Tower crane enclosure and rainproof structure outside basement

By designing the retaining wall enclosure structure around the tower crane foundation, the problem of the tower crane foundation being buried with backfill soil was solved, and rapid backfill and construction roads were achieved, without affecting other floor layouts on the site.

CN222893670UActive Publication Date: 2025-05-23THE FOURTH CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421742533.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2025-05-23
Estimated Expiration
2034-07-23

AI Technical Summary

Technical Problem

During the construction process, there is no soil retention measure around the tower crane foundation, which causes backfill to bury the tower crane foundation, affecting the construction progress and on-site floor layout.

Method used

A tower crane enclosure and rainproof structure outside the basement is designed, including the tower crane foundation and standard section. The retaining wall is built around it. The top height of the retaining wall is higher than the natural ground and connected to the end to form a barrel enclosure structure. A barrier cover is set on the top of the retaining wall to prevent rainwater from invasion.

Benefits of technology

Through the stress characteristics of the barrel structure of the retaining wall, structural instability caused by backfill is avoided, and rapid backfill to natural ground height is achieved, forming a construction road without affecting other floor layouts on site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222893670U_ABST
    Figure CN222893670U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to a basement external tower crane enclosure and rainproof structure which comprises a tower crane foundation and a tower crane standard knot, retaining walls are built above the tower crane foundation, the top of each retaining wall is higher than the natural ground, and the retaining walls are connected end to end and arranged on the periphery of the tower crane standard knot in a barrel surrounding mode. The retaining wall comprises a masonry layer and a concrete ring beam layer which are arranged at an interval; a blocking cover is arranged above the concrete ring beam layer at the top of the retaining wall; by means of the stress characteristic of a barreled structure of the retaining wall, it is guaranteed that the retaining wall cannot be unstable and damaged when soil is backfilled on the outer side, after basement construction is completed, fat groove backfilling in the area outside the retaining wall can be rapidly conducted, and after backfilling is conducted to the natural ground height, a construction road between the natural ground and a basement top plate is formed; and other on-site plane arrangements are not influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a tower crane enclosure and rainproof structure outside a basement. Background Art

[0002] During the construction process, according to the actual situation of some project sites, the tower crane needs to be set up at the fertilizer trough position close to the outer wall of the basement. The foundation elevation is lower than the elevation of the basement roof and the natural ground height. After the construction of the building basement is completed, the fertilizer trough involves backfilling. If there are no retaining measures around the tower crane foundation, the tower crane foundation and the bottom standard section will be buried by backfill soil. The previous method was to reserve the earth around the tower crane foundation without backfilling, and then backfill after the main capping tower crane was dismantled. This would cause the fertilizer trough to be backfilled late, and the road between the natural ground and the basement roof would be blocked, affecting the site layout. For this reason, a tower crane enclosure and rainproof structure outside the basement is proposed. Utility Model Content

[0003] The utility model aims to solve the above problems, thereby providing a tower crane enclosure and rainproof structure outside a basement.

[0004] The utility model solves the above problems and adopts the following technical solutions:

[0005] A tower crane enclosure and rainproof structure outside a basement comprises a tower crane foundation and a tower crane standard section, a retaining wall is built above the tower crane foundation, the top height of the retaining wall is higher than the natural ground height, the retaining wall is connected end to end and is arranged in a barrel-like shape around the outer periphery of the tower crane standard section, the retaining wall comprises a masonry layer and a concrete ring beam layer arranged at intervals, and a retaining cover is arranged above the concrete ring beam layer at the top of the retaining wall.

[0006] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:

[0007] The utility model has a simple structure and is easy to construct. It utilizes the stress characteristics of the barrel structure of the retaining wall to ensure that the retaining wall will not become unstable and damaged when backfilling soil on the outside. After the basement construction is completed, the fertilizer trough in the area outside the retaining wall can be backfilled quickly. After backfilling to the natural ground height, a construction road is formed between the natural ground and the basement roof, which does not affect other plane layouts on the site.

[0008] As a preferred embodiment, a further technical solution of the utility model is:

[0009] A plurality of buttresses are integrally formed and built on the inner wall of the retaining wall to increase the structural strength of the retaining wall.

[0010] A cement mortar layer is provided on the outer wall of the retaining wall facing the soil, which increases the structural strength of the retaining wall and reduces the infiltration of external rainwater into the retaining wall.

[0011] A water collection well is arranged on one side of the tower crane foundation, and an upper cover is arranged above the water collection well. The upper surface of the tower crane foundation is a slope structure, and the side close to the water collection well is lower. A drainage pipe is arranged on the lower side, and one end of the drainage pipe passes through the retaining wall and the water collection well cover and is inserted into the water collection well to avoid water accumulation above the foundation in the retaining wall.

