Greening retaining wall for municipal construction

By designing a municipal construction green retaining wall structure including articulated and threaded connections, the stability of the retaining wall in installation, transportation and strong winds is solved, and convenient operation and safety improvement is achieved.

CN222897722UActive Publication Date: 2025-05-27PIQAN COUNTY XINXING CONSTR & INSTALLATION ENG CO
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421912317.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2025-05-27
Estimated Expiration
2034-08-08

AI Technical Summary

Technical Problem

Due to the large height and weight of municipal construction green retaining walls, it is difficult to operate during installation, storage and transportation, and its stability is threatened under strong wind conditions, which poses a risk of collapse.

Method used

A structure including a green retaining wall, a C-shaped connecting seat, locking bolts, hinged seats, support rods and breathable holes is designed. The retaining wall is folded and fixed by hinged and threaded connections, and a water-absorbing filter cotton and rain collecting chamber are installed in the retaining wall to reduce the influence of wind and dust.

Benefits of technology

It realizes convenient installation, storage and transportation of green retaining walls in municipal construction, improves the stability and safety of retaining walls, especially in strong wind conditions, the stress area is reduced through breathable holes and reduces the risk of collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222897722U_ABST
    Figure CN222897722U_ABST
Patent Text Reader

Abstract

The utility model provides a municipal construction greening retaining wall, and relates to the technical field of greening retaining walls, the municipal construction greening retaining wall comprises a first greening retaining wall body, both sides of the first greening retaining wall body are fixedly connected with C-shaped connecting seats, locking bolts penetrate through the C-shaped connecting seats and are in threaded connection with the C-shaped connecting seats, the top of the first greening retaining wall body is hinged with a second greening retaining wall, and the top of the second greening retaining wall body is hinged with a third greening retaining wall body. A third greening retaining wall is hinged to the bottom of the first greening retaining wall body, and hinge bases are fixedly connected to the two sides of the third greening retaining wall and the two sides of the second greening retaining wall; compared with the prior art, the municipal construction greening retaining wall has the advantages that the first greening retaining wall body, the second greening retaining wall body and the third greening retaining wall body can be folded, and the municipal construction greening retaining wall can be stored and transported conveniently; according to the municipal construction greening retaining wall, the humidity in the environment is large, dust absorbs water and falls to the ground, the dust amount is reduced, a construction site is greened, under the strong wind weather condition, strong wind penetrates through the air holes, the stress area of the municipal construction greening retaining wall is reduced, and the municipal construction greening retaining wall is more stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of green retaining walls, and particularly relates to a green retaining wall for municipal construction. Background Art

[0002] The green retaining wall for municipal construction, also known as an ecological retaining wall or a green retaining wall, is a municipal engineering project integrating protection, greening and beautification functions. The green retaining wall for municipal construction is mainly used to set up a protection barrier around roads, bridges, tunnels, buildings, etc. By constructing a solid structure, it can effectively prevent soil erosion and soil erosion, has a certain sound insulation effect, helps to improve the noise pollution of the surrounding environment, increases the green space, and improves the quality of the urban ecological environment. The green retaining wall is usually composed of a variety of materials, including but not limited to plants, stones, concrete, geogrids. The green retaining wall for municipal construction is more environmentally friendly and energy-saving, has a short construction period, low cost, and good landscape effect compared with traditional retaining walls. The green retaining wall for municipal construction is applicable to various municipal engineering projects that need to set up protection barriers and increase green space, such as areas on both sides of roads, under bridges, at tunnel entrances and exits, and around buildings;

[0003] After retrieval, the utility model with the publication number of CN220044281U discloses a green retaining wall for municipal construction. Although this utility model patent solves the problems in the prior art that there are many water supply pipes, the water pressure is easily affected when watering, the water pressure of the sprinkler at the end of the water supply is small, which affects the uniformity of irrigation, and the cost of many water supply pipes is high; however, this utility model patent has the following problems:

[0004] First, due to the certain height and weight of the green retaining wall for municipal construction of this utility model patent, the operation difficulty is significantly increased during installation, storage and transportation, resulting in lower overall practicability and convenience of the green retaining wall for municipal construction, which is not conducive to wide promotion and application;

[0005] Second, due to the large area of the green retaining wall for municipal construction, when encountering strong wind weather conditions, the large surface area of the green retaining wall for municipal construction will directly bear a greater wind force, so the stability of the retaining wall is seriously threatened, and there is a potential risk of collapse, which may not only damage the facilities at the construction site, but also pose a major hidden danger to the safety of surrounding personnel and the environment, with greater danger;

[0006] Therefore, a green retaining wall for municipal construction is proposed. Utility Model Content

[0007] In view of this, the utility model provides a green retaining wall for municipal construction to solve or alleviate the technical problems existing in the prior art, and at least provide a beneficial choice.

