Integrated toilet waterproof structure node
By using waterproof coils in the bathroom waterproof structural node to fill the gap between the adhesive layer and the waterproof chassis, the water leakage problem in traditional construction methods is solved, and higher waterproof performance and simplified construction process are achieved.
Patent Information
- Application Number
- CN202421346462.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-06-12
AI Technical Summary
The traditional bathroom waterproof construction method has long construction intervals, high technical requirements for workers and uncontrollable quality, which is prone to water leakage, especially at the connection between the adhesive layer and the waterproof chassis.
The integrated bathroom waterproof structure node is adopted, including a substrate installed on the wall panel and a waterproof chassis installed on the floor panel of the structural floor. The lower end of the substrate abuts to the waterproof chassis. The waterproof chassis is equipped with a waterproof chassis and a drainage pipe is connected to the waterproof chassis. The waterproof roll is laid on the waterproof chassis, and the ceramic tile is installed on the waterproof roll through the adhesive layer.
Through the use of waterproof coils, the connection defects between the adhesive layer and the waterproof chassis are effectively compensated, the risk of water leakage is reduced, the construction process is simplified, and the impact on construction efficiency is reduced.
Smart Images

Figure CN222796961U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bathroom waterproofing, and in particular to an integrated bathroom waterproofing structural node. Background Art
[0002] The traditional bathroom construction method is to use waterproof coating and tiles, but this method has a long construction interval and requires a high level of technical skills of the workers, resulting in uncontrollable construction quality and the risk of water leakage.
[0003] In order to solve the problems existing in traditional construction methods, integrated bathrooms have emerged as a new type of bathroom solution. The integrated bathroom uses a prefabricated waterproof chassis, which is directly placed on the building floor of the bathroom. The waterproof chassis itself has good waterproof performance and can greatly shorten the construction period. At the same time, the tiles are directly installed on the waterproof chassis through the adhesive layer, which simplifies the construction steps and reduces the construction difficulty. However, in actual applications, the connection between the adhesive layer and the waterproof chassis is still a weak link, which is prone to cracking due to material aging, temperature changes, etc., thus causing water leakage problems. Utility Model Content
[0004] In order to improve the waterproof performance of the entire bathroom, the present application provides an integrated bathroom waterproof structural node.
[0005] The present application provides an integrated toilet waterproof structure node adopting the following technical solution:
[0006] An integrated toilet waterproof structural node comprises a base plate arranged on a wall panel and a waterproof chassis arranged on a structural floor slab, wherein the lower end of the base plate is abutted against the waterproof chassis; a drainage hole for installing a floor drain cover is provided on the waterproof chassis, and the drainage hole is connected to a drainage pipe; a waterproof coil is laid above the waterproof chassis away from the structural wall panel, and ceramic tiles are laid above the waterproof coil via an adhesive layer.
[0007] By adopting the above technical solution, the waterproof membrane, as a professional waterproof material, has excellent waterproof performance and durability, and can effectively make up for the connection defects between the adhesive layer and the waterproof chassis, reducing the risk of water leakage; at the same time, the construction of the waterproof membrane is relatively simple and can be prefabricated in the factory, reducing the impact on construction efficiency.
[0008] Preferably, the sides of the waterproof chassis close to the wall panel are integrally formed with a water retaining plate, and the water retaining plate is located above the waterproof chassis, and one end of the base plate close to the waterproof chassis is located on the side of the water retaining plate away from the wall panel.
[0009] By adopting the above technical solution, the water retaining plate can reduce the possibility of water falling onto the building floor through the gap between the base plate and the waterproof chassis.
[0010] Preferably, the waterproof coiled material is turned up close to the side of the water retaining plate and laid on the side of the water retaining plate away from the wall panel.
[0011] By adopting the above technical solution, the waterproof performance of the water retaining plate is improved and the integrity of the waterproof membrane is guaranteed.
[0012] Preferably, a film-covered board is provided on a side of the substrate away from the wall panel.
[0013] By adopting the above technical solution, the waterproof performance of the substrate can be improved by using the film-covered board.
[0014] Preferably, a groove is provided at an edge of the waterproof chassis close to the wall panel, one end of the film-covered board close to the waterproof chassis is inserted into the groove, and tiles are laid on a side of the film-covered board away from the wall panel.
[0015] By adopting the above technical solution, the water falling on the film-covered board can be diverted to the ceramic tile, thereby enhancing the waterproof performance.
[0016] Preferably, it further comprises a plurality of wall leveling components, and the base plate is mounted on the wall panel via the wall leveling components.
