Quick-release connecting device for foundation pit support structure and concrete waist beam
By designing a quick disassembly connection device between the foundation pit enclosure structure and the concrete waist beam, the rapid disassembly and assembly function is achieved using interlocking connecting parts, the problems of long construction cycle, high cost and serious material waste in traditional connection methods are solved, and efficient and environmentally friendly construction results are achieved.
Patent Information
- Application Number
- CN202421852949.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-08-01
AI Technical Summary
The connection method between the traditional foundation pit enclosure structure and the concrete waist beam depends on concrete pouring, resulting in long construction cycles, high costs, serious material waste, difficulty in demolition and environmental pollution.
A quick disassembly connection device between the foundation pit enclosure structure and the concrete waist beam is designed. By setting interlocking connecting parts between the foundation pit enclosure structure and the concrete waist beam, the rapid disassembly and assembly function is achieved. The device includes a foundation pit connection base, a waist beam connection port, a fixing hole, a limiting hole and a removable limiting rod, which can achieve firm connection and rapid disassembly without the use of traditional concrete pouring methods.
The device greatly simplifies the construction process, reduces the demand for construction materials, reduces construction costs and time, and achieves the efficient utilization of resources and environmental protection goals. At the same time, through the rapid disassembly and assembly function, the construction efficiency is improved, the risk of error is reduced, and the stability and safety of the connection are ensured.
Smart Images

Figure CN222834917U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit support construction, in particular to a quick-detachable connection device for a foundation pit enclosure structure and a concrete waist beam. Background Art
[0002] In construction projects, the connection between the foundation pit retaining structure and the concrete waist beam is a very important link. The traditional connection between the foundation pit retaining structure and the concrete waist beam is usually made by pouring concrete. Although the concrete pouring method can provide strong connection strength and stability, it also has many shortcomings. First, concrete pouring requires a long construction period, and a large amount of manpower and material resources are required during the construction process, which increases the cost of the project. Secondly, once the concrete structure is formed, it is very difficult to dismantle, and heavy machinery is usually required for demolition, resulting in material waste and environmental pollution. In addition, the connection method of concrete pouring lacks flexibility and is difficult to adapt to temporary adjustment needs that may arise in the project. An underground continuous wall and waist beam connection structure in a foundation pit published in an existing patent (Announcement No.: CN217629972U) has at least the following defects exposed during use:
[0003] 1. If the disassembly and assembly functions of the foundation pit retaining structure and the concrete waist beam are not achieved through the mutual cooperation between the structures, the construction process will have to rely on the traditional concrete pouring method. This will lead to an increase in construction complexity, because concrete pouring requires a lot of preparation work and precise construction steps. Material waste will also increase. Concrete pouring is used once and cannot be reused when it is demolished, resulting in a large amount of material waste, which does not meet the requirements of saving resources and environmental protection. Rising costs are another problem. Since more materials and human resources are needed, the construction cost will increase significantly, especially when frequent disassembly and assembly are required. The demolition process will also become more difficult. Once the concrete structure is solidified, the demolition process is cumbersome and time-consuming, and heavy machinery may be required, which increases the difficulty and danger of demolition. Finally, the environmental impact will also increase. The concrete pouring and demolition process will generate a large amount of construction waste and dust, increasing the environmental burden and pollution risk.
[0004] 2. If the function of rapid disassembly and assembly is not achieved by installing fixed blocks, fixed holes, removable limit rods and limit holes, the installation efficiency will be low, because without the design of fixed blocks and limit holes, the connection between the foundation pit retaining structure and the concrete waist beam will require additional fixing measures, which increases the time and complexity of installation. The disassembly and assembly process will also become cumbersome. The lack of removable limit rods and limit holes requires more tools and steps during disassembly, and rapid disassembly and assembly cannot be achieved, which reduces construction efficiency. Operational risks will also increase. The increase in manual operation steps can easily lead to construction errors and safety accidents, increasing the risks in the construction process. The connection may not be stable enough. Without the precise positioning of fixed blocks and limit holes, the connection structure may not be stable enough, affecting the overall construction quality and safety. Finally, the maintenance cost will also increase. The disassembly and assembly process is complicated and time-consuming, which increases the cost of maintenance and replacement of parts, and is not conducive to long-term use and maintenance. Utility Model Content
[0005] The main purpose of the utility model is to provide a quick-release connection device for a foundation pit retaining structure and a concrete waist beam, which can effectively solve the problems in the background technology.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] A quick-release connection device for a foundation pit enclosure structure and a concrete waist beam, which is divided into a connection area and an installation area. The connection area includes a foundation pit connection base, which is characterized in that: peripheral screw holes are installed around the foundation pit connection base, a waist beam connection port is installed above the foundation pit connection base, a fixing hole is installed in front of the waist beam connection port, and a limiting hole is installed on the left side of the waist beam connection port;
[0008] The connection area includes a fixed block and a detachable limiting rod, and is characterized in that three detachable limiting rods are installed in front of the fixed block, and the detachable limiting rods pass through the fixed block.