[0008] The technical solution of the utility model is realized as follows: A greening retaining wall for municipal construction includes a first greening retaining wall body. Both sides of the first greening retaining wall body are fixedly connected with C-shaped connecting seats. A locking bolt penetrates through and is threadedly connected inside the C-shaped connecting seats. The top of the first greening retaining wall body is hinged with a second greening retaining wall, and the bottom of the first greening retaining wall body is hinged with a third greening retaining wall. Both sides of the third greening retaining wall and the second greening retaining wall are fixedly connected with hinge seats. A support rod is hinged inside the hinge seats. One end of the support rod close to the C-shaped connecting seat is provided with a C-shaped connecting groove, and the C-shaped connecting groove is in contact with the outer part of the locking bolt. The outer walls of the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall are provided with ventilation holes. Both ends of the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall are provided with water inlets. Both ends of the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall are fixedly connected with rain collection cavities. A water absorption filter cotton is arranged inside the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall.

[0009] Further preferably, both sides of the first greening retaining wall body and the second greening retaining wall are fixedly connected with C-shaped support frames. A greening planting box is arranged on the side of the C-shaped support frame far away from the first greening retaining wall body and the second greening retaining wall. A fixing bolt is threadedly connected inside the greening planting box, and the fixing bolt is threadedly connected inside the C-shaped support frame.

[0010] Further preferably, the number of the ventilation holes is multiple groups, and the multiple ventilation holes are evenly distributed on the outer walls of the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall.

[0011] Further preferably, multiple groups of greening planting boxes are arranged, and the multiple groups of greening planting boxes are evenly distributed.

[0012] Further preferably, both sides of the third greening retaining wall are fixedly connected with L-shaped support seats, and a greening counterweight box is arranged inside the L-shaped support seats.

[0013] Further preferably, the bottom of the L-shaped support seat is fixedly connected with anti-slip gaskets, and four groups of anti-slip gaskets are arranged.

[0014] Due to the adoption of the above technical solutions in the embodiments of the utility model, it has the following advantages:

[0015] First, in the utility model, the greening counterweight box is removed, the greening planting box is taken down, the locking bolt is screwed out, and the support rod is swung to the left and right sides, so as to fold the first greening retaining wall body, the second greening retaining wall, and the third greening retaining wall, which is convenient for the storage and transportation of the greening retaining wall for municipal construction.

[0016] Second, in the present utility model, rainwater is absorbed by the water-absorbing filter cotton through the water inlet, which increases the humidity in the environment and causes dust to absorb water and fall to the ground, thereby reducing the dust amount. Greening is carried out at the construction site. Under strong wind weather conditions, strong winds pass through the ventilation holes, reducing the stress area of the greening retaining wall for municipal construction and making the greening retaining wall for municipal construction more stable.

[0017] The above summary is only for the purpose of the specification and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features of the present utility model will be readily apparent by reference to the drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.

[0019] Figure 1 It is a schematic diagram of the overall structure of the present utility model;

[0020] Figure 2 It is a schematic diagram of the partial structure of the present utility model;

[0021] Figure 3 It is a schematic diagram of the second sectional view structure of the greening retaining wall of the present utility model;

[0022] Figure 4 It is a schematic diagram of the C-shaped support frame and the greening planting box of the present utility model.

[0023] Reference numerals: 1, the first greening retaining wall body; 2, C-shaped connecting seat; 3, locking bolt; 4, the second greening retaining wall; 5, the third greening retaining wall; 6, hinge seat; 7, support rod; 8, ventilation hole; 9, water inlet; 10, rainwater collection cavity; 11, water-absorbing filter cotton; 12, C-shaped support frame; 13, greening planting box; 14, fixing bolt; 15, L-shaped support seat; 16, greening counterweight box; 17, anti-slip gasket; 18, C-shaped connecting groove. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0024] In the following text, only some exemplary embodiments are simply described. As those skilled in the art can recognize, the described embodiments can be modified in various different ways without departing from the spirit or scope of the present utility model. Therefore, the drawings and the description are considered to be exemplary in nature rather than restrictive.