[0017] By adopting the above technical solution and arranging the wall leveling component, the base plate can be arranged as vertically as possible to the waterproof chassis.
[0018] Preferably, it further comprises a waterproof component, one end of which is installed below the waterproof chassis corresponding to the drain hole, and the other end of which is connected to the drain pipe.
[0019] By adopting the above technical solution, the waterproof component is utilized to allow water to flow into the drain pipe through the waterproof component, thereby improving the waterproof performance during drainage.
[0020] Preferably, a waterproof sealant is provided at the connection between the waterproof component and the waterproof chassis.
[0021] By adopting the above technical solution and providing a waterproof sealant, water can be prevented from seeping out from the gap between the waterproof chassis and the waterproof component as much as possible.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. By installing waterproof membrane, not only can the gap between the adhesive layer and the waterproof chassis be effectively filled, thereby greatly reducing the risk of water leakage; but the construction process of waterproof membrane is relatively simple and can be prefabricated in the factory, reducing the impact on construction efficiency.
[0024] 2. By setting the water retaining plate and the plug-in cooperation between the film-covered board and the slot, water can be prevented from seeping into the building floor from the gap between the base plate and the waterproof chassis as much as possible. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a cross-sectional view of an embodiment of the present application.
[0026] Figure numerals: 100, floor; 101, wall panel; 102, drain pipe; 1, waterproof chassis; 11, water retaining plate; 12, drain hole; 13, groove; 2, waterproof membrane; 3, bracket; 4, ceramic tile; 5, floor drain cover; 6, waterproof component; 61, sealant; 62, installation part; 7, adapter; 8, base plate; 81, film-coated board; 9, wall leveling component. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1 This application is described in further detail.
[0028] The embodiment of the present application discloses an integrated bathroom waterproof structural node.
[0029] Reference Figure 1 An integrated bathroom waterproof structural node includes a waterproof chassis 1 provided on a building floor 100, and a substrate 8 provided on a wall panel 101. The substrate 8 is provided around the waterproof chassis 1, and the lower end of the substrate 8 abuts against the top of the waterproof chassis 1. A drainage hole 12 is also provided on the waterproof chassis 1 for providing a floor drain cover 5, a waterproof component 6 is provided in the drainage hole 12 corresponding to the floor drain cover 5, and the end of the waterproof component 6 close to the building floor 100 is connected to the drain pipe 102 through an adapter 7, so as to realize the drainage function of the bathroom. A waterproof roll 2 is provided above the waterproof chassis 1, and a tile 4 is laid on the top of the waterproof roll 2 through an adhesive layer. The waterproof roll 2 has excellent waterproof performance and durability, and increases the waterproof performance of the overall bathroom; at the same time, the construction of the waterproof roll 2 is relatively simple, and can be prefabricated in the factory, reducing the impact on construction efficiency.
[0030] The side of the waterproof chassis 1 close to the wallboard 101 is integrally formed with a water retaining plate 11, which is located above the waterproof chassis 1, and the board surface of the water retaining plate 11 is perpendicular to the surface of the waterproof chassis 1, and the base plate 8 is arranged close to the water retaining plate 11. In this embodiment, the waterproof chassis 1 is made of lightweight materials. After the pre-processing in the factory is completed, the slope is adjusted by 1%, so that the water on the bathroom floor can be converged into the floor drain to achieve drainage. Preferably, the waterproof chassis 1 can be engraved by a CNC machine in the factory according to the detailed drawings, without increasing the cost of chassis mold opening, so that the waterproof chassis 1 can be adapted to bathrooms of different sizes. After the waterproof chassis 1 is processed, the waterproof roll 2 is laid on the waterproof chassis 1 and turned up to the water retaining plate 11. In addition, the waterproof chassis 1 is installed on the building floor 100 through an adjustable bracket 3, and the height adjustment can be achieved by adjusting the bracket 3, and the level is used for auxiliary leveling.
[0031] The waterproof component 6 is cylindrical as a whole, and the axis of the waterproof component 6 is perpendicular to the waterproof chassis 1. The end of the waterproof component 6 away from the waterproof chassis 1 is used to install the L-shaped adapter 7, and the end of the waterproof component 6 close to the waterproof chassis 1 is integrally formed with a mounting portion 62, and the upper surface of the waterproof chassis 1 is provided with a mounting groove that matches the shape of the mounting portion 62 near the drain hole 12, that is, the mounting portion 62 is provided in the mounting groove. The water on the tile 4 can flow into the drain pipe 102 as much as possible through the floor drain cover 5, the waterproof component 6 and the adapter 7 in sequence. After the waterproof chassis 1 completes the laying of the waterproof membrane 2 in the factory, the waterproof component 6 is pasted on the waterproof chassis 1 near the drain hole 12 through the waterproof sealant 61, and the waterproof chassis 1 is reinforced with the waterproof sealant 61 at the connection between the waterproof component 6 and the waterproof chassis 1 below the waterproof chassis 1 to improve the waterproof effect. After the installation of the waterproof component 6 is completed, the waterproof chassis 1 is transported to the site for splicing and installation.
