Tool for correcting perpendicularity of pile section before welding
By designing a verticality correction tool before welding of pile segments including correction mechanism and clamping mechanism, the problem of unevenness and non-verticality of upper and lower pile segments in existing tools is solved, and accurate vertical correction and welding is achieved, improving construction accuracy and safety.
Patent Information
- Application Number
- CN202421489426.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-06-27
AI Technical Summary
The existing verticality correction tools before pile segment welding rely on naked eye operation, which easily leads to uneven alignment of the upper and lower pile segments and cannot be welded vertically, which in turn affects the perpendicularity of the holes.
A verticality correction tool including a base, a bracket, a correction mechanism and a clamping mechanism is designed. The correction mechanism achieves accurate correction of the pile segment through components such as fixed columns, telescopic columns, rotating shafts, triangular support plates, hydraulic cylinders, etc.; the clamping mechanism ensures stable clamping and measurement of the pile segment through components such as hydraulic cylinders, extrusion blocks, sliding blocks, etc.
This tool can accurately correct the verticality of the pile segments, ensure that the upper and lower pile segments are aligned and vertically welded, avoiding the problem of holes not perpendicular, and improving the accuracy and safety of welding.
Smart Images

Figure CN222817792U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to pile segment welding, in particular to a verticality correction tool before pile segment welding. Background Art
[0002] Pile segment welding is to embed low-carbon steel plates on the sides and end faces of the four corners of the upper and lower pile segments. The surface should be kept clean. It is a method of connecting piles. It can connect the upper and lower groups of pile segments to make them longer, so as to carry out deeper underground work and enable the pile segments to enter the underground deeper. Pile segment welding is suitable for all kinds of soil layers, and is suitable for piles with high bearing capacity, large aspect ratio, dense pile foundation or piles that need to pass through a certain thickness of hard soil layer and difficult pile sinking. However, the existing pile segment welding basically only splices the pile segments of the upper and lower links, but the splicing requires the intervention of auxiliary tools to make the pile segments better docked. Therefore, a verticality correction tool before pile segment welding is particularly needed.
[0003] However, most of the existing verticality correction tools for pile segment welding use a crane to lift a pile segment and place it in contact with the pile segment at the lower end, then simply fix it with a tool, and then command the crane to move by eye to align the upper and lower pile segments, and then start welding directly. This may cause the upper and lower pile segments to be misaligned, resulting in the upper and lower pile segments not being vertical, so that the drilled holes are not vertical enough. Utility Model Content
[0004] The utility model aims to provide a verticality correction tool before welding a pile segment, so as to solve the problem of the verticality correction tool before welding a pile segment proposed in the above-mentioned background technology. Most of the verticality correction tools for welding pile segments use a crane to lift a section of the pile segment, so that it is placed in close contact with the pile segment at the lower end, and then simply fixed by a tool, and then the crane is directed to move by the naked eye to align the upper and lower pile segments, and then welding is started directly, which may cause the upper and lower pile segments to be uneven, resulting in the upper and lower pile segments not being vertical, so that the drilled holes are not vertical enough.
[0005] To achieve the above object, the utility model provides the following technical solution: a verticality correction tool before welding a pile segment, comprising a base, a bracket fixedly connected to one side surface of the base, a correction mechanism provided on one side surface of the bracket, and a clamping mechanism provided on one side surface of the base;
[0006] The correction mechanism includes a fixed column, a telescopic column, a rotating shaft, a triangular support plate, a connecting block, a first hydraulic cylinder, a tripod, a first extrusion block, a fixed plate, a limiting ring and a through groove, one side surface of the bracket is fixedly connected with the fixed column, one side surface of the fixed column is provided with a telescopic column, one side surface of the telescopic column is penetrated by the rotating shaft, the outer surface of the rotating shaft is provided with a triangular support plate, one side surface of the triangular support plate is fixedly connected with the connecting block, one side surface of the connecting block is fixedly connected with the first hydraulic cylinder, one side surface of the first hydraulic cylinder is fixedly connected with the tripod, one side surface of the telescopic column is fixedly connected with the first extrusion block, one side surface of the bracket is fixedly connected with the fixed plate, one side surface of the fixed plate is fixedly connected with the limiting ring, and one side surface of the limiting ring is provided with a through groove.
[0007] Preferably, three groups of the fixing columns are arranged on the bracket, and three groups of the rotating shafts are arranged on the triangular support plate.