[0025] The embodiments of the present utility model will be described in detail below with reference to the drawings.

[0026] As shown Figures 1 - 4 in the figure, an embodiment of the utility model provides a greening retaining wall for municipal construction, which comprises a first greening retaining wall body 1. C-shaped connecting seats 2 are fixedly connected to both sides of the first greening retaining wall body 1. A locking bolt 3 penetrates through and is threadedly connected inside the C-shaped connecting seat 2. A second greening retaining wall 4 is hinged to the top of the first greening retaining wall body 1, and a third greening retaining wall 5 is hinged to the bottom of the first greening retaining wall body 1. Hinge seats 6 are fixedly connected to both sides of the third greening retaining wall 5 and the second greening retaining wall 4. A support rod 7 is hinged inside the hinge seat 6. A C-shaped connecting groove 18 is formed at one end of the support rod 7 close to the C-shaped connecting seat 2, and the C-shaped connecting groove 18 is in contact with the outer part of the locking bolt 3. Ventilation holes 8 are formed in the outer walls of the first greening retaining wall body 1, the second greening retaining wall 4 and the third greening retaining wall 5. Water inlets 9 are formed at both ends of the first greening retaining wall body 1, the second greening retaining wall 4 and the third greening retaining wall 5. Rainwater collecting cavities 10 are fixedly connected to both ends of the first greening retaining wall body 1, the second greening retaining wall 4 and the third greening retaining wall 5. A water absorption filter cotton 11 is arranged inside the first greening retaining wall body 1, the second greening retaining wall 4 and the third greening retaining wall 5.

[0027] In one embodiment, C-shaped support frames 12 are fixedly connected to both sides of the first greening retaining wall body 1 and the second greening retaining wall 4. A greening planting box 13 is arranged on the side of the C-shaped support frame 12 far away from the first greening retaining wall body 1 and the second greening retaining wall 4. A fixing bolt 14 is threadedly connected inside the greening planting box 13, and the fixing bolt 14 is threadedly connected inside the C-shaped support frame 12. The number of the ventilation holes 8 is multiple groups, and the multiple ventilation holes 8 are evenly distributed on the outer walls of the first greening retaining wall body 1, the second greening retaining wall 4 and the third greening retaining wall 5. The wind prevention and filtering effects of the multiple ventilation holes 8 are better.

[0028] In one embodiment, multiple groups of greening planting boxes 13 are arranged, and the multiple groups of greening planting boxes 13 are evenly distributed. More plants can be planted in the multiple groups of greening planting boxes 13, and the greening effect is better. L-shaped support seats 15 are fixedly connected to both sides of the third greening retaining wall 5, and a greening counterweight box 16 is arranged inside the L-shaped support seat 15. Green plants are planted in the greening counterweight box 16, which not only makes the greening effect better, but also adds a certain amount of counterweight to the greening retaining wall for municipal construction to prevent the greening retaining wall for municipal construction from collapsing and causing danger. Four anti-slip gaskets 17 are fixedly connected to the bottom of the L-shaped support seat 15. The anti-slip gaskets 17 are used to increase the friction force and make the greening retaining wall for municipal construction more stable.

