Rapid maintenance device for leakage of building drainage PE pipe

By designing a rapid leakage maintenance device for building drainage PE pipes and using a combined structure of connectors and straight pipes, the problems of low maintenance efficiency and low sustainable utilization in the prior art are solved, and rapid and simple multiple repairs are achieved, which improves the service life of the pipes.

CN222880671UActive Publication Date: 2025-05-16中建五局安装工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421848613.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-05-16
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

When repairing PE pipe leakage, the prior art requires hot melting or electromelting with special equipment, resulting in a long maintenance time and the pipeline will shorten after each cutting. After multiple repairs, the length of the pipeline is not enough to meet the engineering needs, and there is a problem of low maintenance efficiency and low sustainable utilization.

Method used

A rapid maintenance device for leakage of PE pipes in building drainage is designed, including two connectors, sealing ring grooves, sealing rings, first straight pipes and second straight pipes. By installing the cross section of the PE pipe in the sealing ring groove of the connecting head and installing it on the first straight pipe with a sliding sleeve using the second straight pipe, the overlap length is adjusted to make up for the cut PE pipe length, so that the total length of the pipe is equal to the original length.

Benefits of technology

It realizes rapid maintenance of PE pipes, does not require special equipment, simplifies the maintenance process, improves maintenance efficiency, and can be repaired multiple times, increasing the sustainable utilization of the pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222880671U_ABST
    Figure CN222880671U_ABST
Patent Text Reader

Abstract

The utility model provides a building drainage PE pipe leakage rapid maintenance device which comprises two connectors, sealing ring grooves are formed in the connectors, PE pipes are inserted into the sealing ring grooves, sealing rings are embedded in the sealing ring grooves, one end, away from the sealing ring grooves, of one connector is fixedly connected with a first straight pipe, and the other end, away from the sealing ring grooves, of the other connector is fixedly connected with a second straight pipe. One end, far away from the sealing ring groove, of the other connector is fixedly connected with a second straight pipe, the second straight pipe is slidably arranged on the peripheral surface of the first straight pipe in a sleeving mode, and the beneficial effects of improving the maintenance efficiency and increasing the sustainable utilization rate are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water supply and drainage pipe leakage prevention, in particular to a rapid maintenance and anti-seepage device for building drainage PE pipe leakage. Background Art

[0002] At present, PE pipe is a polyethylene plastic pipe product. PE pipe is usually used in pipeline laying operations such as water supply pipes, sewage pipes and communication power pipelines. In the laying operation of PE pipes, PE pipes are first mass-produced according to general specifications, and then multiple sections of PE pipes are connected end to end in sequence according to construction requirements. In actual application, due to construction reasons and the overall water pressure and force problems of the pipeline, leakage is prone to occur at the connection position of the connector, and the connector needs to be repaired. In related technologies, the leaking part of the connector is cut off, and then the remaining two sections are reconnected by hot melting or electric melting.

[0003] With regard to the above-mentioned related technologies, each time after the leaking part is cut off, it is necessary to use special equipment for hot melting or electric melting, which leads to a long maintenance time. In addition, after each cutting, the original pipeline will become shorter. After multiple repairs, the pipeline length is not enough to meet the project requirements. Therefore, there are problems of low maintenance efficiency and low sustainable utilization rate.

[0004] In view of this, it is indeed necessary to provide a technical solution for the above-mentioned problem of a quick repair device for leakage of building drainage PE pipes. Utility Model Content

[0005] The utility model aims to provide a rapid repair device for leakage of a building drainage PE pipe to solve the problem.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions for the rapid repair device of PE pipe leakage of building drainage:

[0007] A quick repair device for leakage of a building drainage PE pipe comprises two connectors, each of which is provided with a sealing ring groove for inserting a PE pipe, and a sealing ring is embedded in the sealing ring groove. One end of one of the connectors away from the sealing ring groove is fixedly connected to a first straight pipe, and the other end of the connector away from the sealing ring groove is fixedly connected to a second straight pipe, and the second straight pipe is slidably sleeved on the outer peripheral surface of the first straight pipe.

