Circulating water collecting ditch structure for construction site

By designing the circulating water collection ditch structure at the construction site, including a water purification pool, a sewage pool and a splicable ditch plate, the problem of untimely water supply in the construction site is solved, rapid assembly and water source filtration are achieved, and construction efficiency is improved.

CN222847502UActive Publication Date: 2025-05-09JIANGSU YONGLIAN JINGZHU CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420796579.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2025-05-09
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

In construction sites, it takes a long time to excavate and coat concrete water collection ditches, resulting in untimely supply of water sources and affecting construction efficiency.

Method used

Design a circulating water collection ditch structure at construction site, including a water purification pool, a sewage pool and splicable ditch plates, and achieve rapid assembly and water source filtration through assembly mechanisms and filtering mechanisms.

Benefits of technology

This structure can significantly save time in excavation and coating concrete, reduce labor costs, and ensure normal water supply of construction equipment through recycling and filtration functions and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222847502U_ABST
    Figure CN222847502U_ABST
Patent Text Reader

Abstract

The utility model provides a construction site circulating water collecting ditch structure which comprises a water purifying pond, a water inlet groove is formed in the right side of an inner cavity of the water purifying pond, a sewage pond is arranged on the right side of the water purifying pond, a water outlet groove is formed in the left side of an inner cavity of the sewage pond, and first ditch plates are fixedly installed on the inner side of the sewage pond and the inner side of the water purifying pond. Water inlet grooves are formed in the inner sides of the first ditch plates, and assembling mechanisms are arranged on the outer sides of the first ditch plates and the outer sides of the second ditch plates. By arranging the assembling mechanism, ditch plates can be conveniently assembled and spliced, compared with traditional ditch digging for water collection, time for ditch digging and concrete coating can be saved to a large extent, more labor cost is saved, and meanwhile the situation that due to the fact that the time for ditch digging and concrete solidification waiting is too long, the ditch digging time and the concrete solidification waiting time are too long, the ditch digging time and the concrete solidification waiting time are shortened is avoided. And water cannot be normally supplied to equipment used in the construction site, so that the normal construction efficiency of the construction site is influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a water collecting ditch, in particular to a circulating water collecting ditch structure for a construction site, belonging to the technical field of construction sites. Background Art

[0002] A construction site, also known as a construction site or construction site in Cantonese, is a place where a construction project is being developed and civil engineering is being carried out. It is often enclosed by fences, wire mesh or walls to restrict the entry and exit of personnel, materials, machinery and vehicles. Before construction workers enter the construction site, they must receive education and assessment on construction safety and fire protection knowledge;

[0003] Many equipments in construction sites need water when working. In order to ensure the water supply, it is often necessary to dig drainage ditches at the construction site. At the same time, in order to ensure that the water source does not penetrate into the soil through the drainage ditches, it is also necessary to coat the inner cavity of the drainage ditches with concrete. Digging the drainage ditches and waiting for the concrete to solidify both take a lot of time. When the drainage ditch is not convenient for rapid water storage, it will greatly affect the normal construction of the construction site. Therefore, a circulating water drainage ditch structure for construction sites is proposed. Utility Model Content

[0004] In view of this, the utility model provides a circulating water collection ditch structure for a construction site to solve or alleviate the technical problems existing in the prior art and at least provide a beneficial choice.

[0005] The technical solution of the utility model is achieved as follows: a circulating water collection ditch structure for a construction site includes a clean water tank, a water inlet trough is provided on the right side of the inner cavity of the clean water tank, a sewage tank is provided on the right side of the clean water tank, a water outlet trough is provided on the left side of the inner cavity of the sewage tank, first ditch plates are fixedly installed on the inner sides of the sewage tank and the clean water tank, a water inlet trough is provided on the inner side of the first ditch plates, and assembly mechanisms are provided on the outer sides of the first ditch plates and the second ditch plates.

[0006] Further preferably, the assembly mechanism includes splicing blocks, which are fixedly mounted on the inner sides of the front and rear sides of the first gutter plate and the left and right sides of the front and rear sides of the second gutter plate, a mounting plate is provided on the outer side of the splicing block, and clamping blocks are fixedly mounted on the upper and lower sides of the inner side of the mounting plate, a clamping groove is provided on the inner side of the clamping block, and the splicing block is clamped in the inner cavity of the clamping groove.

