Simple tool for pouring bridge concrete anti-collision guardrail
By designing a simple tool for the construction of bridge concrete anti-collision guardrails, including guardrail formwork, hopper, diversion pipe and support rod, the concrete leakage problem caused by the unstable fixation of the hopper is solved, and the stable fixation of the hopper and the aesthetics of the construction are improved.
Patent Information
- Application Number
- CN202421326109.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-06-11
AI Technical Summary
During the construction of bridge concrete anti-collision guardrails, the hopper is not firmly fixed, resulting in the concrete cement slurry that is easy to leak out from the joints of the hopper and the formwork, contaminating the formwork and the bridge deck, affecting the aesthetics.
A simple tool including guardrail formwork, hopper, flow tube and support rod was designed. The hopper is arranged at the upper end of the flow guide tube, and the support rod is mounted above the guardrail formwork. The flow guide tube matches the pouring port on the top of the guardrail formwork. The cross-section of the support rod is cylindrical, and rolling wheels are provided at both ends to reduce moving resistance.
Through this simple tool, the hopper can be steadily matched with the guardrail formwork without manual support, avoiding concrete leakage, improving construction stability and aesthetics, and saving manpower.
Smart Images

Figure CN222796202U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road traffic engineering construction, and specifically relates to a simple tool for pouring concrete anti-collision guardrails of bridges. Background Art
[0002] Concrete anti-collision guardrail is a type of guardrail that can block colliding vehicles with collision energy less than or equal to the designed protection energy, and plays the role of dissipating energy and correcting the direction of travel.
[0003] At present, the construction site is mainly constructed through on-site cast-in-place method. When pouring concrete, because the top size of the guardrail is small, a hopper is set up and located on the formwork to ensure that the concrete enters the formwork smoothly. However, currently most hoppers are located on the formwork and are not firmly fixed. Personnel are needed to fix them. Cement slurry is easy to leak from the gap between the hopper and the formwork, contaminating the formwork and the bridge deck, affecting the appearance. Utility Model Content
[0004] The utility model aims to solve the above problems and provides a simple tool for pouring concrete anti-collision guardrails for bridges, which can match the lower end of the hopper with the pouring port at the top of the guardrail template and complete the pouring without manual support of the hopper.
[0005] The technical problem to be solved by the utility model is achieved by adopting the following technical scheme: a simple tool for pouring concrete anti-collision guardrails for bridges, comprising a guardrail template, a hopper, a guide pipe and a support rod;
[0006] The hopper is arranged at the upper end of the guide pipe, and the two support rods are arranged oppositely on both sides of the guide pipe;
[0007] The guide pipe matches the pouring port at the top of the guardrail template;
[0008] The support rod is erected above the guardrail template.
[0009] Preferably, the cross section of the support rod is cylindrical. Setting the cross section of the support rod to be cylindrical can reduce the resistance when the hopper is moved.
[0010] Preferably, the two ends of the support rod are provided with rolling wheels, and the rolling wheels are V-shaped wheels. By providing rolling wheels at both ends of the support rod, the resistance when moving the hopper is reduced, and the rolling wheels are V-shaped wheels, which are used to limit the position and prevent the hopper from running off during movement.
[0011] Preferably, the upper end surface of the hopper is provided with a splash-proof edge, which is used to prevent concrete from splashing out from the opposite side of the injection when concrete is injected into the hopper, thereby contaminating the bridge deck.
[0012] Preferably, the splash-proof edge of the utility model comprises a rectangular surface and two right-angled triangular surfaces located on both sides of the rectangular surface, and a right-angled side of the right-angled triangular surface is aligned with one side of the rectangular surface;
[0013] The cross section of the hopper is rectangular, and the rectangular surface and the right-angled triangular surface are arranged at the upper ends of the three edges of the hopper. Since the splash guard includes a rectangular surface and two right-angled triangular surfaces located on both sides of the rectangular surface, when pouring concrete into the hopper, it can be poured from the side opposite to the rectangular surface, which facilitates the insertion of the pouring pipe.
[0014] Preferably, the hopper, the flow guide pipe and the splash-proof edge are all formed by welding steel plates.
[0015] Preferably, the support rod is made of a steel pipe.
[0016] Preferably, the support rod is welded to the flow guide pipe.
[0017] Compared with the prior art, the beneficial effects of the utility model are as follows: the simple tool provided by the utility model for pouring concrete anti-collision guardrail of bridges includes a guardrail formwork, a hopper, a guide pipe and a support rod; by setting the hopper at the upper end of the guide pipe, and relatively arranging two support rods on both sides of the guide pipe; since the guide pipe matches the pouring port at the top of the guardrail formwork, the guide pipe can be inserted into the pouring port of the guardrail formwork, solving the problem of the pouring port of the guardrail formwork being too small.
