Protection device for flood control of cable of sluice dam monitoring instrument

By designing a protective device for the cables for flood discharge gate monitoring instruments, the problem of easy damage to the cables during flood season is solved, effective protection of the cables and reliability of monitoring data are achieved, and construction efficiency is improved.

CN222802485UActive Publication Date: 2025-04-25CCCC FOURTH HARBOR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421388658.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-04-25
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

During the construction of the flood discharge dam, it is difficult to effectively protect the cables of the monitoring instruments and are easily damaged by water flow impact and silt erosion, resulting in unreliable monitoring data.

Method used

A protective device for monitoring instrument cables for flood discharge gates is designed, including a box with open ends and a removable cover plate. The box is installed on the flood discharge gates through a connecting structure. The cover plate can prevent mud and sand from entering, and the box covers the cable to prevent water flow from impacting.

Benefits of technology

Effectively prevent cables from being impacted by water flow and erosion during flood season, ensure the integrity of the cable and the reliability of monitoring data, reduce post-repair work, and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222802485U_ABST
    Figure CN222802485U_ABST
Patent Text Reader

Abstract

The utility model discloses a protection device for flood control of a cable of a sluice dam monitoring instrument, which relates to the technical field of water conservancy projects and can effectively protect the cable of the monitoring instrument in a flood season and ensure the perfectness ratio of the monitoring instrument so as to ensure that reliable monitoring data in the construction period of the sluice dam is obtained. The device comprises a box body with openings in the two ends, a cover plate used for preventing silt from entering the box body is arranged at the top of the box body, and the box body is installed on a flood discharge gate dam through a connecting structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a protection device for flood discharge dam monitoring instrument cables during flood seasons. Background Art

[0002] During the construction of the spillway dam, it is necessary to conduct safety monitoring of the dam body, and to guide the construction of the spillway dam through the monitoring data obtained to ensure the stability and safety of the dam during construction and use. The safety monitoring of the spillway dam is carried out by monitoring instruments, and the cables of the monitoring instruments need to be buried in the concrete of the spillway dam. After the cables of the monitoring instruments are buried in the concrete of the spillway dam, it is difficult to repair and replace them. During the construction of the spillway dam, the cables of the monitoring instruments buried inside the spillway dam need to go through one or more flood seasons. How to effectively protect the cables of the monitoring instruments and ensure the normal operation of the monitoring instruments is crucial to obtaining monitoring data during the construction of the spillway dam and guiding the construction of the spillway dam.

[0003] In the process of protecting the cables of monitoring instruments, the existing protection method is to set concrete slag and waterproof geotextile at the collection position of the cables, wrap the waterproof geotextile with the cables, and then cover the concrete slag on the waterproof geotextile. This method has the following problems: the surface of the concrete slag is relatively sharp, and when the concrete slag is too thick or too heavy, it is easy to crush the cables; during the flood season, the cables are under the impact of water flow for a long time, and the concrete slag and waterproof geotextile are easily washed away by the water flow. The cables are exposed and soaked in water, and are easily punctured by hard objects in the water flow, resulting in damage, breakage, water ingress, etc. to the cables, making it impossible to obtain monitoring data, affecting the accuracy of later monitoring data collection, and affecting the assessment of the safety status of the flood discharge dam. Utility Model Content

[0004] At least one of the purposes of the present utility model is to provide a protection device for the cables of flood discharge dam monitoring instruments during the flood season, aiming at overcoming the problems existing in the above-mentioned prior art. During the flood season, the cables of the monitoring instruments can be effectively protected to ensure the integrity of the monitoring instruments, thereby ensuring that reliable monitoring data is obtained during the construction of the flood discharge dam.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model includes the following aspects.

[0006] A protection device for flood discharge dam monitoring instrument cables during flood seasons comprises: a box with openings at both ends, a cover plate for preventing mud and sand from entering the box is arranged on the top of the box, and the box is installed on the flood discharge dam through a connecting structure.

[0007] Preferably, the box body comprises a first side plate and two second side plates which are arranged opposite to each other, two ends of the first side plate are respectively connected to the second side plates, and the cover plate is detachably arranged on the top of the box body.