[0008] Preferably, one side plate of the triangular support plate is fixedly connected to the connecting block, and three groups of the first hydraulic cylinders are arranged on the bracket.
[0009] Preferably, three groups of through grooves are provided on the limiting ring, and the inner surface of the fixed column and the outer surface of the telescopic column are in contact with each other.
[0010] Preferably, the clamping mechanism includes a second hydraulic cylinder, a second extrusion block, a sliding block, a sliding groove, a mounting block, a mounting groove and a bubble level; one side surface of the base is fixedly connected to the second hydraulic cylinder, one side surface of the second hydraulic cylinder is fixedly connected to the second extrusion block, one side surface of the second extrusion block is fixedly connected to the sliding block, one side surface of the base is provided with a sliding groove, one side surface of the second extrusion block is fixedly connected to the mounting block, one side surface of the mounting block is provided with a mounting groove, and a bubble level is arranged inside the mounting groove.
[0011] Preferably, the second hydraulic cylinders are provided in three groups on the base, and the sliding grooves are provided in three groups on the base.
[0012] Compared with the prior art, the utility model has the following beneficial effects: the verticality correction tool before welding the pile segment is provided through the first hydraulic cylinder, the rotating shaft, the fixed column, the telescopic column, the connecting block, the triangular support plate, the through groove, the first extrusion block, the limiting ring and the fixed plate. When the pile segment needs to be corrected, the first hydraulic cylinder is started first, and then the extension and retraction of the first hydraulic cylinder is controlled according to the measured deviation value. When the first hydraulic cylinder is extended, the rotating shaft will rotate on the fixed column, the telescopic column and the connecting block respectively, thereby driving the triangular support plate to open to form an obtuse triangle, thereby pushing the telescopic column to extend from the inside of the fixed column, and then sliding in the through groove, thereby pushing the first extrusion block to squeeze the pile segment and correct it. Through the provision of the limiting ring and the fixed plate, the pile segment can be prevented from being excessively tilted, thereby causing dangerous problems. Such correction can enable the upper and lower pile segments to be accurately welded, so that they will be vertical when punching holes, and will not be crooked. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the side view of the appearance structure of the utility model;
[0014] Figure 2 This is a schematic diagram of the structure of the first hydraulic cylinder and the tripod cooperating with each other in the utility model;
[0015] Figure 3 This is a schematic diagram of the structure of the clamping mechanism of the utility model;
[0016] Figure 4 For this utility model Figure 2 The enlarged structural diagram at A in the middle;
[0017] Figure 5 For this utility model Figure 3 Enlarged structural diagram at B in the middle.
[0018] In the figure: 1. base; 2. bracket; 3. correction mechanism; 301. fixed column; 302. telescopic column; 303. rotating shaft; 304. triangular support plate; 305. connecting block; 306. first hydraulic cylinder; 307. tripod; 308. first extrusion block; 309. fixed plate; 310. limiting ring; 311. through groove; 4. clamping mechanism; 401. second hydraulic cylinder; 402. second extrusion block; 403. sliding block; 404. sliding groove; 405. mounting block; 406. mounting groove; 407. bubble level. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-5 The utility model provides a technical solution: a verticality correction tool before welding a pile segment, comprising a base 1, a bracket 2 is fixedly connected to one side surface of the base 1, a correction mechanism 3 is arranged on one side surface of the bracket 2, and a clamping mechanism 4 is arranged on one side surface of the base 1;
[0021] The correction mechanism 3 includes a fixed column 301, a telescopic column 302, a rotating shaft 303, a triangular support plate 304, a connecting block 305, a first hydraulic cylinder 306, a tripod 307, a first extrusion block 308, a fixed plate 309, a limiting ring 310 and a through groove 311. The fixed column 301 is fixedly connected to one side surface of the bracket 2, the telescopic column 302 is arranged on one side surface of the fixed column 301, the rotating shaft 303 is penetrated on one side surface of the telescopic column 302, and the outer surface of the rotating shaft 303 is arranged A triangular support plate 304 is provided, one side surface of the triangular support plate 304 is fixedly connected to a connecting block 305, one side surface of the connecting block 305 is fixedly connected to a first hydraulic cylinder 306, one side surface of the first hydraulic cylinder 306 is fixedly connected to a tripod 307, one side surface of the telescopic column 302 is fixedly connected to a first extrusion block 308, one side surface of the bracket 2 is fixedly connected to a fixing plate 309, one side surface of the fixing plate 309 is fixedly connected to a limiting ring 310, and one side surface of the limiting ring 310 is opened. A through slot 311 is provided. Through the arrangement of the fixed column 301, the telescopic column 302, the rotating shaft 303, the triangular support plate 304, the connecting block 305, the first hydraulic cylinder 306, the tripod 307, the first extrusion block 308, the fixed plate 309, the limiting ring 310 and the through slot 311, when the pile segment needs to be corrected, the first hydraulic cylinder 306 is first started, and then the extension and retraction of the first hydraulic cylinder 306 is controlled according to the measured deviation value. When the first hydraulic cylinder 306 is extended, the rotating shaft 303 The fixed column 301 and the telescopic column 302 will rotate on the connecting block 305 respectively, thereby driving the triangular support plate 304 to open and form an obtuse triangle, thereby pushing the telescopic column 302 to extend from the inside of the fixed column 301, and then slide in the through groove 311, thereby pushing the first extrusion block 308 to squeeze the pile segment to correct it. Through the arrangement of the limit ring 310 and the fixed plate 309, the pile segment can be prevented from being excessively tilted, thereby causing dangerous problems.
