Torpedo ladle working lining brick convenient to splice and use
By designing a conveniently spliced torpedo tank working lining brick, the positioning blocks and fixing components are used to achieve accurate splicing and tight connection of bricks, the problem of large damage rate of iron seepage and working lining in the brick joints in the prior art is solved, and the sealing and service life are improved.
Patent Information
- Application Number
- CN202421533645.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-07-01
AI Technical Summary
The existing torpedo tank working lining bricks are prone to the problem of iron seepage between brick joints, and the working lining at the bottom and bottom of the wall washed by the iron injection flow is high, resulting in local erosion and heavy erosion.
A torpedo tank working lining brick is designed for easy splicing. The precise positioning of the bricks is achieved by setting up positioning blocks and positioning grooves. The first fixing component and the second fixing component are used for rapid splicing, reducing the occurrence of brick joints, and filling the gap with brick glue to improve sealing.
It realizes a tight connection between bricks, improves the overall sealing of the lining, reduces the occurrence of iron seepage problems, and extends the service life of the working lining.
Smart Images

Figure CN222817950U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of torpedo tank working lining bricks, in particular to a torpedo tank working lining brick which is convenient to splice and use. Background Art
[0002] A molten iron ladle is a container used to transport molten iron in blast furnace ironmaking. A working lining is generally provided inside the ladle. The current working lining is mostly made of high-alumina bricks or clay bricks.
[0003] However, the current brick masonry method is prone to iron seepage in the brick joints. At the same time, the working lining of the tank bottom and the lower part of the wall, which are washed by the molten iron flow, has a high damage rate and is severely washed and eroded locally, which is different from the working lining of other parts. In response to the above problems, we have launched a torpedo tank working lining brick that is easy to splice and use. Utility Model Content
[0004] The utility model discloses a torpedo tank working lining brick which is convenient for splicing and use. The utility model studies and improves the existing structure and defects, and provides a torpedo tank working lining brick which is convenient for splicing and use, so as to achieve the purpose of better practical value.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A torpedo tank working lining brick that is easy to splice and use, comprising a first brick body, a second brick body is arranged on one side of the first brick body, a third brick body is arranged on the bottom of the first brick body and the second brick body, a positioning block is fixedly connected to one side of the first brick body, a positioning groove is opened on one side of the second brick body, the outer side of the positioning groove is slidably connected to the inner side of the positioning groove, a first fixing component is arranged between one side of the first brick body and the second brick body, and a second fixing component is arranged on the top of the third brick body.
[0007] In a preferred solution, the first fixing assembly includes first connecting grooves, which are equidistantly provided on one side of the first brick body, and second connecting grooves are equidistantly provided on one side of the second brick body.
[0008] In a preferred solution, fixed blocks are equidistantly arranged on one side of the first brick body, a first connecting block is fixedly connected to one side of the fixed block, an outer side of the first connecting block is slidably connected to the inside of the first connecting groove, and a second connecting block is fixedly connected to the other side of the fixed block, an outer side of the second connecting block is slidably connected to the inside of the second connecting groove.
[0009] In a preferred solution, the depths of the first connection groove and the second connection groove are both 5CM, and the lengths of the fixing block, the first connection block and the second connection block are all 10CM.
[0010] In a preferred solution, the top of the third brick body is fixedly connected with a first mounting block and a second mounting block, and the outer sides of the first mounting block and the second mounting block are slidably connected with the inside of one of the first connecting grooves and one of the second connecting grooves, respectively.
[0011] In a preferred solution, the height of the first brick body and the second brick body is 50CM-100CM.
[0012] The utility model provides a torpedo tank working lining brick that is convenient for splicing and use, which has the following advantages:
[0013] By setting the positioning block and the positioning groove, the first brick body and the second brick body can be conveniently and accurately positioned to ensure the accurate splicing of the bricks, which can avoid the bricks from being misplaced or offset. By setting the first fixing component, the first brick body and the second brick body can be quickly spliced to form a group of bricks. Then, each group of bricks are spliced together through the first fixing component, and then the top of the third brick body is connected to the bottom of the first group of bricks through the second fixing component. Finally, each gap is brushed with brick glue. By setting the first fixing component and the second fixing component, not only can the bricks be quickly and firmly spliced together to form a group of bricks, but the generation of brick joints can also be reduced, ensuring the close connection between bricks, improving the overall sealing of the lining, and reducing the risk of iron seepage. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model provides a three-dimensional schematic diagram of a torpedo tank working lining brick which is convenient for splicing and use.