[0008] Preferably, angle steels are provided at the top and bottom of the box body, and the angle steels are respectively connected to the top and bottom of the first side plate and the top and bottom of the second side plate; the angle steels are also provided at the connection position between the first side plate and the second side plate.

[0009] Preferably, the main steel bars of the flood discharge dam extend out of the top of the flood discharge dam, and the box body is connected to the main steel bars through a connecting structure; the connecting structure includes a first connecting member, a first end of the first connecting member is connected to the cover plate, and a second end of the first connecting member is connected to the main steel bars.

[0010] Furthermore, the connection structure also includes a second connection member, a first end of the second connection member is connected to the first side plate or the second side plate of the box body, and a second end of the second connection member is connected to the main steel bar.

[0011] Furthermore, the connection structure also includes a third connecting member, the third connecting member is provided with one or more first slide grooves along its length, the third connecting member is provided with one or more second slide grooves near the left and right ends respectively, the second side panel of the box is provided with one or more connecting tubes in the height direction, the second end of the cover is provided with one or more connecting tubes in the length direction, the connecting tube is axially provided with an internal thread, the first connecting member is connected to the cover through the first slide groove, the second connecting member is connected to the box through the second slide groove, and the third connecting member is provided with a connecting buckle.

[0012] Furthermore, the connecting buckle is a cylindrical structure, and its inner diameter is adapted to the diameter of the main steel bar. A notch is provided on the connecting buckle, and connecting plates are provided at both ends of the notch. The two connecting plates are connected by adjusting screws, and a rubber ring is provided inside the connecting buckle.

[0013] Furthermore, the cover plate is hinged to one of the first side plates or the second side plates of the box body through a hinge, or the cover plate is inserted and covered on the top of the box body.

[0014] Furthermore, a wire conduit opening for passing a cable is provided at the bottom of one of the first side panels or the second side panels of the box.

[0015] Furthermore, the cable is also wrapped with a waterproof geotextile.

[0016] In summary, due to the adoption of the above technical solution, the utility model has at least the following beneficial effects:

[0017] By setting up a box with openings at both ends and a removable cover on the top of the box, it can effectively prevent the impact of water flow during the flood season from damaging the cables of the monitoring instruments, ensure the quality and integrity of the cables, thereby avoiding failure of the monitoring instruments and effectively improving the integrity rate of buried monitoring instruments; after the flood season, it can reduce the repair work of monitoring instruments with problems and reduce repair costs. The box is easy to make and easy to assemble and disassemble, and can be used in a turnover manner, improving the subsequent construction efficiency of the flood discharge dam. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic structural diagram of an exemplary embodiment of the utility model for protecting cables of flood discharge dam monitoring instruments during flood season.

[0019] Figure 2 It is a schematic diagram of the use status of the protection device for flood discharge dam monitoring instrument cables during flood season according to an exemplary embodiment of the utility model.

[0020] Figure 3 It is a schematic structural diagram of a protection device for flood discharge dam monitoring instrument cables during flood season according to another exemplary embodiment of the utility model.

[0021] Figure 4 It is a schematic diagram of another usage state of the protection device for flood discharge dam monitoring instrument cables during flood season according to an exemplary embodiment of the utility model.

[0022] Figure 5 It is a schematic diagram of the third connecting member structure of an exemplary embodiment of the utility model.

[0023] Figure 6 yes Figure 5 A top view of the connecting buckle structure.

[0024] Markings in the figure: 1-box, 11-first side panel, 12-second side panel, 2-cover plate, 3-connecting structure, 31-first connecting piece, 32-second connecting piece, 33-third connecting piece, 331-first slide, 332-second slide, 4-flood discharge dam, 5-angle steel, 6-hinge, 7-wire pipe mouth, 8-main steel bar, 9-connecting tube, 10-connecting buckle. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0026] refer to Figure 1 , Figure 2The protective device for flood discharge dam monitoring instrument cables during flood season of the exemplary embodiment of the utility model comprises a box body 1 with openings at both ends, a cover plate 2 for preventing mud and sand from entering the box body 1 is arranged on the top of the box body 1, and the box body 1 is installed on the flood discharge dam 4 through a connecting structure 3.