[0022] Furthermore, three groups of fixed columns 301 are provided on the bracket 2, and three groups of rotating shafts 303 are provided on the triangular support plate 304. By disposing the fixed columns 301 on the bracket 2, the pile segment can be better corrected so that the pile segment can be pushed from multiple angles. By disposing the rotating shafts 303 on the triangular support plate 304, the telescopic columns 302 can be better driven to telescope, thereby better driving the first extrusion block 308 to push.
[0023] Furthermore, one side plate of the triangular support plate 304 is fixedly connected to the connecting block 305, and three groups of first hydraulic cylinders 306 are arranged on the bracket 2. Through the arrangement of the triangular support plate 304 and the connecting block 305, the triangular support plate 304 can be better extended, so that it can better drive the telescopic column 302 to extend and retract. Through the arrangement of the first hydraulic cylinder 306 on the bracket 2, the first hydraulic cylinder 306 and the triangular support plate 304 can be better coordinated, so that it can better push the pile segment for adjustment.
[0024] Furthermore, three groups of through grooves 311 are opened on the limiting ring 310, and the inner surface of the fixed column 301 and the outer surface of the telescopic column 302 are fitted together. By setting the through grooves 311 on the limiting ring 310, the telescopic column 302 can be better extended and retracted, thereby driving the first extrusion block 308 to extrude. By setting the fixed column 301 and the telescopic column 302, the telescopic column 302 can be better extended and retracted, so that the first hydraulic cylinder 306 can better drive the telescopic column 302 to move when extending and retracting, and will not cause it to be subjected to greater resistance.
[0025] Furthermore, the clamping mechanism 4 includes a second hydraulic cylinder 401, a second extrusion block 402, a sliding block 403, a sliding groove 404, a mounting block 405, a mounting groove 406 and a bubble level 407. The second hydraulic cylinder 401 is fixedly connected to one side surface of the base 1, the second extrusion block 402 is fixedly connected to one side surface of the second hydraulic cylinder 401, the sliding block 403 is fixedly connected to one side surface of the second extrusion block 402, the sliding groove 404 is provided on one side surface of the base 1, the second extrusion block 402 is fixedly connected to one side surface of the mounting block 405, the mounting groove 406 is provided on one side surface of the mounting block 405, and the interior of the mounting groove 406 is provided with a bubble level. The level 407, through the arrangement of the second hydraulic cylinder 401, the second extrusion block 402, the sliding block 403, the sliding groove 404, the mounting block 405, the mounting groove 406 and the bubble level 407, can, when clamping is required, first pass the base 1 through a section of pile column, then start the second hydraulic cylinder 401, thereby driving the second extrusion block 402 to extrude the pile section, at this time the sliding block 403 will slide in the sliding groove 404, so that the second extrusion block 402 will not be offset, then it will be fixed, and then the bubble level 407 will be inserted into the mounting groove 406 to engage it, thereby fixing the bubble level 407 to measure the verticality of the pile section.