[0018] In addition, by setting up the support rod above the guardrail template, the hopper can be kept stable without manual support, saving manpower. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic structural diagram of a simple tool for pouring concrete anti-collision guardrails for bridges according to Embodiment 1 of the utility model;
[0020] Figure 2 This is a front view of a simple tool for pouring concrete anti-collision guardrails for bridges as described in Example 1 of the utility model;
[0021] Figure 3 A reference diagram of the use status of the simple tool for pouring concrete anti-collision guardrails for bridges according to an embodiment of the utility model;
[0022] Figure 4 This is a front view of a simple tool for pouring concrete anti-collision guardrails for bridges as described in Example 2 of the utility model;
[0023] In the picture, 100 guardrail template;
[0024] 1 hopper, 2 guide pipe, 3 support rod, 4 rolling wheel, 5 splash guard;
[0025] 51 rectangular faces, 52 right triangle faces. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present utility model will be described clearly and completely below in conjunction with the accompanying drawings.
[0027] Example 1
[0028] like Figure 1-Figure 3 As shown, a simple tool for pouring concrete anti-collision guardrail of bridges includes a guardrail template 100, a hopper 1, a guide pipe 2 and a support rod 3.
[0029] The hopper 1 is arranged at the upper end of the flow guide pipe 2, and the two support rods 3 are arranged oppositely at two sides of the flow guide pipe 2. The two support rods 3 are arranged in parallel.
[0030] The guide tube 2 matches the pouring port at the top of the guardrail template 100. That is, the size of the guide tube 2 is consistent with the pouring port at the top of the guardrail template 100.
[0031] The support rod 3 is installed above the guardrail formwork 100 .
[0032] The cross section of the support rod 3 is cylindrical.
[0033] The upper end surface of the hopper 1 is provided with a splash-proof edge 5 .
[0034] The splash guard 5 includes a rectangular surface 51 and two right-angled triangular surfaces 52 located on both sides of the rectangular surface 51, and one right-angled side of the right-angled triangular surface 52 is aligned with one side of the rectangular surface 51. Specifically, the right-angled side of the right-angled triangular surface 52 adjacent to the rectangular surface 51 is consistent in length with the side edge of the rectangular surface 51. The other right-angled side of the right-angled triangular surface 52 is consistent in length with the edge of the hopper.
[0035] The cross section of the hopper 1 is rectangular, and the rectangular surface 51 and the right-angled triangular surface 52 are arranged at the upper ends of the three edges of the hopper 1 .
[0036] The hopper 1, the flow guide pipe 2 and the splash guard 5 are all welded by steel plates.
[0037] The support rod 3 is made of a steel pipe.
[0038] The support rod 3 is welded to the upper end of the guide tube 2 and is located below the connection portion between the guide tube 2 and the hopper 1 .
[0039] Example 2
[0040] like Figure 4As shown, the difference from Example 1 is that rolling wheels 4 are provided at both ends of the support rod 3, and the rolling wheels 4 are V-shaped wheels. The V-shaped wheels are clamped on the edge of the guardrail template 100, and the edge of the guardrail template 100 plays a role of limiting and guiding.
Claims
1. A simple tool for pouring concrete anti-collision guardrails for bridges, characterized by: It comprises a guardrail template (100), a hopper (1), a flow guide pipe (2) and a support rod (3); The hopper (1) is arranged at the upper end of the flow guide tube (2), and the two support rods (3) are arranged oppositely on both sides of the flow guide tube (2); The guide pipe (2) matches the pouring port at the top of the guardrail template (100); The support rod (3) is erected above the guardrail template (100).
2. The simple tool for pouring bridge concrete anti-collision guardrail according to claim 1 is characterized in that: The cross section of the support rod (3) is cylindrical.
3. The simple tool for pouring concrete anti-collision guardrail of bridge according to claim 1 or 2, characterized in that: Rolling wheels (4) are provided at both ends of the support rod (3), and the rolling wheels (4) are V-shaped wheels.
4. The simple tool for pouring bridge concrete anti-collision guardrail according to claim 1 is characterized in that: The upper end surface of the hopper (1) is provided with a splash-proof edge (5).
5. The simple tool for pouring concrete anti-collision guardrails for bridges according to claim 4 is characterized in that: The splash-proof edge (5) comprises a rectangular surface (51) and two right-angled triangular surfaces (52) located on both sides of the rectangular surface (51), and a right-angled side of the right-angled triangular surface (52) is aligned with one side of the rectangular surface (51); The cross section of the hopper (1) is rectangular, and the rectangular surface (51) and the right-angled triangular surface (52) are arranged at the upper ends of the three edges of the hopper (1).
6. The simple tool for pouring bridge concrete anti-collision guardrail according to claim 4 is characterized by: The hopper (1), the flow guide pipe (2) and the splash guard (5) are all welded from steel plates.
7. The simple tool for pouring concrete anti-collision guardrail of bridge according to claim 1 is characterized by: The support rod (3) is made of a steel pipe.
8. The simple tool for pouring concrete anti-collision guardrail of bridge according to claim 7 is characterized in that: The support rod (3) is welded to the flow guide tube (2).