[0027] When the flood season comes, the cables of the adjacent dam sections are planned and concentrated according to the designed routing method. After the box 1 covers the cables, the box 1 is installed on the flood discharge dam 4 through the connecting structure 3 ( Figure 2 Only part of the structure of the flood discharge dam is shown in the figure), which can ensure the stability of the box 1 on the flood discharge dam 4. Under the action of the box 1, the water flow will not impact the cable, thereby effectively preventing the cable from being damaged and ensuring the reliability of the subsequent monitoring data; under the action of the cover plate 2, it can prevent the mud and hard objects in the water flow from entering the box 1. After the flood season, the cleaning of the mud in the box 1 can be avoided, thereby improving the construction efficiency of subsequent operations.

[0028] The box body 1 includes two first side panels 11 and two second side panels 12, both ends of the first side panels 11 are respectively connected to the second side panels 12 (welded or integrally formed), and the cover plate 2 is detachably arranged on the top of the box body 1. After the box body 1 covers the cables, the state of the cables in the box body 1 can be arranged through the opening on the top of the box body 1, so that the box body 1 completely covers the cables. The cover plate 2 can be directly inserted and covered on the top of the box body 1, or the box body 1 can be hinged.

[0029] The first side plate 11 and the second side plate 12 are both made of steel plates with a thickness of not less than 2 mm. The steel plates have strength, toughness and corrosion resistance, which can enhance the corrosion resistance of the box body 1 in water and enhance the deformation resistance of the box body 1.

[0030] refer to Figure 1 , angle steels 5 are provided at the top and bottom of the box body 1, and the angle steels 5 are respectively connected to the top and bottom of the first side panel 11 and the top and bottom of the second side panel 12 to hem the top and bottom of the box body 1 and enhance the overall structural strength of the box body 1. When the first side panel 11 is welded to the second side panel 12, angle steels are also provided at the connection position between the first side panel 11 and the second side panel 12. Providing angle steels at the connection position between the first side panel 11 and the second side panel 12 can improve the anti-deformation ability of the box body 1 and prevent the box body 1 from deforming under the impact of water flow. One end of the cover plate 2 is hinged to one of the first side panels 11 or the second side panel 12 of the box body 1 through a hinge 6.

[0031] refer to Figure 3The bottom of one of the first side panels 11 of the box 1 is provided with a wire conduit opening 7 for passing the cable; the wire conduit opening 7 can prevent interference between the cable and the box 1. When the box 1 covers the cable, the bottom of the second side panel 12 of the box 1 can be in good contact with the top surface of the flood discharge dam, and the wire conduit opening 7 can prevent the bottom of the box 1 from pressing the cable and causing damage to the cable. The cable is also wrapped with a waterproof geotextile (not shown in the figure). When water enters the box 1 from the gap of the box 1, the waterproof geotextile can prevent the cable from being soaked by water, ensuring the reliability of the subsequent work of the cable.

[0032] refer to Figure 2 , the main steel bar 8 of the flood discharge dam 4 extends out of the top of the flood discharge dam 4, and the box body 1 is connected to the main steel bar 8. During the connection between the box body 1 and the main steel bar 8, when the cover plate 2 is directly covered on the top of the box body 1, any side plate of the box body 1 can be welded to the main steel bar 8, and the connection structure 3 includes a first connection member 31, a first end of the first connection member 31 is welded to the cover plate 2, and a second end of the first connection member 31 is welded to the main steel bar 8; the first connection member 31 is used to stably cover the cover plate 2 on the box body 1, to ensure the stability of the cover plate 2 in the water flow, thereby effectively preventing mud and hard objects in the water from entering the box body 1. When the cover plate 2 is hinged to one of the first side panels 11 of the box body 1 through the hinge 6, the wire pipe opening is preferably arranged at the bottom of the other first side panel 11 opposite to the first side panel 11. When connecting the box body 1, the first side panel 11 of the box body 1 provided with the wire pipe opening 7 is welded to the main steel bar 8. Similarly, the first end of the first connecting member 31 is welded to the cover plate 2, and the second end of the first connecting member 31 is welded to the main steel bar 8.