[0007] Further preferably, a fixing plate is fixedly installed on the outer side of the clamping groove, and fixing bolts are threadedly connected to the left and right sides of the top of the fixing plate, and screw grooves are provided on the inner sides of the front and rear sides of the first gutter plate and the outer side of the second gutter plate, and the inner side of the fixing bolts is threadedly connected to the inner cavity of the screw groove.

[0008] Further preferably, the inner cavities of the first gutter plate and the second gutter plate are both provided with a filtering mechanism, the filtering mechanism comprising a first screen, a second screen and a third screen, the first screen, the second screen and the third screen are all arranged in the inner cavity of the second gutter plate, the surface of the first screen is provided with first sieve holes, the surface of the second screen is provided with second sieve holes, and the surface of the third screen is provided with third sieve holes.

[0009] Further preferably, the size of the inner cavity of the third sieve hole is larger than the size of the inner cavity of the second sieve hole, and the size of the inner cavity of the second sieve hole is larger than the size of the inner cavity of the first sieve hole.

[0010] Further preferably, slots are provided on the left side and front and rear sides of the bottom of the inner cavity of the second gutter plate, and the first screen, the second screen and the third screen are all inserted into the inner cavity of the slots.

[0011] Further preferably, filter nets are fixedly installed on the front and rear sides of the right side of the inner cavity of the water purification pool and the front and rear sides of the left side of the inner cavity of the sewage pool, and a card block is inserted in the inner cavity of the filter net.

[0012] The embodiment of the utility model has the following advantages due to the adoption of the above technical solution:

[0013] 1. The utility model can facilitate the assembly and splicing of ditch plates by setting an assembly mechanism. Compared with the traditional method of digging ditches for water collection, it can save the time of digging ditches and applying concrete to a large extent, save a lot of labor costs, and at the same time avoid the inability to supply water to the equipment used in the construction site normally due to the long time of digging ditches and waiting for concrete to solidify, which will affect the normal construction efficiency of the construction site.

[0014] Second, the utility model can splice the first gutter plate and the second gutter plate with each other by arranging the splicing block, the clamping block and the clamping groove. At the same time, the number of the first gutter plates can be increased or reduced according to the actual situation required at the construction site, thereby improving the overall working efficiency of the equipment. By arranging the fixing bolts and the screw grooves, the first gutter plate and the second gutter plate can be fixed to and disassembled with each other. The installation and disassembly structure is relatively simple, which is convenient for daily maintenance in the later stage. By arranging the filtering mechanism, the flowing water can be filtered, and the sewage can be filtered into clean water, which is convenient for the normal use of the construction equipment, has the effect of recycling, and avoids the waste of water resources. The second sieve hole and the third sieve hole have different diameters of their inner cavities. When debris falls into the ditch, they can be screened in sections to avoid the debris being accumulated in one place, which causes the water source to not flow normally. By setting the slots, the first sieve, the second sieve and the third sieve can be easily disassembled and replaced to avoid damage to the first sieve, the second sieve and the third sieve after long-term use, which makes it impossible to screen the debris normally and affects the use of the water source. By setting the card block and the filter net, the water source can be filtered and purified. At the same time, the card block can be easily cleaned and replaced to avoid excessive accumulation of pollutants on its surface after long-term work, which makes it impossible to filter the water source normally.

[0015] The above summary is for the purpose of description only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the utility model will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 This is the main structure diagram of the utility model;

[0018] Figure 2 This is a rear structural diagram of the main body of the utility model;

[0019] Figure 3 This is a structural diagram of the filtering mechanism of the utility model;

[0020] Figure 4 This is a structural diagram of the assembly mechanism of the utility model;

[0021] Figure 5 For the utility model Figure 4 A is an enlarged structural diagram.

[0022] Figure numerals: 1. water purification tank; 2. assembly mechanism; 201. splicing block; 202. mounting plate; 203. snap-in block; 204. snap-in groove; 205. fixing plate; 206. fixing bolt; 207. screw groove; 3. filtering mechanism; 301. first screen; 302. second screen; 303. third screen; 304. first screen hole; 305. second screen hole; 306. third screen hole; 307. slot; 308. snap block; 309. filter; 4. sewage tank; 5. first ditch plate; 6. second ditch plate; 7. water inlet trough; 8. water outlet trough. DETAILED DESCRIPTION

[0023] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0024] The embodiments of the present utility model are described in detail below with reference to the accompanying drawings.