[0015] Figure 2 The utility model provides a schematic diagram of the main view of a torpedo tank working lining brick that is convenient for splicing and use.
[0016] Figure 3 This is a schematic diagram of the explosion of the first part of a torpedo tank working lining brick that is convenient for splicing and use proposed by the utility model.
[0017] Figure 4 This is a schematic diagram of the explosion of the second part of a torpedo tank working lining brick that is convenient for splicing and use proposed by the utility model.
[0018] Figure 5 The utility model provides a torpedo tank working lining brick which is convenient for splicing and use. Figure 2 Enlarged schematic diagram at point A in the middle.
[0019] Figure 6 The utility model provides a torpedo tank working lining brick which is convenient for splicing and use. Figure 2 Enlarged schematic diagram of point B in the middle.
[0020] In the accompanying drawings: 1. first brick body; 2. second brick body; 3. third brick body; 4. first connecting groove; 5. second connecting groove; 6. fixing block; 7. first connecting block; 8. second connecting block; 9. positioning block; 10. first mounting block; 11. second mounting block; 12. positioning groove. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application usually described and marked in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0022] The utility model discloses a torpedo tank working lining brick which is convenient for splicing and use and is mainly used in the scene of a molten iron tank.
[0023] Reference Figures 1 to 6 A torpedo tank working lining brick that is convenient for splicing and use, comprising: a first brick body 1, a second brick body 2 is arranged on one side of the first brick body 1, a third brick body 3 is arranged at the bottom of the first brick body 1 and the second brick body 2, a positioning block 9 is fixedly connected to one side of the first brick body 1, a positioning groove 12 is opened on one side of the second brick body 2, the outer side of the positioning groove 12 is slidably connected to the inner side of the positioning groove 12, a first fixing component is arranged between one side of the first brick body 1 and the second brick body 2, and a second fixing component is arranged on the top of the third brick body 3.
[0024] In the above technical scheme, considering that the existing brick masonry method is prone to iron seepage in brick joints, in order to solve such problems, the specific operations are as follows: by setting the positioning block 9 and the positioning groove 12, the first brick body 1 and the second brick body 2 can be conveniently and accurately positioned to ensure the accurate splicing of the bricks, so as to avoid brick dislocation or offset. By setting the first fixing component, the first brick body 1 and the second brick body 2 can be quickly spliced to form a group of bricks, and then each group of bricks are spliced together through the first fixing component, and then the top of the third brick body 3 is connected to the bottom of the first group of bricks through the second fixing component. Finally, each gap is brushed with brick glue. By setting the first fixing component and the second fixing component, not only can the bricks be quickly and firmly spliced together to form a group of bricks, but also the generation of brick joints can be reduced, ensuring the close connection between the bricks, improving the overall sealing of the lining, and reducing the risk of iron seepage.
[0025] Reference Figures 1 to 6 In a preferred embodiment, the first fixing assembly includes a first connecting groove 4, the first connecting groove 4 is equidistantly opened on one side of the first brick body 1, a second connecting groove 5 is equidistantly opened on one side of the second brick body 2, a fixing block 6 is equidistantly arranged on one side of the first brick body 1, a first connecting block 7 is fixedly connected to one side of the fixing block 6, the outer side of the first connecting block 7 is slidably connected to the inside of the first connecting groove 4, the other side of the fixing block 6 is fixedly connected to the second connecting block 8, the outer side of the second connecting block 8 is slidably connected to the inside of the second connecting groove 5, the depth of the first connecting groove 4 and the second connecting groove 5 are both 5CM, the length of the fixing block 6, the first connecting block 7 and the second connecting block 8 are all 10CM, and the top of the third brick body 3 is respectively fixedly connected with a first mounting block 10 and a second mounting block 11, and the outer sides of the first mounting block 10 and the second mounting block 11 are respectively slidably connected to the inside of one of the first connecting grooves 4 and one of the second connecting grooves 5;
[0026] In the above technical solution, considering that the existing brick masonry method is prone to iron seepage in the brick joints, in order to solve such problems, the specific operations are as follows: align the positioning block 9 with the positioning groove 12, stick the first brick body 1 and the second brick body 2 together, so that the positioning block 9 completely enters the positioning groove 12, and then align the fixing block 6, the first connecting block 7 and the second connecting block 8 with the first connecting groove 4 and the second connecting groove 5, and put them in, so that the first brick body 1 and the second brick body 2 are spliced together to form a group of bricks, and then the first installation block 7 on the top of the third brick body 3 is fixed. The mounting block 10 and the second mounting block 11 are placed in correspondence with the first connecting groove 4 and the second connecting groove 5 at the bottom of the first brick body 1 and the second brick body 2, so that the third brick body 3 is spliced at the bottom of the first group of bricks, and then the second group of bricks and the first group of bricks are spliced again between groups through the fixing block 6, the first connecting block 7 and the second connecting block 8. The operation is simple, convenient and fast. Finally, the gap inside and outside is brushed with brick glue to form a group of bricks. This can reduce the generation of brick joints, ensure the close connection between bricks, improve the overall sealing of the lining, and reduce the occurrence of iron seepage problems.