[0033] The connection structure 3 also includes a second connection member 32, a first end of the second connection member 32 is welded to the first side plate 11 or the second side plate 12 of the box body 1, and a second end of the second connection member 32 is welded to the main steel bar 8. The second connection member 32 is used to improve the stability of the connection between the box body 1 and the main steel bar 8 to prevent the box body 1 from being washed away by the water flow. The second connection member 32 can also prevent the side plate of the box body 1 from being directly welded to the main steel bar 8, and when the box body 1 is dismantled later, the damage to the side plate of the box body 1 can be reduced.

[0034] The first connecting member 31 and the second connecting member 32 can both be made of steel bars (with a diameter of 22-28 mm) or screws; when the first connecting member 31 and the main steel bar 8, and the second connecting member 32 and the main steel bar 8 are connected by welding, after the flood season, the connection position between the first connecting member 31 and the main steel bar 8 and the connection position between the second connecting member 32 and the main steel bar 8 can be knocked off respectively, so as to remove the box 1 and allow the cables covered by the box 1 to be used normally.

[0035] When the connection structure 3 includes a first connection member 31 and a second connection member 32, the installation method of the box body 1 includes: after the cables of adjacent dam sections are planned and concentrated according to the designed routing method, the wire pipe opening 7 of the box body 1 clamps the cable pipe so that the box body 1 covers the cable, and the first side plate 11 of the box body 1 is close to or in contact with the main steel bar 8, and the bottom of the box body 1 is in contact with the top surface of the flood discharge dam; after observing and adjusting the cable state from the top of the box body 1, the cover plate 2 is closed, and then the cover plate 2 is connected to the main steel bar 8 by using the first connection member 31, and the second side plate 12 is connected to the main steel bar 8 by using the second connection member 32. The second connection member 32 can be set only on the second side plate 12 on the back water flow side of the box body 1, or it can be set on the water flow side and the second side plate 12 on the back water flow side of the box body. After connection, the first side plate 11 can also be welded to the main steel bar 8 to further improve the stability of the connection between the box body 1 and the main steel bar 8.

[0036] refer to Figure 4~Figure 6 The connection structure also includes a third connection member 33, which is detachably connected to the main steel bar 8. Under the action of the third connection member 33, damage to the box body 1 structure and the main steel bar 8 can be avoided during the removal of the box body 1, thereby increasing the number of turnovers of the box body 1 and ensuring the structural strength of the flood discharge dam 4. The third connection member 33 is a steel plate, and one or more first slide grooves 331 are arranged upward along the length of the third connection member 33 (refer to Figure 5 ), each first slide groove 331 is arranged along the height direction of the third connecting member 33; one or more second slide grooves 332 are respectively arranged near the left and right ends of the third connecting member 33, and each second slide groove 332 is arranged along the length direction of the third connecting member 33; correspondingly, one or more connecting tubes 9 are arranged in the height direction of the second side plate 12 of the box body 1, and one or more connecting tubes 9 are arranged in the length direction of the second end of the cover plate 2. The connecting tube 9 is welded to the second side plate 12 and the connecting tube 9 is welded to the cover plate 2. An internal thread is axially arranged on the connecting tube 9, so that the first connecting member 31 passes through the first slide groove 331 to be connected to the cover plate 2, and the second connecting member 32 passes through the second slide groove 332 to be connected to the second side plate 12 of the box body 1. Nuts are arranged on the first connecting member 31 and the second connecting member 32, and the box body 1 and the third connecting member 33 can be fastened together by rotating the nuts.