[0009] Preferably, the foundation pit connection base adopts a frustum design.
[0010] Preferably, a fixing screw hole is installed in the middle of the waist beam connecting port.
[0011] Preferably, the fixing holes and the limiting holes are distributed in a cross shape.
[0012] Preferably, the fixing hole passes through the waist beam connecting port.
[0013] Preferably, the limiting hole passes through the waist beam connecting port.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. The utility model realizes the disassembly and assembly of the foundation pit retaining structure and the concrete waist beam through the mutual cooperation between the structures, so that it does not need to use concrete pouring and can be reused. Specifically, the utility model designs an ingenious connection device, by setting interlocking connection parts between the foundation pit retaining structure and the concrete waist beam, so that the two can be firmly connected together without using traditional concrete pouring methods. This design not only greatly simplifies the construction process and reduces the demand for construction materials, but also effectively reduces construction costs and time. In addition, since concrete pouring is not required, tedious demolition work is no longer required during disassembly. The foundation pit retaining structure can be separated from the concrete waist beam with simple operations, which is convenient for repeated use, achieving efficient resource utilization and environmental protection goals.
[0016] 2. The utility model realizes the function of quick disassembly and assembly by installing fixed blocks, fixed holes, removable limit rods and limit holes. Specifically, the design of the fixed blocks and limit holes makes the connecting device highly flexible and convenient. During the installation process, it is only necessary to insert the fixed block into the fixed hole, and then insert the removable limit rod from the limit hole and pass through the fixed block. A quick and stable connection can be achieved without the need for additional fixing measures, which greatly improves the construction efficiency. When disassembly is required, only simple tools are needed to dismantle the structure, and the entire disassembly and assembly process is fast and convenient. Such a design not only reduces the complexity of manual operation and improves work efficiency, but also reduces the risk of errors during the construction process, ensuring that the connection between the foundation pit retaining structure and the concrete waist beam is stable and reliable, but also makes the disassembly and assembly process safer and more efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of the installation area of the utility model;
[0018] Figure 2 This is a top view structural diagram of the installation area of the utility model;
[0019] Figure 3 This is a schematic diagram of the overall structure of the connection area of the utility model;
[0020] In the figure: 1. Foundation pit connection base; 2. Fixing block; 3. Peripheral screw holes; 4. Waist beam connection port; 5. Fixing hole; 6. Limiting hole; 7. Removable limiting rod; 8. Fixing screw hole. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0022] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0023] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] Example
[0025] See also Figure 1-3 , the utility model provides a technical solution:
[0026] A quick-release connection device for a foundation pit enclosure structure and a concrete waist beam, which is divided into a connection area and an installation area. The connection area includes a foundation pit connection base, which is characterized in that: peripheral screw holes are installed around the foundation pit connection base, a waist beam connection port is installed above the foundation pit connection base, a fixing hole is installed in front of the waist beam connection port, and a limiting hole is installed on the left side of the waist beam connection port;
[0027] The connection area includes a fixed block and a detachable limiting rod, and is characterized in that three detachable limiting rods are installed in front of the fixed block, and the detachable limiting rods pass through the fixed block.
[0028] Specifically, the foundation pit connection base adopts a truncated cone design.
[0029] Specifically, a fixing screw hole is installed in the middle of the waist beam connecting port.
[0030] Specifically, the fixing holes and the limiting holes are distributed in a cross shape.
[0031] Specifically, the fixing hole passes through the waist beam connecting port.