[0026] Furthermore, three groups of second hydraulic cylinders 401 are provided on the base 1, and three groups of sliding grooves 404 are opened on the base 1. By setting the second hydraulic cylinder 401 on the base 1, the second extrusion block 402 can be better coordinated so that the pile segment can be better fixed. By setting the sliding groove 404 on the base 1, the sliding block 403 can limit the second extrusion block 402 so that it will not deviate and can be better fixed.
[0027] Working principle: First, when vertical correction is required, the base 1 is first passed through a section of pile column, and then the second hydraulic cylinder 401 is started, thereby driving the second extrusion block 402 to extrude the pile segment. At this time, the sliding block 403 will slide in the sliding groove 404 to fix it, and then the bubble level 407 is inserted into the installation groove 406 to engage it, thereby fixing the bubble level 407 to measure the verticality of the pile segment, and then the second pile segment is placed in the device. At this time, the first hydraulic cylinder 306 is first started, and then the extension and contraction of the first hydraulic cylinder 306 is controlled according to the measured deviation value. When the first hydraulic cylinder 306 is extended, the rotating shaft 303 will rotate on the fixed column 301 and the telescopic column 302 and the connecting block 305 respectively, thereby driving the triangular support plate 304 to open, forming an obtuse triangle, thereby pushing the telescopic column 302 to extend from the inside of the fixed column 301, and then sliding in the through groove 311, thereby pushing the first extrusion block 308 to extrude the pile segment to correct it.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A verticality correction tool before welding a pile segment, comprising a base (1), characterized in that: A bracket (2) is fixedly connected to one side surface of the base (1), a correction mechanism (3) is provided on one side surface of the bracket (2), and a clamping mechanism (4) is provided on one side surface of the base (1); The correction mechanism (3) comprises a fixed column (301), a telescopic column (302), a rotating shaft (303), a triangular support plate (304), a connecting block (305), a first hydraulic cylinder (306), a tripod (307), a first extrusion block (308), a fixed plate (309), a limiting ring (310) and a through groove (311); a fixed column (301) is fixedly connected to a side surface of the bracket (2); a telescopic column (302) is arranged on a side surface of the fixed column (301); a rotating shaft (303) is penetrated through a side surface of the telescopic column (302); and a tripod is arranged on an outer surface of the rotating shaft (303). An angle support plate (304), one side surface of the triangular support plate (304) is fixedly connected to a connection block (305), one side surface of the connection block (305) is fixedly connected to a first hydraulic cylinder (306), one side surface of the first hydraulic cylinder (306) is fixedly connected to a tripod (307), one side surface of the telescopic column (302) is fixedly connected to a first extrusion block (308), one side surface of the bracket (2) is fixedly connected to a fixing plate (309), one side surface of the fixing plate (309) is fixedly connected to a limiting ring (310), and one side surface of the limiting ring (310) is provided with a through groove (311).
2. A verticality correction tool before pile segment welding according to claim 1, characterized in that: The fixing columns (301) are arranged in three groups on the bracket (2), and the rotating shafts (303) are arranged in three groups on the triangular support plate (304).
3. A verticality correction tool before pile segment welding according to claim 1, characterized in that: One side plate of the triangular support plate (304) is fixedly connected to the connecting block (305), and three groups of the first hydraulic cylinders (306) are arranged on the bracket (2).
4. A verticality correction tool before pile segment welding according to claim 1, characterized in that: The through grooves (311) are provided in three groups on the limiting ring (310), and the inner surface of the fixed column (301) and the outer surface of the telescopic column (302) are in contact with each other.
5. The verticality correction tool before pile segment welding according to claim 1 is characterized by: The clamping mechanism (4) comprises a second hydraulic cylinder (401), a second extrusion block (402), a sliding block (403), a sliding groove (404), a mounting block (405), a mounting groove (406) and a bubble level (407); one side surface of the base (1) is fixedly connected to the second hydraulic cylinder (401); one side surface of the second hydraulic cylinder (401) is fixedly connected to the second extrusion block (402); one side surface of the second extrusion block (402) is fixedly connected to the sliding block (403); one side surface of the base (1) is provided with a sliding groove (404); one side surface of the second extrusion block (402) is fixedly connected to the mounting block (405); one side surface of the mounting block (405) is provided with a mounting groove (406); and a bubble level (407) is arranged inside the mounting groove (406).
6. A verticality correction tool before pile segment welding according to claim 5, characterized in that: The second hydraulic cylinders (401) are provided in three groups on the base (1), and the sliding grooves (404) are provided in three groups on the base (1).