[0008] As an optimization of a quick repair device for leakage of PE pipes for building drainage, the inner diameter of the first straight pipe is equal to the inner diameter of the connecting head, the inner diameter of the second straight pipe is greater than or equal to the outer diameter of the first straight pipe, and a guide ring plate is fixedly connected between the second straight pipe and the connected connecting head, and the guide ring plate is fixedly connected to the inner wall of the second straight pipe.

[0009] As an optimization of a quick repair device for building drainage PE pipe leakage, the cross-section of the guide ring plate is triangular, and the angle formed by the inner inclined surface of the guide ring plate and the end surface of the connector away from the sealing ring groove is 45°.

[0010] As an optimization of a quick repair device for leakage of a building drainage PE pipe, a sealing ring is sleeved on the outer circumference of the first straight pipe, and the second straight pipe is sleeved on the outer circumference of the sealing ring.

[0011] As an optimization of a quick repair device for leakage of a building drainage PE pipe, a sealing hose is sleeved on the outer side of the second straight pipe, and both ends of the sealing hose are fixedly connected to the two connectors respectively.

[0012] As an optimization of a quick repair device for leakage of a building drainage PE pipe, a plurality of friction grooves are arranged on the peripheral side of the connector, and the plurality of friction grooves are equidistantly distributed in a circular shape along the circumference of the connector.

[0013] As an optimization of a quick repair device for leakage of a building drainage PE pipe, an arc groove is provided on one side of the inner wall of the connector close to the end face of the connector.

[0014] Compared with the prior art, the beneficial effect of the utility model is that when a leaking PE pipe needs to be repaired, the leaking part of the PE pipe is cut off, the two sections of the PE pipe are respectively matched with the two connectors, the PE pipe is inserted into the sealing ring groove, and then the sealing ring is embedded in the sealing ring groove, so that the PE pipe is expanded and installed in the sealing ring groove, and then the second straight pipe is slidably sleeved on the first straight pipe, so that the two connectors are butted, and the length of the cut PE pipe is compensated by adjusting the overlapping length of the second straight pipe and the first straight pipe, so that the total length of the PE pipe is equal to the original length, thereby facilitating multiple repairs and increasing sustainable utilization. In addition, the device does not require the use of special equipment during the maintenance process, the maintenance method is simple, and the maintenance efficiency can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 This is a schematic diagram of the overall structure of the device for quickly repairing leakage of a building drainage PE pipe according to an embodiment of the present application;

[0017] Figure 2This is a schematic cross-sectional view of a device for quickly repairing leakage of a PE pipe used for building drainage according to an embodiment of the present application;

[0018] Figure 3 This is an axial exploded view of the rapid repair device for building drainage PE pipe leakage according to an embodiment of the present application;

[0019] Figure 4 This is a schematic diagram of the docking of the building drainage PE pipe leakage quick repair device according to an embodiment of the present application.

[0020] In the figure: 1, connector; 11, friction groove; 12, arc groove; 2, sealing ring groove; 3, sealing ring; 4, first straight pipe; 5, second straight pipe; 6, guide ring plate; 7, sealing ring; 8, sealing hose; 9, PE pipe. DETAILED DESCRIPTION

[0021] In order to make the technical solution and advantages of the utility model clearer, the utility model and its beneficial effects will be further described in detail below in combination with specific implementation methods and drawings of the specification, but the implementation methods of the utility model are not limited thereto.

[0022] In the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0023] The standard parts used in the utility model can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt the conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.

[0024] The following is combined with Figure 1-4 , further details of this application are given.

[0025] The present application provides a rapid repair device for leakage of PE pipes for building drainage, which adopts the following technical solutions:

[0026] Reference Figure 1 and Figure 2The quick repair device for leakage of building drainage PE pipe 9 includes two connectors 1, which are in the shape of a circular tube and have a through hole inside. A sealing ring groove 2 is provided on the circumferential side wall of the connector 1, and the sealing ring groove 2 is matched with the PE pipe 9. A sealing ring 3 is embedded in the sealing ring groove 2, and the sealing ring 3 is tightly installed at the bottom of the sealing ring groove 2. When the PE pipe 9 is inserted into the sealing groove, the end of the PE pipe 9 is bonded to the sealing ring 3, and then a sealant is applied between the side wall of the sealing ring groove 2 and the wall of the PE pipe 9 to fix it, thereby improving the sealing of the PE pipe 9 and the connector 1. On the two connectors 1, a first straight pipe 4 is welded to the end of one connector 1 away from the sealing ring groove 2, and a second straight pipe 5 is welded to the end of the other connector 1 away from the sealing ring groove 2, and the second straight pipe 5 is sleeved on the first straight pipe 4 and slides. When it is necessary to connect two sections of PE pipe 9, the PE pipe 9 is installed on the connector 1, the first straight pipe 4 and the second straight pipe 5 are placed opposite to each other, the second straight pipe 5 is sleeved on the first straight pipe 4, and the overlapping length of the second straight pipe 5 and the first straight pipe 4 is adjusted according to the original length of the PE pipe 9 to compensate for the length of the PE pipe 9 cut off so that the total length of the repaired PE pipe 9 is equal to the original length of the PE pipe 9. This method not only has a simple structure and easy operation, but also can be repaired quickly, reducing labor costs and repair time, and improving the efficiency of pipeline leakage repair. In addition, it can be repaired multiple times, which is convenient for later leakage repair and has sustainable utilization.

[0027] Further, refer to Figure 2 The inner diameters of the two connectors 1 are equal, the inner diameter of the first straight pipe 4 is equal to the inner diameter of the connector 1, the inner diameter of the second straight pipe 5 is greater than or equal to the outer diameter of the first straight pipe 4, a guide ring plate 6 is installed between the second straight pipe 5 and the correspondingly connected connector 1, the guide ring plate 6 is installed on the inner wall of the second straight pipe 5, the water flow in the first straight pipe 4 flows into the second straight pipe 5 and is guided into the connector 1 through the guide ring plate 6, thereby improving the smoothness of the water flow through the two connectors 1.

[0028] Furthermore, refer to Figure 2 The cross section of the guide ring plate 6 is triangular, and the angle formed by the inner inclined surface of the guide ring plate 6 and the end surface of the connector 1 away from the sealing ring groove 2 is 45°, which reduces the right angle of the connection inside the second straight pipe 5, thereby improving the smoothness of the water flow from the second straight pipe 5 into the connector 1, and further improving the smoothness of the water flow through the two connectors 1.

[0029] In the preferred embodiment of the present application, refer to Figure 2 and Figure 3The outer circumference of the first straight tube 4 is sleeved with a sealing ring 7, and the second straight tube 5 is sleeved on the outer circumference of the sealing ring 7. When the second straight tube 5 slides on the outer circumference of the first straight tube 4, there is a clearance fit between the second straight tube 5 and the first straight tube 4. After determining the overlap length of the first straight tube 4 and the second straight tube 5, the sealing ring 7 is expanded and installed between the second straight tube 5 and the first straight tube 4, so that there is an interference fit between the second straight tube 5 and the first straight tube 4, thereby improving the sealing between the first straight tube 4 and the second straight tube 5.

[0030] In the preferred embodiment of the present application, refer to Figure 2 , Figure 3 and Figure 4 The outer side of the second straight tube 5 is sleeved with a sealing hose 8, and the two ends of the sealing hose 8 are connected to the connectors 1 on both sides. Specifically, the end surface of the sealing hose 8 and the end surface of the connector 1 away from the sealing ring groove 2 are bonded by a sealant. In this embodiment, the sealing hose 8 is a threaded sealing tube. By sleeved with the sealing hose 8 on the outer groove of the second straight tube 5, on the one hand, it can prevent external mud and dust from entering the sliding connection between the second straight tube 5 and the first straight tube 4, reduce wear and increase service life; on the other hand, the sealing hose 8 serves as the second seal between the second straight tube 5 and the first straight tube 4, and the sealing between the first straight tube 4 and the second straight tube 5 is further improved through double sealing.

[0031] In the preferred embodiment of the present application, refer to Figure 3 and Figure 4 A plurality of friction grooves 11 are provided on the peripheral side of the connector 1, and the friction grooves 11 are equidistantly distributed along the circumference of the connector 1. The friction grooves 11 can increase the roughness of the surface of the connector 1, increase the friction force of the connector 1, make the connector 1 easier to hold and rotate in the construction environment, facilitate installation, and help improve maintenance efficiency.