[0032] Specifically, the limiting hole passes through the waist beam connecting port.
[0033] Compare Projects New connection device General concrete connection Installation Complexity Low high Material utilization high Low Construction costs Low high Difficulty of disassembly Low high Environmental impact Low high
[0034] In this embodiment, the fixed block and the detachable limit rod adopt H-Beams of Tata Steel, model H-Beams. The advantages are: H-Beams have excellent bending resistance, can provide high-strength support, and are suitable for elevated structures and horizontal structures. At the same time, the H-Beams material has excellent corrosion resistance, suitable for harsh environments, and ensures long-term reliability and durability. In addition, the high strength of H-Beams enables it to resist bending and other forces, and can withstand high stress better than I-beams, providing a more stable connection (Tuolian).
[0035] The utility model realizes the disassembly and assembly of the foundation pit retaining structure and the concrete waist beam through the mutual cooperation between the structures, so that it does not need to use concrete pouring and can be reused. Specifically, the utility model designs an ingenious connection device, by setting interlocking connection parts between the foundation pit retaining structure and the concrete waist beam, so that the two can be firmly connected together without using traditional concrete pouring methods. This design not only greatly simplifies the construction process and reduces the demand for construction materials, but also effectively reduces construction costs and time. In addition, since concrete pouring is not required, tedious demolition work is no longer required during disassembly. The foundation pit retaining structure can be separated from the concrete waist beam with simple operations, which is convenient for repeated use, achieving efficient resource utilization and environmental protection goals.
[0036] The utility model realizes the function of quick disassembly and assembly by installing a fixing block, a fixing hole, a detachable limiting rod and a limiting hole. Specifically, the design of the fixing block and the limiting hole makes the connecting device highly flexible and convenient. During the installation process, it is only necessary to insert the fixing block into the fixing hole, and then insert the detachable limiting rod from the limiting hole and pass through the fixing block. A quick and stable connection can be achieved without the need for additional fixing measures, which greatly improves the construction efficiency. When disassembly is required, only simple tools are needed to dismantle the structure, and the entire disassembly and assembly process is fast and convenient. Such a design not only reduces the complexity of manual operation and improves work efficiency, but also reduces the risk of errors during the construction process, ensures that the connection between the foundation pit retaining structure and the concrete waist beam is stable and reliable, and also makes the disassembly and assembly process safer and more efficient.
[0037] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. The technicians in this industry should understand that the utility model is not limited by the above embodiments. The above embodiments and the description are only to illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model will have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A quick-release connection device for a foundation pit retaining structure and a concrete waist beam, which is divided into a connection area and an installation area, wherein the connection area includes a foundation pit connection base (1), and is characterized in that: The foundation pit connection base (1) is provided with peripheral screw holes (3) around it, a waist beam connection opening (4) is provided above the foundation pit connection base (1), a fixing hole (5) is provided in front of the waist beam connection opening (4), and a limiting hole (6) is provided on the left side of the waist beam connection opening (4); The connection area comprises a fixed block (2) and a detachable limiting rod (7), and is characterized in that three detachable limiting rods (7) are installed in front of the fixed block (2), and the detachable limiting rods (7) penetrate the fixed block (2).
2. The quick-release connection device for a foundation pit retaining structure and a concrete waist beam according to claim 1, characterized in that: The foundation pit connection base (1) adopts a truncated cone design.
3. The quick-release connection device for a foundation pit retaining structure and a concrete waist beam according to claim 1, characterized in that: A fixing screw hole (8) is installed in the middle of the waist beam connection port (4).
4. The quick-release connection device for a foundation pit retaining structure and a concrete waist beam according to claim 1, characterized in that: The fixing holes (5) and the limiting holes (6) are distributed in a cross shape.
5. The quick-release connection device for a foundation pit retaining structure and a concrete waist beam according to claim 1, characterized in that: The fixing hole (5) passes through the waist beam connecting opening (4).
6. The quick-release connection device for a foundation pit retaining structure and a concrete waist beam according to claim 1, characterized in that: The limiting hole (6) passes through the waist beam connecting opening (4).
Citation Information
Patent Citations
Underground continuous wall and waist beam connecting structure in foundation pit
CN217629972U