Prefabricated superposed shear wall straight thread sleeve vertical connection structure
By using a straight threaded sleeve to connect vertical steel bars in the overlapping shear wall of prefabricated buildings, the problems of inflexible structural design and poor force transmission in the prior art are solved, and higher degree of fusion and structural stability are achieved.
Patent Information
- Application Number
- CN202421693928.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-07-17
AI Technical Summary
The existing research on prefabricated building technology has a locking system, with low degree of integration, limited structural form and lack of flexibility in design. At the same time, the overlapping method of vertical steel bars in the shear wall is not convenient for force transmission, and the force in the upper shear wall cannot be effectively transmitted to the lower layer, and the steel bars cannot be accurately positioned on site.
The vertical connection structure of the straight thread sleeve of the prefabricated shear wall is adopted. By setting up a solid sealing area and connection holes at the bottom of the original superimposed shear wall member, vertical grooves are opened on both sides of the bottom of the connecting holes, and vertical steel bars are connected by a straight thread sleeve, which solves the force transmission problem and reduces the on-site reinforcement project volume.
Effectively transmit the force in the upper shear wall to the lower layer, improving the degree of fusion and design flexibility, reducing the difficulty of positioning on-site steel bars, and achieving structural stability and easy installation.
Smart Images

Figure CN222835233U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of structural assembly design, in particular to a prefabricated composite shear wall straight thread sleeve vertical connection structure. Background Art
[0002] The Outline of the 13th Five-Year Plan of my country proposes that we must firmly establish and implement the new development concept of innovation, coordination, greenness, openness and sharing, among which green development has become the main theme of the implementation of the Outline. The construction industry is one of the three high-energy-consuming industries, generating more than 300 million tons of new construction waste each year; in addition, there is currently 30%-40% resource waste in China's construction industry, and nearly half of the world's steel and cement are consumed in the construction industry each year, while the average life span of Chinese buildings is only 25 to 30 years. With the influence of environmental protection, population, technology and other factors, the development of prefabricated buildings is unstoppable, including prefabricated composite shear walls.
[0003] However, it still has the following disadvantages in actual use:
[0004] The existing technical research on prefabricated buildings is still based on a closed system, which has the disadvantages of low integration, limited structural forms, and lack of design flexibility. At the same time, the existing vertical steel bar overlap method in the composite shear wall is not convenient for force transmission, and cannot effectively transfer the force in the upper shear wall to the lower layer, and the steel bars in the wall cannot be accurately positioned on site. Utility Model Content
[0005] The purpose of the utility model is to provide a prefabricated composite shear wall straight threaded sleeve vertical connection structure to solve the problem that the technical research of the existing prefabricated buildings mentioned in the above background technology is still a locking system, with the disadvantages of low integration, limited structural forms, and lack of design flexibility. At the same time, the vertical steel bar overlap method in the existing composite shear wall is not convenient for force transmission, and the force in the upper shear wall cannot be effectively transmitted to the lower layer, and the steel bars in the wall cannot be accurately positioned on site.
[0006] In order to solve the above technical problems, the utility model is achieved through the following technical solutions:
[0007] The utility model is a prefabricated composite shear wall straight thread sleeve vertical connection structure, comprising:
[0008] A connection component, the connection component comprising an upper shear wall, a lower shear wall, and a floor slab;
[0009] The upper shear wall is connected above the floor slab, and the lower shear wall is fixed below the floor slab.
[0010] Furthermore, an upper layer of steel bars is fixedly connected inside the upper layer of shear wall, and a lower layer of steel bars is fixedly connected inside the lower layer of shear wall.
[0011] Furthermore, the lower layer of steel bars penetrates the top of the floor slab and extends to the interior of the upper layer of shear walls.
[0012] Furthermore, a connection hole is opened inside the upper shear wall, and the connection hole is a T-shaped hole.
[0013] Furthermore, a sleeve is threadedly connected to the top of the lower steel bar, and the top of the sleeve is rotatably connected to the upper steel bar.
[0014] Furthermore, vertical grooves are provided on both sides of the bottom of the connecting hole, and the sleeve is placed inside the vertical grooves;
[0015] A cast-in-place area is provided inside the floor slab.
[0016] Compared with the prior art, the advantages of the present invention are:
[0017] 1. The utility model optimizes the vertical reinforcement connection mode from indirect overlap to mechanical connection, sets a solid blocking area at the bottom of the original composite shear wall component, opens a connection hole in this area, and opens vertical grooves on both sides of the bottom of the connection hole. The solid blocking method can be used as a component template. The connection hole ensures that the concrete can be poured downwards densely. The reinforcement inside the vertical groove is connected with a straight threaded sleeve, which solves the force transmission problem of indirect overlap of the vertical reinforcement, so that the internal force of the upper shear wall can be effectively transmitted to the lower layer. At the same time, the amount of on-site reinforcement insertion engineering is reduced, and the problem of too dense spacing of the reinforcement inside the cavity is solved. There is no need to accurately position the reinforcement on site, which solves the problem of inaccurate reinforcement positioning. The force mechanism is clear, easy to install, and stable performance, thereby improving the integration degree, opening up structural forms, and improving design flexibility.
[0018] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 It is a schematic diagram of the cross-sectional structure of the connection structure of the utility model.
[0021] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0022] 11. Upper shear wall; 12. Lower shear wall; 13. Floor slab; 14. Lower steel bars; 15. Upper steel bars; 16. Sleeve; 17. Connection hole; 171. Vertical groove; 18. Cast-in-place area. DETAILED DESCRIPTION
[0023] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.