[0037] The third connector 33 is also provided with a connecting buckle 10, which is welded or detachably connected to the third connector 33. The connecting buckle 10 is used to make the third connector 33 detachably arranged on the main steel bar 8, so as to facilitate the later removal of the box body 1. The connecting buckle 10 is a cylindrical structure, and its inner diameter is adapted to the diameter of the main steel bar 8, so that the connecting buckle 10 can be sleeved on the main steel bar 8. A notch is provided on the connecting buckle 10, and connecting plates are respectively provided at both ends of the notch. The two connecting plates are connected by adjusting screws. By adjusting the adjusting screws, the distance between the two connecting plates can be reduced, so that the connecting buckle 10 is fastened to the main steel bar 8, so that the box body 1 and the main steel bar 8 are stably connected. A rubber ring is also provided in the connecting buckle 10. When the distance between the two connecting plates of the connecting buckle 10 is reduced, the rubber ring can be squeezed, thereby enhancing the stability of the connection between the connecting buckle 10 and the main steel bar 8.

[0038] The above is only a detailed description of the specific implementation of the utility model, rather than a limitation of the utility model. Various substitutions, modifications and improvements made by technicians in the relevant technical field without departing from the principle and scope of the utility model should be included in the protection scope of the utility model.

Claims

1. A protection device for flood discharge dam monitoring instrument cables during flood season, characterized in that: include: A box (1) with openings at both ends, the top of the box (1) being provided with a cover plate (2) for preventing mud and sand from entering the box (1), the box (1) being installed on a flood discharge dam (4) via a connecting structure (3); the box (1) comprising a first side plate (11) and two second side plates (12) arranged opposite to each other, the two ends of the first side plate (11) being respectively connected to the second side plates (12), the cover plate (2) being detachably arranged on the top of the box (1); angle steels (5) being arranged on the top and bottom of the box (1), the angle steels (5) being respectively connected to the top and bottom of the first side plate (11) and the top and bottom of the second side plate (12); the angle steels (5) being also arranged on the first side plate (11) and the second side plate (12). The side plate (11) and the second side plate (12) are connected at a connection position; the main steel bars (8) of the flood discharge dam (4) extend out of the top of the flood discharge dam (4), and the box body (1) is connected to the main steel bars (8) via a connection structure (3); the connection structure (3) comprises a first connection member (31), a first end of the first connection member (31) is connected to the cover plate (2), and a second end of the first connection member (31) is connected to the main steel bars (8); the connection structure (3) further comprises a second connection member (32), a first end of the second connection member (32) is connected to the first side plate (11) or the second side plate (12) of the box body (1), and a second end of the second connection member (32) is connected to the main steel bars (8).

2. The protection device for flood discharge dam monitoring instrument cables during flood season according to claim 1 is characterized in that: The connection structure (3) further comprises a third connection member (33), wherein one or more first slide grooves (331) are arranged in an upward direction along the length of the third connection member (33), and one or more second slide grooves (332) are arranged near the left and right ends of the third connection member (33), respectively; one or more connection tubes (9) are arranged in a height direction of the second side plate (12) of the box body (1), and one or more connection tubes (9) are arranged in a length direction of the second end of the cover plate (2), and an internal thread is axially arranged on the connection tube (9); the first connection member (31) passes through the first slide groove (331) to be connected to the cover plate (2), and the second connection member (32) passes through the second slide groove (332) to be connected to the box body (1); and a connection buckle (10) is arranged on the third connection member (33).

3. The protection device for flood discharge dam monitoring instrument cables during flood season according to claim 2 is characterized in that: The connecting buckle (10) is a cylindrical structure, the inner diameter of which matches the diameter of the main steel bar (8). The connecting buckle (10) is provided with a notch, and connecting plates are respectively provided at both ends of the notch. The two connecting plates are connected by an adjusting screw, and a rubber ring is provided inside the connecting buckle (10).

4. The protection device for flood discharge dam monitoring instrument cables during flood season according to any one of claims 1 to 3, characterized in that: The cover plate (2) is hingedly connected to one of the first side plates (11) or the second side plate (12) of the box body (1) via a hinge (6), or the cover plate (2) is inserted and covered on the top of the box body (1).

5. The protection device for flood discharge dam monitoring instrument cables during flood season according to any one of claims 1 to 3, characterized in that: A wire conduit opening (7) for allowing a cable to pass through is provided at the bottom of one of the first side plates (11) or the second side plate (12) of the box body (1).

6. The protection device for flood discharge dam monitoring instrument cables during flood season according to any one of claims 1 to 3, characterized in that: The cable is also wrapped with a waterproof geotextile.