[0032] The base plate 8 is installed on the wallboard 101 through the wall leveling member 9. The surface of the base plate 8 can be made as flat as possible and placed on the waterproof bottom plate by adjusting the wall leveling member 9. The end of the base plate 8 close to the waterproof bottom plate 1 is abutted to the joint of the base plate 8 and the water retaining plate 11, and the waterproof membrane 2 is used to seal the joint, so that the water falling on the base plate 8 can be gathered on the tile 4 as much as possible.
[0033] Preferably, a film-covered board 81 is provided on the side of the base plate 8 away from the wallboard 101, and the film-covered board 81 is made of a waterproof and moisture-proof material such as calcium carbonate. In addition, a groove 13 is provided on the edge of the waterproof chassis 1 close to the water retaining plate 11, and one end of the film-covered board 81 close to the waterproof chassis 1 is inserted into the groove 13, and the ceramic tile 4 is laid on the side of the film-covered board 81 away from the water retaining plate 11, so that the water falling on the film-covered board 81 can be diverted to the ceramic tile 4, thereby enhancing the waterproof performance.
[0034] The implementation principle of an integrated bathroom waterproof structural node in an embodiment of the present application is as follows: before construction, the installation height of the waterproof chassis 1 is first adjusted on the building floor 100 by means of the bracket 3; then the waterproof chassis 1 is processed in the factory according to the drawings, and the waterproof membrane 2 is laid and the waterproof component 6 is installed in the factory, and then the processed waterproof chassis 1 is transported to the site for splicing and installation; after the processed waterproof chassis 1 is laid on site, the wall waterproofing is formed by installing the wall leveling component 9 and the base plate 8, and then the film-coated board 81 is installed, and finally the laying of the ceramic tiles 4, the installation of the finished floor drain and the installation of the suspended ceiling are completed.
[0035] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An integrated toilet waterproof structural node, characterized in that: The invention comprises a base plate (8) arranged on a wall panel (101) and a waterproof base plate (1) arranged on a structural floor panel (100), wherein the lower end of the base plate (8) is abutted against the waterproof base plate (1); a drain hole (12) for installing a floor drain cover plate (5) is provided on the waterproof base plate (1), and the drain hole (12) is communicated with a drain pipe (102); a waterproof coiled material (2) is laid on the upper side of the waterproof base plate (1) away from the structural wall panel (101), and tiles (4) are laid on the upper side of the waterproof coiled material (2) via an adhesive layer; a water retaining plate (11) is integrally formed on the side of the waterproof base plate (1) close to the wall panel (101), and the water retaining plate (11) is located above the waterproof base plate (1), and an end of the base plate (8) close to the waterproof base plate (1) is located on a side of the water retaining plate (11) away from the wall panel (101).
2. An integrated toilet waterproof structural node according to claim 1, characterized in that: The waterproof roll material (2) is turned up on the side close to the water retaining plate (11) and laid on the side of the water retaining plate (11) away from the wall panel (101).
3. The integrated toilet waterproof structural node according to claim 1, characterized in that: A film-covered board (81) is provided on a side of the base plate (8) away from the wall plate (101).
4. The integrated toilet waterproof structural node according to claim 3, characterized in that: The waterproof base plate (1) is provided with a groove (13) at an edge close to the water retaining plate (11); one end of the film-covered board (81) close to the waterproof base plate (1) is inserted into the groove (13); and the ceramic tiles (4) are laid on a side of the film-covered board (81) away from the water retaining plate (11).
5. The integrated toilet waterproof structural node according to claim 1, characterized in that: It also comprises a plurality of wall levelling components (9), and the base plate (8) is mounted on the wall panel (101) via the wall levelling components (9).
6. The integrated toilet waterproof structural node according to claim 1, characterized in that: It also comprises a waterproof component (6), one end of which is mounted below the waterproof chassis (1) corresponding to the drain hole (12), and the other end of which is connected to the drain pipe (102).
7. The integrated toilet waterproof structural node according to claim 6, characterized in that: A waterproof sealant (61) is provided at the connection between the waterproof component (6) and the waterproof chassis (1).