[0025] Example 1

[0026] like Figure 1-5 As shown, an embodiment of the utility model provides a circulating water collection ditch structure for a construction site, including a clean water tank 1, a water inlet trough 7 is provided on the right side of the inner cavity of the clean water tank 1, a sewage tank 4 is provided on the right side of the clean water tank 1, a water outlet trough 8 is provided on the left side of the inner cavity of the sewage tank 4, a first ditch plate 5 is fixedly installed on the inner side of the sewage tank 4 and the clean water tank 1, a water inlet trough 7 is provided on the inner side of the first ditch plate 5, and an assembly mechanism 2 is provided on the outer side of the first ditch plate 5 and the second ditch plate 6.

[0027] By setting up the assembly mechanism 2, the ditch plates can be easily assembled and spliced. Compared with the traditional method of digging ditches for water collection, the time for digging ditches and laying concrete can be saved to a large extent, and a lot of labor costs can be saved. At the same time, it is avoided that the time for digging ditches and waiting for concrete to solidify is too long, and the normal water supply to the equipment used in the construction site cannot be provided, which will affect the normal construction efficiency of the construction site.

[0028] Example 2

[0029] In one embodiment, the assembly mechanism 2 includes a splicing block 201, which is fixedly installed on the inner sides of the front and rear sides of the first gutter plate 5 and the left and right sides of the front and rear sides of the second gutter plate 6. A mounting plate 202 is provided on the outer side of the splicing block 201, and a clamping block 203 is fixedly installed on the upper and lower sides of the inner side of the mounting plate 202. A clamping groove 204 is provided on the inner side of the clamping block 203. The splicing block 201 is clamped in the inner cavity of the clamping groove 204. A fixing plate 205 is fixedly installed on the outer side of the clamping groove 204. The left and right sides of the top of the fixing plate 205 are threadedly connected with fixing bolts 206. Screw grooves 207 are provided on the inner sides of the front and rear sides of the first gutter plate 5 and the outer side of the second gutter plate 6. The inner side of the fixing bolt 206 is threadedly connected to the inner cavity of the screw groove 207.

[0030] By setting the splicing block 201, the clamping block 203 and the clamping groove 204, the first gutter plate 5 and the second gutter plate 6 can be spliced ​​together. At the same time, the number of the first gutter plates 5 can be increased or decreased according to the actual situation required at the construction site, thereby improving the overall working efficiency of the equipment. By setting the fixing bolts 206 and the screw grooves 207, the first gutter plate 5 and the second gutter plate 6 can be fixed to and disassembled. The installation and disassembly structure is relatively simple, which is convenient for subsequent daily maintenance.

[0031] Example 3

[0032] In one embodiment, the inner cavities of the first ditch plate 5 and the second ditch plate 6 are both provided with a filtering mechanism 3, the filtering mechanism 3 comprising a first screen 301, a second screen 302 and a third screen 303, the first screen 301, the second screen 302 and the third screen 303 are all arranged in the inner cavity of the second ditch plate 6, the surface of the first screen 301 is provided with a first sieve hole 304, the surface of the second screen 302 is provided with a second sieve hole 305, the surface of the third screen 303 is provided with a third sieve hole 306, and the third sieve hole The size of the inner cavity of 306 is larger than that of the inner cavity of the second sieve hole 305, and the size of the inner cavity of the second sieve hole 305 is larger than that of the inner cavity of the first sieve hole 304. Slots 307 are provided on the left side and front and rear sides of the bottom of the inner cavity of the second ditch plate 6. The first sieve 301, the second sieve 302 and the third sieve 303 are all inserted into the inner cavity of the slots 307. Filters 309 are fixedly installed on the front and rear sides of the right side of the inner cavity of the clean water tank 1 and the front and rear sides of the left side of the inner cavity of the sewage tank 4, and a block 308 is inserted into the inner cavity of the filter 309.

[0033] By setting the filtering mechanism 3, the flowing water can be filtered, and the sewage can be filtered into clean water, which is convenient for the normal use of the construction equipment, has the effect of recycling, and avoids the waste of water resources. By setting the first sieve hole 304, the second sieve hole 305 and the third sieve hole 306, due to the different diameters of their inner cavities, when there are debris falling in the ditch, they can be screened in sections to avoid the debris being uniformly accumulated in one place, resulting in the problem that the water source cannot flow normally. By setting the slot 307, the first screen 301, the second screen 302 and the third screen 303 can be easily disassembled and replaced to avoid the first screen 301, the second screen 302 and the third screen 303 being damaged after long-term use, resulting in the inability to screen the debris normally and affecting the use of the water source. By setting the block 308 and the filter 309, the water source can be filtered and purified, and the block 308 can be easily cleaned and replaced to avoid excessive pollutants accumulating on its surface after long-term work, which can then fail to filter the water source normally.