[0029] When the utility model is working: pull the second green retaining wall 4 upwards, and the second green retaining wall 4 drives the first green retaining wall body 1 and the third green retaining wall 5 to move upwards. When the first green retaining wall body 1, the second green retaining wall 4 and the third green retaining wall 5 are coplanar, swing the support rods 7 connected to the second green retaining wall 4 and the third green retaining wall 5 towards the C-shaped connecting seat 2 respectively, so that the C-shaped connecting groove 18 moves into the C-shaped connecting seat 2. Screw the locking bolt 3 into the C-shaped connecting seat 2 and the C-shaped connecting groove 18. Through the extrusion of the C-shaped connecting seat 2 by the locking bolt 3, the C-shaped connecting seat 2 approaches the support rod 7, thereby fixing the support rod 7, that is, completing the preliminary support of the green retaining wall for municipal construction. Then, sequentially fix a plurality of green planting boxes 13 to the outside of the C-shaped support frame 12 through fixing bolts 14, and then place the green counterweight box 16 on the upper side of the L-shaped support seat 15, that is, complete the installation of the green retaining wall for municipal construction. When it is necessary to store the green retaining wall for municipal construction, remove the green counterweight box 16, screw out the fixing bolts 14, thereby removing the green planting boxes 13, and then sequentially screw out the locking bolts 3, swing the support rods 7 to the left and right sides, thereby folding the first green retaining wall body 1, the second green retaining wall 4 and the third green retaining wall 5, which is convenient for the storage and transportation of the green retaining wall for municipal construction; when it rains, the rainwater collecting cavity 10 collects rainwater, and the rainwater is absorbed by the water absorption filter cotton 11 through the water inlet 9, so that the humidity in the environment is relatively high, the dust absorbs water and falls to the ground, thereby reducing the dust amount, further greening the construction site. At the same time, when encountering strong wind weather conditions, the strong wind passes through the ventilation holes 8, reducing the stress area of the green retaining wall for municipal construction and making the green retaining wall for municipal construction more stable.

[0030] The above is only the specific implementation manner of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present utility model can easily think of various changes or substitutions thereof, and these should all be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be subject to the protection scope of the claimed rights.

Claims

1. A municipal construction greening retaining wall, characterized by: The invention comprises a greening retaining wall body (1), both sides of which are fixedly connected with C-shaped connecting seats (2), a locking bolt (3) is passed through and threadedly connected in the C-shaped connecting seat (2), a greening retaining wall body (1) is hingedly connected with a greening retaining wall (4) at the top, a greening retaining wall body (1) is hingedly connected with a greening retaining wall (5) at the bottom, both sides of the greening retaining wall (5) and the greening retaining wall (4) are fixedly connected with hinge seats (6), a support rod (7) is hingedly connected in the hinge seat (6), and a C-shaped connecting groove is provided at one end of the support rod (7) close to the C-shaped connecting seat (2). (18), the C-shaped connection groove (18) contacts the outside of the locking bolt (3), the outer walls of the greening retaining wall body 1 (1), the greening retaining wall 2 (4) and the greening retaining wall 3 (5) are provided with air holes (8), the two ends of the greening retaining wall body 1 (1), the greening retaining wall 2 (4) and the greening retaining wall 3 (5) are provided with water inlets (9), the two ends of the greening retaining wall body 1 (1), the greening retaining wall 2 (4) and the greening retaining wall 3 (5) are fixedly connected with rain collecting chambers (10), and the greening retaining wall body 1 (1), the greening retaining wall 2 (4) and the greening retaining wall 3 (5) are provided with water absorbing filter cotton (11) inside.

2. A municipal construction greening retaining wall according to claim 1, characterized in that: Both sides of the greening retaining wall body 1 (1) and the greening retaining wall body 2 (4) are fixedly connected with a C-shaped support frame (12); a greening planting box (13) is arranged on the side of the C-shaped support frame (12) away from the greening retaining wall body 1 (1) and the greening retaining wall body 2 (4); a fixing bolt (14) is threadedly connected to the inside of the C-shaped support frame (12).

3. A municipal construction greening retaining wall according to claim 1, characterized in that: The number of the ventilation holes (8) is a plurality of groups, and the plurality of ventilation holes (8) are evenly distributed on the outer walls of the greening retaining wall body 1 (1), the greening retaining wall body 2 (4) and the greening retaining wall body 3 (5).

4. A municipal construction greening retaining wall according to claim 2, characterized in that: The greening planting boxes (13) are provided in multiple groups, and the multiple groups of greening planting boxes (13) are evenly distributed.

5. A municipal construction greening retaining wall according to claim 1, characterized in that: The two sides of the greening retaining wall (5) are fixedly connected with an L-shaped support seat (15), and a greening counterweight box (16) is arranged inside the L-shaped support seat (15).

6. A municipal construction greening retaining wall according to claim 5, characterized in that: The bottom of the L-shaped support seat (15) is fixedly connected with an anti-skid pad (17), and four groups of the anti-skid pads (17) are provided.

Citation Information

Patent Citations

  • Greening retaining wall for municipal construction

    CN220044281U