[0024] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific implementation methods disclosed below.
[0025] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.
[0026] See also Figure 1 As shown, this embodiment is a prefabricated composite shear wall straight thread sleeve vertical connection structure, comprising:
[0027] A connection component, the connection component includes an upper shear wall 11, a lower shear wall 12, and a floor slab 13;
[0028] The upper shear wall 11 is connected above the floor slab 13, and the lower shear wall 12 is fixed below the floor slab 13;
[0029] The upper shear wall 11, the lower shear wall 12 and the floor slab 13 together form a stable building wall;
[0030] An upper layer of steel bars 15 are fixedly connected inside the upper layer of shear wall 11, and a lower layer of steel bars 14 are fixedly connected inside the lower layer of shear wall 12;
[0031] The upper steel bars 15 can stabilize the connection between the upper shear wall 11 and the floor slab 13, and the lower steel bars 14 can stabilize the connection between the upper shear wall 11, the floor slab 13 and the lower shear wall 12;
[0032] The lower steel bars 14 penetrate the top of the floor slab 13 and extend to the interior of the upper shear wall 11;
[0033] The lower layer of steel bars 14 extend into the upper layer of shear wall 11, so as to facilitate the connection between the upper layer of shear wall 11 and the lower layer of shear wall 12;
[0034] A connection hole 17 is provided inside the upper shear wall 11, and the connection hole 17 is a T-shaped hole;
[0035] The connection holes 17 are provided to facilitate the connection between the upper shear wall 11 and the lower shear wall 12. A solid blocking area is provided at a height of 150 mm at the bottom of the original composite shear wall component. Connection holes 17 are provided every 400 mm in this area. The connection holes 17 are T-shaped holes with a diameter of 80 mm. The T-shaped holes can ensure that concrete can be poured downward and poured densely.
[0036] The top of the lower steel bar 14 is threadedly connected with a sleeve 16, and the top of the sleeve 16 is rotatably connected to the upper steel bar 15;
[0037] The lower steel bars 14 and the upper steel bars 15 are both connected to the sleeve 16 by threaded rotation. The sleeve 16 has a straight thread inside, which is convenient for connecting the steel bars and the upper shear wall 11 and the lower shear wall 12.
[0038] Vertical grooves 171 are provided on both sides of the bottom of the connection hole 17, and the sleeve 16 is placed inside the vertical grooves 171;
[0039] A cast-in-place area 18 is provided inside the floor slab 13;
[0040] The vertical groove 171 is provided to facilitate the placement of the sleeve 16, and the cast-in-place area 18 is provided to facilitate casting, so that the connection between the upper shear wall 11, the lower shear wall 12 and the floor slab 13 is made, and the blank part in the wall is the cast-in-place part;
[0041] Working principle:
[0042] The floor slab 13 is connected to the lower shear wall 12. After the connection, the sleeve 16 is held by hand, and the bottom end of the sleeve 16 is sleeved on the top of the lower steel bar 14 inside the lower shear wall 12, and then the bottom end of the upper steel bar 15 inside the upper shear wall 11 is placed inside the sleeve 16. At this time, the sleeve 16 is located inside the vertical groove 171. Then, the sleeve 16 is rotated by hand so that the sleeve 16, the upper steel bar 15, and the lower steel bar 14 are rotated and connected together, so that the three are connected together. At the same time, the lower shear wall 12 is firmly connected to the floor slab 13, so that the upper shear wall 11 is firmly connected to the floor slab 13.
[0043] Then cement is injected into the cast-in-place area 18, so that the upper shear wall 11, the lower shear wall 12 and the floor slab 13 are fixedly connected, realizing an intuitive and reliable vertical steel bar connection method for the wall, and solving the force transmission problem of indirect overlap of vertical steel bars;
[0044] The above steps can improve your functionality.
[0045] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0046] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A prefabricated composite shear wall straight thread sleeve vertical connection structure, characterized in that: include: A connection assembly, the connection assembly comprising an upper shear wall (11), a lower shear wall (12), and a floor slab (13); The upper shear wall (11) is connected above the floor slab (13), and the lower shear wall (12) is fixed below the floor slab (13).
2. A prefabricated composite shear wall straight thread sleeve vertical connection structure according to claim 1, characterized in that: An upper layer of steel bars (15) is fixedly connected inside the upper layer of shear wall (11), and a lower layer of steel bars (14) is fixedly connected inside the lower layer of shear wall (12).
3. A prefabricated composite shear wall straight thread sleeve vertical connection structure according to claim 2, characterized in that: The lower layer of steel bars (14) penetrates the top of the floor slab (13) and extends to the inside of the upper layer of shear wall (11).
4. A prefabricated composite shear wall straight thread sleeve vertical connection structure according to claim 1, characterized in that: A connection hole (17) is provided inside the upper shear wall (11), and the connection hole (17) is a T-shaped hole.
5. The prefabricated composite shear wall straight thread sleeve vertical connection structure according to claim 2 is characterized in that: The top end of the lower steel bar (14) is threadedly connected with a sleeve (16), and the top end of the sleeve (16) is rotatably connected to the upper steel bar (15).
6. A prefabricated composite shear wall straight thread sleeve vertical connection structure according to claim 4, characterized in that: The bottom of the connecting hole (17) is provided with vertical grooves (171) on both sides, and the sleeve (16) is placed inside the vertical grooves (171); A cast-in-place area (18) is provided inside the floor slab (13).