[0027] Reference Figure 3 and Figure 6 In a preferred embodiment, the height of the first brick body 1 and the second brick body 2 is 50CM-100CM;
[0028] Working principle: When in use, align the positioning block 9 with the positioning groove 12, stick the first brick body 1 and the second brick body 2 together, so that the positioning block 9 completely enters the positioning groove 12, and then align the fixing block 6, the first connecting block 7 and the second connecting block 8 with the first connecting groove 4 and the second connecting groove 5, and put them in, so as to splice the first brick body 1 and the second brick body 2 together to form a group of bricks, and then put the first mounting block 10 and the second mounting block 11 on the top of the third brick body 3 into the first connecting groove 4 and the second connecting groove 5 at the bottom of the first brick body 1 and the second brick body 2, so as to splice the third brick body 3 at the bottom of the first group of bricks, and then splice the second group of bricks with the first group of bricks again through the fixing block 6, the first connecting block 7 and the second connecting block 8. The operation is simple, convenient and fast. Finally, brush the inside and outside of the gap with brick glue to form a group of bricks. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0029] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited to this. The replacement can be a replacement of part of the structure, device, method step, or a complete technical solution. Equivalent replacement or change based on the technical solution of the utility model and its utility model concept should be included in the protection scope of the utility model.
Claims
1. A torpedo tank working lining brick that is convenient for splicing and use, comprising a first brick body (1), characterized in that: A second brick body (2) is arranged on one side of the first brick body (1), and a third brick body (3) is arranged at the bottom of each of the first brick body (1) and the second brick body (2). A positioning block (9) is fixedly connected to one side of the first brick body (1), and a positioning groove (12) is provided on one side of the second brick body (2). The outer side of the positioning groove (12) is slidably connected to the inner side of the positioning groove (12). A first fixing component is arranged between one side of the first brick body (1) and the second brick body (2), and a second fixing component is arranged on the top of the third brick body (3).
2. A torpedo tank working lining brick that is convenient for splicing and use according to claim 1, characterized in that: The first fixing assembly comprises first connecting grooves (4), the first connecting grooves (4) being equidistantly provided on one side of the first brick body (1), and second connecting grooves (5) being equidistantly provided on one side of the second brick body (2).
3. A torpedo tank working lining brick that is convenient for splicing and use according to claim 2, characterized in that: One side of the first brick body (1) is provided with fixed blocks (6) at equal intervals, one side of the fixed block (6) is fixedly connected to a first connecting block (7), the outer side of the first connecting block (7) is slidably connected to the inside of the first connecting groove (4), and the other side of the fixed block (6) is fixedly connected to a second connecting block (8), the outer side of the second connecting block (8) is slidably connected to the inside of the second connecting groove (5).
4. A torpedo tank working lining brick that is convenient for splicing and use according to claim 3, characterized in that: The depth of the first connection groove (4) and the second connection groove (5) are both 5 cm, and the length of the fixing block (6), the first connection block (7) and the second connection block (8) are all 10 cm.
5. The torpedo tank working lining brick convenient for splicing and use according to claim 1 is characterized in that: The top of the third brick body (3) is fixedly connected to a first mounting block (10) and a second mounting block (11), respectively; the outer sides of the first mounting block (10) and the second mounting block (11) are slidably connected to the inside of one of the first connecting grooves (4) and one of the second connecting grooves (5), respectively.
6. The torpedo tank working lining brick convenient for splicing and use according to claim 1 is characterized in that: The height of the first brick body (1) and the second brick body (2) is 50CM-100CM.