Concrete column vertical steel bar spacing fixing device

By designing a vertical steel bar spacing fixing device for concrete columns including screws, mountain-shaped cards and mountain-shaped nuts, the problem of bias and spacing changes in the steel bars during installation and pouring is solved, and the stable fixation of steel bars is achieved, and the safety and quality control of concrete structures are improved.

CN222847672UActive Publication Date: 2025-05-09JIANGSU HUWU CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421636062.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2025-05-09
Estimated Expiration
2034-07-11

AI Technical Summary

Technical Problem

In construction projects, the vertical steel bars of concrete columns are prone to bias, spacing changes and external displacement during installation and pouring, resulting in the safety of the concrete structure being affected.

Method used

A concrete column vertical steel bar spacing fixing device is designed, including a horizontally arranged screw, a mountain-shaped card and a mountain-shaped nut sleeved on the outer periphery of the screw. The arc-shaped concave surface of the mountain-shaped card comes into contact with the outer periphery of the steel bar, and magnets are embedded in the grooves. The steel bars are fixed by the adsorption of the magnets and tightened and fixed by the mountain-shaped nut.

Benefits of technology

This device can effectively prevent the steel bar from being offset during concrete pouring, improve the quality and safety of steel bar installation, reduce labor costs, and has the advantages of easy disassembly, simple production and repeated use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222847672U_ABST
    Figure CN222847672U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete column vertical steel bar spacing fixing device which comprises a horizontally-arranged screw rod, a plurality of sets of fixing assemblies are arranged in the length direction of the screw rod in a sleeved mode at intervals, the multiple sets of fixing assemblies are arranged in the same direction, and the fixing assemblies slide left and right on the screw rod and are detachably connected with the screw rod. The fixing assembly comprises an E-shaped clamp and an E-shaped nut which are arranged on the periphery of the screw in a sleeving mode, an arc-shaped concave face is arranged on one side of the E-shaped clamp, the other side of the E-shaped clamp is arranged to be a plane, the concave face of the E-shaped clamp abuts against and makes contact with the periphery of the vertically-arranged reinforcing steel bar, the E-shaped nut is located on one side of the plane of the E-shaped clamp, and the E-shaped clamp is screwed and fixed through the E-shaped nut. An embedding groove is formed in the concave face of the E-shaped clamp, and a magnet is embedded in the embedding groove. When the spacing fixing device is used, the spacing fixing effect on the reinforcing steel bars is achieved on the building construction site, the corresponding sets of fixing assemblies can be freely configured according to the number of the reinforcing steel bars, any binding operation is not needed, the installation difficulty is reduced, and meanwhile the spacing fixing device has the advantages of being convenient to disassemble, easy to manufacture and capable of being repeatedly used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering construction, in particular to a device for fixing the vertical reinforcement spacing of a concrete column. Background Art

[0002] During the installation of steel bars and the pouring of concrete in the concrete columns of construction projects, it is easy for the steel bars of vertical columns, especially those of large-diameter columns, to be displaced, the spacing between steel bars to change, and the steel bars to move outwards. This is a difficult point in the quality control of steel bar installation. If there are serious quality problems such as steel bar displacement and spacing change, it will affect the safety of the concrete structure of the construction project.

[0003] Currently, the spacing and deviation are mainly controlled by wire binding, but the control effect is not good. Although remedial measures can be taken after pouring, it increases the labor cost. Therefore, quality control before pouring is particularly important. During the installation of steel bars, the spacing between steel bars should be fixed to prevent the deviation of steel bars, which can effectively ensure the quality of the project.

[0004] Therefore, it is necessary to provide a device for fixing the spacing of vertical steel bars in a concrete column to solve the above-mentioned technical problems. Utility Model Content

[0005] The utility model aims to provide a device for fixing the spacing of vertical steel bars in a concrete column in view of the deficiencies in the prior art. The device is easy to operate and can keep the steel bars in a fixed position without deviation during the concrete pouring process.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A device for fixing the spacing of vertical steel bars in a concrete column comprises a horizontally arranged screw rod, a plurality of sets of fixing assemblies are sleeved at intervals in the length direction of the screw rod, the plurality of fixing assemblies are arranged in the same direction, the fixing assemblies slide left and right on the screw rod and are detachably connected to the screw rod, the fixing assembly comprises a mountain-shaped clip and a mountain-shaped nut sleeved on the outer periphery of the screw rod, one side of the mountain-shaped clip is provided with an arc-shaped concave surface, and the other side is provided with a plane, the concave surface of the mountain-shaped clip is in contact with the outer periphery of the vertically arranged steel bars, the mountain-shaped nut is located on one side of the plane of the mountain-shaped clip, the mountain-shaped clip is tightened and fixed by the mountain-shaped nut, the concave surface of the mountain-shaped clip is provided with an embedding groove, and a magnet is embedded in the embedding groove.

[0008] Preferably, a gasket is provided between the mountain-shaped nuts.

[0009] Preferably, two concave surfaces are symmetrically provided on one side of the mountain-shaped card, and magnets are embedded in the two concave surfaces.