[0034] When the utility model is in operation: the clean water pool 1 and the sewage pool 4 are installed according to the actual needs of the installation site, and then the required number of second gutter plates 6 are placed on the inner side of the first gutter plate 5. At this time, after the splicing blocks 201 are fitted together, the mounting plate 202 is grasped and moved to the left side, so that the splicing block 201 is inserted into the inner cavity of the clamping groove 204, and then the fixing bolt 206 is screwed to make it threadedly connected to the inner cavity of the screw groove 207, completing the connection between the first gutter plate 5 and the second gutter plate 6. Subsequently, the sewage after use of the machine equipment is introduced into the inner cavity of the sewage pool 4, and the water flows to the left. At this time, the water outlet trough 8 in the inner cavity of the sewage pool 4 filters the water flow. Then, when the water flows into the inner cavity of the clean water pool 1, it can be filtered again through the water outlet trough 8 in the inner cavity of the clean water pool 1. When debris enters the water source, the first screen 301, the second screen 302 and the third screen 303 cooperate with each other to screen the debris of different volumes in sections, which is convenient for personnel to clean the ditch.

[0035] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.

Claims

1. A circulating water collection ditch structure for a construction site, characterized by: The invention comprises a clean water tank (1), wherein a water inlet groove (7) is provided on the right side of the inner cavity of the clean water tank (1), a sewage tank (4) is provided on the right side of the clean water tank (1), a water outlet groove (8) is provided on the left side of the inner cavity of the sewage tank (4), first water ditch plates (5) are fixedly installed on the inner sides of the sewage tank (4) and the clean water tank (1), the inner side of the first water ditch plates (5) are provided with water inlet grooves (7), and the outer sides of the first water ditch plates (5) and the second water ditch plates (6) are provided with assembly mechanisms (2).

2. A construction site circulating water collection ditch structure according to claim 1, characterized in that: The assembly mechanism (2) comprises a splicing block (201), wherein the splicing blocks (201) are fixedly mounted on the inner sides of the front and rear sides of the first gutter plate (5) and the left and right sides of the front and rear sides of the second gutter plate (6); a mounting plate (202) is arranged on the outer side of the splicing block (201); a clamping block (203) is fixedly mounted on the upper and lower sides of the inner side of the mounting plate (202); a clamping groove (204) is provided on the inner side of the clamping block (203); and the splicing block (201) is clamped in the inner cavity of the clamping groove (204).

3. A construction site circulating water collection ditch structure according to claim 2, characterized in that: A fixing plate (205) is fixedly mounted on the outer side of the clamping groove (204), and fixing bolts (206) are connected to the top of the fixing plate (205) on both left and right sides via threads. Screw grooves (207) are provided on the inner sides of the front and rear sides of the first water ditch plate (5) and the outer side of the second water ditch plate (6), and the inner sides of the fixing bolts (206) are threadedly connected to the inner cavities of the screw grooves (207).

4. A construction site circulating water collection ditch structure according to claim 1, characterized in that: The inner cavities of the first gutter plate (5) and the second gutter plate (6) are both provided with a filtering mechanism (3), the filtering mechanism (3) comprising a first screen (301), a second screen (302) and a third screen (303), the first screen (301), the second screen (302) and the third screen (303) are all arranged in the inner cavity of the second gutter plate (6), the surface of the first screen (301) is provided with a first screen hole (304), the surface of the second screen (302) is provided with a second screen hole (305), and the surface of the third screen (303) is provided with a third screen hole (306).

5. A construction site circulating water collection ditch structure according to claim 4, characterized in that: The size of the inner cavity of the third sieve hole (306) is greater than the size of the inner cavity of the second sieve hole (305), and the size of the inner cavity of the second sieve hole (305) is greater than the size of the inner cavity of the first sieve hole (304).

6. A construction site circulating water collection ditch structure according to claim 4, characterized in that: Slots (307) are provided on the left side and the front and rear sides of the bottom of the inner cavity of the second gutter plate (6), and the first screen (301), the second screen (302) and the third screen (303) are all inserted into the inner cavity of the slots (307).

7. A construction site circulating water collection ditch structure according to claim 4, characterized in that: Filters (309) are fixedly installed on the front and rear sides of the right side of the inner cavity of the clean water tank (1) and the front and rear sides of the left side of the inner cavity of the sewage tank (4), and a clamping block (308) is inserted into the inner cavity of the filter (309).