[0012] The top surface of the retaining cover is an inclined surface with a slope of not less than 20°, and the edge of the top surface extends to the outside of the retaining wall to prevent rainwater from flowing into the tower crane foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the main structure of an embodiment of the utility model;

[0014] Figure 2 It is a schematic diagram of the top view of the structure of an embodiment of the utility model;

[0015] Marked in the figure are: tower crane foundation 1, tower crane standard section 2, retaining wall 3, retaining cover 4, drainage pipe 5, water collection well 6, upper cover 7, corrugated pipe 8, backfill soil 9, slope structure 10, natural ground 11, masonry layer 3-1, concrete ring beam layer 3-2, buttress column 3-3. DETAILED DESCRIPTION

[0016] The present invention is further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0017] See also Figure 1-Figure 2 A tower crane enclosure and rainproof structure outside a basement, comprising a tower crane foundation 1 and a tower crane standard section 2, a retaining wall 3 is built above the tower crane foundation 1, the top height of the retaining wall 3 is higher than the height of the natural ground 5, the retaining wall 3 is connected end to end and is arranged in a barrel-like shape around the outer periphery of the tower crane standard section 2, the retaining wall 3 comprises a masonry layer 3-1 and a concrete ring beam layer 3-2 arranged at intervals, and a retaining cover 4 is arranged above the concrete ring beam layer 3-1 at the top of the retaining wall 3.

[0018] A plurality of buttress columns 3 - 3 are integrally formed and built on the inner wall of the retaining wall 3 , thereby increasing the structural strength of the retaining wall 3 .

[0019] A cement mortar layer is arranged on the outer wall of the retaining wall 3 facing the soil, which increases the structural strength of the retaining wall 3 and reduces the infiltration of external rainwater into the retaining wall 3.

[0020] A water collection well 6 is arranged on one side of the tower crane foundation 1, and an upper cover 7 is arranged above the water collection well 6. The upper surface of the tower crane foundation 1 is a slope structure 10, and the side close to the water collection well 6 is lower. A drainage pipe 5 is arranged on the lower side, and one end of the drainage pipe 5 passes through the retaining wall 3 and the water collection well upper cover 7, and is inserted into the water collection well 6 to avoid water accumulation above the tower crane foundation 1 in the retaining wall 3.

[0021] A corrugated pipe 8 is also provided above the water collection well 6, one end of the corrugated pipe 8 is inserted into the water collection well 6, and the other end thereof is protruded out of the natural ground 11 after the backfill soil 9 is backfilled, and the protruding height is 300 mm.

[0022] During actual construction, please refer to the following construction steps and precautions:

[0023] Clean other materials on the tower crane foundation 1 and clean the surface of the tower crane foundation 1; use concrete mortar to make slope on the surface of the tower crane foundation 1 with a slope of 2%;

[0024] A water collection well 6 is excavated on one side of the tower crane foundation 1, and the water collection well 6 is located on the lower side of the slope structure 10 of the tower crane foundation 1;

[0025] A drainage pipe 5 is selected and placed above the lower side of the slope structure 10, and one end of the drainage pipe 5 is inserted into the water collection well 6;

[0026] Build a retaining wall 3, which is cylindrical, and its central axis is collinear with the central axis of the tower crane standard section 2; the retaining wall 3 is arranged from bottom to top with a masonry layer 3-1 and a concrete ring beam layer 3-2 at intervals. During the masonry process, the height of the masonry layer 3-1 does not exceed 2m. After the construction of the retaining wall 3 is completed, the top surface elevation is 500mm higher than the natural ground;

[0027] Apply cement mortar on the soil side of retaining wall 3;

[0028] Make a baffle 4, which is cone-shaped as a whole; it is made of a combination of wood, formwork and steel pipes. First, use steel pipes to build a sealing frame, then lay wooden beams on the sealing frame as secondary ribs, lay formwork on the wooden beams for reinforcement, and finally paint the surface of the formwork with red and white paint. The edge of the formwork exceeds the outer edge of the enclosing wall by at least 100mm to prevent rainwater from flowing into the tower crane foundation.

[0029] The utility model has a simple structure and is easy to construct. It utilizes the stress characteristics of the barrel structure of the retaining wall to ensure that the retaining wall will not become unstable and damaged when backfilling soil on the outside. After the basement construction is completed, the fertilizer trough in the area outside the retaining wall can be backfilled quickly. After backfilling to the natural ground height, a construction road is formed between the natural ground and the basement roof, which does not affect other plane layouts on the site.

[0030] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.

Claims

1. A tower crane enclosure and rainproof structure outside a basement, comprising a tower crane foundation and a tower crane standard section, characterized in that: A retaining wall is built above the tower crane foundation. The top of the retaining wall is higher than the natural ground level. The retaining wall is connected end to end and is arranged in a barrel-like shape around the outer periphery of the standard section of the tower crane. The retaining wall includes masonry layers and concrete ring beam layers arranged at intervals. A retaining cover is arranged above the concrete ring beam layer at the top of the retaining wall.

2. The outer tower crane enclosure and rainproof structure of the basement according to claim 1 is characterized by: A plurality of buttresses are integrally formed and built on the inner wall of the retaining wall.

3. The outer tower crane enclosure and rainproof structure of a basement according to claim 1 is characterized by: A cement mortar layer is provided on the outer wall of the retaining wall facing the soil.

4. The outer tower crane enclosure and rainproof structure of a basement according to claim 1 is characterized by: A water collection well is arranged on one side of the tower crane foundation, and an upper cover is arranged above the water collection well. The upper surface of the tower crane foundation is a slope structure, and the side close to the water collection well is lower. A drainage pipe is arranged on the lower side, and one end of the drainage pipe passes through the retaining wall and the water collection well upper cover and is inserted into the water collection well.

5. The outer tower crane enclosure and rainproof structure of a basement according to claim 1 is characterized by: The top surface of the retaining cover is an inclined surface, and the edge of the top surface extends toward the outside of the retaining wall.