[0032] In the preferred embodiment of the present application, refer to Figure 2 , Figure 3 and Figure 4 An arc groove 12 is provided on the inner wall of the connector 1, and the arc groove 12 extends from the end surface of the connector 1 to the inner side of the connector 1. The arc groove 12 can guide the water flow in the PE pipe 9 to the inside of the connector 1, reduce blockage and side wall leakage, and help improve the smoothness of the water flow.

[0033] The experimental principle of the embodiment of the present application is as follows: when the PE pipe 9 needs to be repaired, the leaking part of the PE pipe 9 is cut off, and the two sections of the PE pipe 9 are respectively installed in the sealing ring grooves 2 of the two connectors 1 through the sealing rings 3, and the first straight pipe 4 and the second straight pipe 5 are connected to each other, and the second straight pipe 5 is sleeved on the first straight pipe 4. According to the cut length of the PE pipe 9, the overlapping length of the second straight pipe 5 and the first straight pipe 4 is adjusted, so that the length of the connected PE pipe 9 is equal to the original length of the PE pipe 9, which is convenient for later leakage repair and makes the pipeline sustainable. Then install the sealing ring 7 between the first straight pipe 4 and the second straight pipe 5, and install the sealing hose 8 on the outside of the second straight pipe 5 for double sealing, thereby improving the sealing of the connection between the first straight pipe 4 and the second straight pipe 5. The smoothness of the water flow inside the connector 1 is improved by the arc groove 12 and the guide ring plate 6 on the inner wall of the connector 1. The device is not only light in structure, reduces maintenance costs, is easy to operate, reduces maintenance time, and improves maintenance efficiency, but also can flexibly adjust the length of the PE pipe 9, facilitates later leakage repairs, and multiple repairs, and has good sustainable utilization.

[0034] According to the disclosure and teaching of the above description, the technicians in the field of the utility model can also change and modify the above implementation. Therefore, the utility model is not limited to the above specific implementation, and any obvious improvement, replacement or modification made by the technicians in this field on the basis of the utility model belongs to the protection scope of the utility model. In addition, although some specific terms are used in this specification, these terms are only for the convenience of explanation and do not constitute any limitation to the utility model.

Claims

1. A quick repair device for leakage of PE pipes for building drainage, characterized in that: It comprises two connectors, each of which is provided with a sealing ring groove for plugging a PE pipe, and a sealing ring is embedded in the sealing ring groove. One end of one of the connectors away from the sealing ring groove is fixedly connected to a first straight pipe, and the other end of the connector away from the sealing ring groove is fixedly connected to a second straight pipe, and the second straight pipe is slidably sleeved on the outer circumferential surface of the first straight pipe.

2. A rapid repair device for building drainage PE pipe leakage according to claim 1, characterized in that: The inner diameter of the first straight tube is equal to the inner diameter of the connecting head, the inner diameter of the second straight tube is greater than or equal to the outer diameter of the first straight tube, and a guide ring plate is fixedly connected between the second straight tube and the connecting head, and the guide ring plate is fixedly connected to the inner wall of the second straight tube.

3. A rapid repair device for building drainage PE pipe leakage according to claim 2, characterized in that: The cross section of the guide ring plate is triangular, and the angle formed by the inner inclined surface of the guide ring plate and the end surface of the connector away from the sealing ring groove is 45°.

4. A rapid repair device for building drainage PE pipe leakage according to claim 2, characterized in that: A sealing ring is sleeved on the outer circumference of the first straight tube, and the second straight tube is sleeved on the outer circumference of the sealing ring.

5. A rapid repair device for leakage of PE pipes for building drainage according to claim 1, characterized in that: A sealing hose is sleeved on the outer side of the second straight pipe, and two ends of the sealing hose are fixedly connected to the two connectors respectively.

6. A rapid repair device for building drainage PE pipe leakage according to claim 1, characterized in that: A plurality of friction grooves are arranged on the peripheral side of the connector, and the plurality of friction grooves are distributed equidistantly along the circumference of the connector.

7. A rapid repair device for building drainage PE pipe leakage according to claim 1, characterized in that: An arc groove is arranged on one side of the inner wall of the connector close to the end surface of the connector.