rolling rod 83 will also roll along during the movement of the substation, providing convenience for the user's adjustment work, thereby improving the installation efficiency of the substation. During work, the sliding rod 84 will move down and stretch the spring 85 at the same time, and then when the work is completed, the spring 85 will contract to push the sliding rod 84 back to its original position.In order to prepare for the next work and provide convenience for the user's work, when the hole on the card block 9 is aligned with the hole in the card slot 6, the fastening bolt 10 is inserted and tightened to complete the installation of the substation. In this way, the installation of the substation can be completed quickly in the shortest time, improving the installation efficiency of the substation.
[0028] Therefore, a structural design combining the power station body and embedded parts is adopted. During installation, users can first bury the embedded parts underground, leaving only the part connected to the power station body exposed, and then move the corresponding power station body to the embedded parts and adjust and fix them. In this way, the installation of the substation can be completed quickly in the shortest time, thereby improving the installation efficiency of the substation.
[0029] Two box doors 12 arranged opposite to each other are movably mounted on one side of the power station box 11 , and a door handle 13 is fixedly mounted on the front side of the box door 12 .
[0030] Specifically, the box door 12 and the door handle 13 are provided. The box door 12 is used to shield the components inside the embedded part 1 to prevent them from being damaged by foreign objects. The door handle 13 can provide assistance for the user to open and close the box door 12, providing convenience for the user.
[0031] Power-assisting ramps 14 are fixedly mounted on both sides of the base 4 , and the power-assisting ramps 14 are located below the power station box 11 .
[0032] Specifically, the assisting ramp 14 is located on the ground during installation, and the top of the assisting ramp 14 is arranged in a slope. In this way, when installing the power station box 11, the user can easily push the power station box 11 from the assisting ramp 14 to the base 4 for installation, which provides convenience for the user's work.
[0033] A mounting groove 7 is provided at the bottom of the inner cavity of the embedded part 1, and a power-assisting assembly 8 is provided inside the mounting groove 7. The power-assisting assembly 8 includes a fixing frame 81 fixedly connected to the mounting groove 7, and a plurality of sliding rods 84 are provided through the top of the fixing frame 81, and an adaption frame 82 is fixedly installed on the top of the plurality of sliding rods 84.
[0034] Specifically, the setting of the assisting component 8 is that when installing the substation, that is, when installing the power station box 11, the power station box 11 will first press on the adapting frame 82 and the rolling rod 83, and then when the power station box 11 is moved and adjusted, all the rolling rods 83 will roll along to reduce the friction generated between the power station box 11 and the base 4 when adjusting, thereby providing assistance for the user's installation work. When the power station box 11 is pressed on the adapting frame 82 and the rolling rod 83, the adapting frame 82 and the rolling rod 83 will also move downward, thereby driving the sliding rod 84 to move up and down on the fixing frame 81, and at the same time stretching the spring 85, and then the fastening bolt 10 can be inserted to fix the power station box 11, thereby providing convenience for the user's installation work.
[0035] A plurality of rolling rods 83 are movably installed inside the adaptable frame 82 , and the plurality of rolling rods 83 are evenly spaced and distributed inside the adaptable frame 82 .
[0036] Specifically, the setting of the rolling rod 83 is that during the installation of the substation, the substation will slide on multiple rolling rods 83 for adjustment, and the rolling rod 83 will also roll along during the movement of the substation, providing convenience for the user's adjustment work, thereby improving the installation efficiency of the substation.
[0037] A spring 85 is sleeved on the surface of the sliding rod 84 . The top end of the spring 85 is fixedly connected to the inner wall of the fixing frame 81 , and the bottom end of the spring 85 is fixedly connected to the sliding rod 84 .
[0038] Specifically, the setting of the spring 85 is that when working, the sliding rod 84 will move down and stretch the spring 85 at the same time, and then when the work is completed, the spring 85 will contract to push the sliding rod 84 back to its original position to prepare for the next work, providing convenience for the user's work.
[0039] It should be noted that the functions to be implemented by each hardware in the utility model are supported by a large number of mature technologies and belong to the existing technology. The essence of the utility model is to optimize the combination of existing hardware and its connection method for specific application scenarios to meet the adaptation needs in specific application scenarios and solve the problems raised in the background technology (not involving improvements to the software inside the hardware).
[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated substation for photovoltaic power generation, comprising four embedded parts (1) pre-buried underground, characterized in that: The embedded part (1) is plugged with a preassembled part (2), the inner sides of the four preassembled parts (2) are welded with a connecting plate (3), the tops of the four preassembled parts (2) are provided with a base (4), the four corners of the top of the base (4) are plugged with a fastening bolt (5), the bottom end of the fastening bolt (5) passes through the preassembled part (2) and penetrates into the embedded part (1), the top of the base (4) is provided with two slots (6), the inside of the slots (6) is plugged with a clamping block (9), the tops of the two clamping blocks (9) are fixedly connected with a power station box (11), and one side of the base (4) is penetrated with two fastening bolts (10), one end of the fastening bolt (10) passes through the clamping block (9) and penetrates to the outside of the base (4).
2. A prefabricated photovoltaic power generation substation according to claim 1, characterized in that: Two box doors (12) arranged opposite to each other are movably mounted on one side of the power station box (11), and a door handle (13) is fixedly mounted on the front side of the box door (12).
3. A prefabricated substation for photovoltaic power generation according to claim 2, characterized in that: Power-assisting ramps (14) are fixedly mounted on both sides of the base (4), and the power-assisting ramps (14) are located below the power station box (11).
4. A prefabricated substation for photovoltaic power generation according to claim 3, characterized in that: A mounting groove (7) is provided at the bottom of the inner cavity of the embedded component (1), and a power assist component (8) is arranged inside the mounting groove (7).
5. A prefabricated substation for photovoltaic power generation according to claim 4, characterized in that: The power assist assembly (8) comprises a fixing frame (81) fixedly connected to the inside of the installation groove (7), a plurality of sliding rods (84) are provided through the top of the fixing frame (81), and an adapting frame (82) is fixedly installed on the top of the plurality of sliding rods (84).
6. A prefabricated substation for photovoltaic power generation according to claim 5, characterized in that: A plurality of rolling rods (83) are movably mounted inside the adaptable frame (82), and the plurality of rolling rods (83) are distributed at equal intervals inside the adaptable frame (82).
7. A prefabricated substation for photovoltaic power generation according to claim 6, characterized in that: A spring (85) is sleeved on the surface of the sliding rod (84), the top end of the spring (85) is fixedly connected to the inner wall of the fixing frame (81), and the bottom end of the spring (85) is fixedly connected to the sliding rod (84).