[0010] Compared with the prior art, the utility model has the following advantages:

[0011] The utility model forms a fixing device through a screw, a mountain-shaped clamp and a mountain-shaped nut, which plays a role in fixing the steel bars at the construction site. The corresponding number of fixing components can be freely configured according to the number of steel bars and the design drawings. The concave surface of the mountain-shaped clamp is used to limit the displacement of the steel bars. At the same time, the magnet embedded in the concave surface can not only further improve the fixing effect of the steel bars, but also play the role of adsorbing and fixing the entire fixing device on the steel bars. No binding operation is required, which saves a lot of operation time and reduces the difficulty of installation. At the same time, the utility model can prevent the vertical column steel bars from deviating outward, causing the steel bar protective layer of the reinforced concrete column to fail to meet the standards. The utility model also has the advantages of easy disassembly, simple production and repeated use. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model;

[0013] Figure 2 It is a schematic diagram of the structure of the mountain-shaped card;

[0014] Figure 3 It is the installation diagram of the utility model;

[0015] Figure 4 yes Figure 3 A top view of

[0016] Among them, 1-screw, 2-mountain card, 3-mountain nut, 4-steel bar, 5-washer, 6-magnet, 7-protective sleeve DETAILED DESCRIPTION

[0017] The present invention is further explained below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that these implementation methods are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0018] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixed connection" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0019] In the present invention, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention. They do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.

[0020] like Figures 1 to 4 As shown, a device for fixing the spacing of vertical steel bars in a concrete column comprises a horizontally arranged screw rod 1, five sets of fixing components are sleeved at intervals in the length direction of the screw rod, the five sets of fixing components are arranged in the same direction, the fixing components slide left and right on the screw rod and are detachably connected to the screw rod, the fixing components comprise a mountain-shaped clip 2 and a mountain-shaped nut 3 sleeved on the outer periphery of the screw rod, one side of the mountain-shaped clip is provided with two symmetrical arc-shaped concave surfaces, and the other side is provided with a plane, the concave surface of the mountain-shaped clip is in contact with the outer periphery of the vertically arranged steel bars 4, the mountain-shaped nut is located on one side of the plane of the mountain-shaped clip, the mountain-shaped clip is tightened and fixed by the mountain-shaped nut, a gasket 5 is installed between the mountain-shaped nuts and the mountain-shaped nuts, the two concave surfaces of the mountain-shaped clip are provided with embedding grooves, and magnets 6 are embedded in the embedding grooves.

[0021] The principle and use of a device for fixing the spacing of vertical steel bars in a concrete column: before pouring the concrete column, first sleeve a protective sleeve 7 on the outside of the vertical steel bars of the concrete column, and then install a spacing fixing device on the protective sleeve. Each set of fixing components corresponds to one steel bar. The mountain-shaped card is placed on the screw rod and rotated left and right to make the arc-shaped concave surface of the mountain-shaped card contact the outer periphery of the steel bar. The magnet embedded in the concave surface has an adsorption effect on the steel bar, and the mountain-shaped card and the steel bar are adsorbed and fixed. After the position of the mountain-shaped card is fixed, tighten the mountain-shaped nut corresponding to the mountain-shaped card, and tighten the mountain-shaped card through the mountain-shaped nut, so that the steel bar will not be displaced during the pouring process. After the pouring is completed, loosen each mountain-shaped nut, dismantle the entire spacing fixing device, and remove the protective sleeves of each steel bar.

[0022] The above description shows and describes the preferred embodiments of the utility model. As mentioned above, it should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the utility model concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not depart from the spirit and scope of the utility model, and should be within the scope of protection of the claims attached to the utility model.

Claims

1. A device for fixing the spacing of vertical steel bars in a concrete column, characterized in that: The invention comprises a screw rod (1) arranged horizontally, a plurality of fixing components are sleeved at intervals in the length direction of the screw rod, the plurality of fixing components are arranged in the same direction, the fixing components slide left and right on the screw rod and are detachably connected to the screw rod, the fixing components comprise a mountain-shaped clip (2) and a mountain-shaped nut (3) sleeved on the outer periphery of the screw rod, the mountain-shaped clip has an arc-shaped concave surface on one side and a plane on the other side, the concave surface of the mountain-shaped clip abuts against the outer periphery of a vertically arranged steel bar (4), the mountain-shaped nut is located on one side of the plane of the mountain-shaped clip, the mountain-shaped clip is tightened and fixed by the mountain-shaped nut, the concave surface of the mountain-shaped clip is provided with an embedding groove, and a magnet (6) is embedded in the embedding groove.

2. A device for fixing the spacing of vertical reinforcement bars of a concrete column according to claim 1, characterized in that: A gasket (5) is provided between the mountain-shaped nuts.

3. A device for fixing the spacing of vertical reinforcement bars of a concrete column according to claim 1, characterized in that: One side of the mountain-shaped card is symmetrically provided with two concave surfaces, and magnets are embedded in the two concave surfaces.