Elbow joint mounting tool for secondary water supply construction
By designing a pipe bending joint installation tool for secondary water supply construction, and using components such as V iron and U-shaped clamps to achieve rapid positioning and fixing of pipe bending joints, the difficulty of fixing and connecting pipe bending joints during construction is solved, and the stability and convenience of construction are improved.
Patent Information
- Application Number
- CN202420971931.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2025-05-30
- Estimated Expiration
- 2034-05-08
AI Technical Summary
In the construction of secondary water supply pipelines in urban pipelines, there are difficulties in fixing and connecting pipe bent joints, especially pipeline connections with horizontal right angle change and vertical upward change. The existing technology lacks effective tooling equipment, resulting in inconvenience in construction.
A pipe bending joint installation tool for secondary water supply construction is designed, including flat plates, bases, vertical plates, V iron, U-shaped clamps and other components. The pipe bending joints are supported by V iron and the pipe bending fixing structure and U-shaped clamps on the vertical plate are quickly positioned and fixed.
The tooling can quickly position and fix the bent pipe joints, improve the stability and convenience of connection construction, and is suitable for construction with different pipe diameters and directional conditions.
Smart Images

Figure CN222925164U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of pipeline construction, and in particular relates to an installation tool for elbow joints used in secondary water supply construction. Background Technique
[0002] In the construction of secondary water supply pipelines in urban pipe networks, the layout direction of pipelines often turns left, turns right or changes direction vertically upward according to needs. Therefore, in pipeline construction, elbow joints are used to connect two pipelines at the turning point, and the connection between the elbow joint and the pipeline is often carried out by welding or bonding. During the construction process, in order to ensure welding or bonding operations, the elbow joint needs to be kept in a fixed state, but there is a lack of corresponding tooling equipment on site. For the connection of pipelines with horizontal right-angle changes (turning left or right), a support plate is usually used to simply support the elbow joint to ensure the fixed state of the elbow joint when connecting with the pipeline; for the connection of pipelines with vertical upward changes, the connection of the elbow joint requires two people to complete. One person controls the position of the elbow joint to ensure that one open end of the elbow joint is vertically upward and is aligned with the corresponding pipeline, and the other person performs the connection operation, which brings great inconvenience to the construction. Content of the Utility Model
[0003] In view of this, the utility model aims to propose an installation tool for elbow joints used in secondary water supply construction, so as to be able to quickly position and fix the elbow joint during the construction of secondary water supply pipelines, ensure the operation stability of the elbow joint, and improve the convenience of the connection construction of the elbow joint.
[0004] To achieve the above object, the technical solution of the utility model is realized as follows:
[0005] An installation tool for elbow joints used in secondary water supply construction includes a flat plate, and a base and a vertical plate arranged on the flat plate. The vertical plate is located on one side of the base. A support block is provided on the base, and a V-shaped iron is provided on the support block. The center line of the V-shaped iron is perpendicular to the vertical plate, and elbow fixing structures are respectively provided at the top, left end and right end of the vertical plate.
[0006] Further, the base is a U-shaped block structure with an opening facing downwards, which includes a top plate and two oppositely arranged side plates. A stud is threadedly connected to the top plate of the base, and the upper end of the stud is rotatably connected to the support block. The support block is supported by the stud, and a guiding structure is provided between the support block and the base.
[0007] Further, the guiding structure includes guiding columns respectively arranged at the left and right ends of the bottom surface of the support block, and the guiding columns penetrate through the top plate of the base.
[0008] Further, the elbow pipe fixing structure at the top of the vertical plate includes a horizontal strip hole opened at the top of the vertical plate, and the elbow pipe fixing structures at the left and right ends of the vertical plate include vertical strip holes opened at the left and right ends of the vertical plate. The horizontal strip hole and the vertical strip holes are respectively provided with U-shaped clamps for fixing the elbow pipe.
[0009] Further, universal wheels are provided at the bottom of the flat plate.
[0010] Further, a push rod is provided at one end of the flat plate close to the vertical plate.
[0011] Compared with the prior art, the elbow pipe joint installation tool for secondary water supply construction of the present utility model has the following advantages:
[0012] (1) In the present utility model, the V-shaped iron supports one end of the elbow pipe joint, and the elbow pipe fixing structure provided on the vertical plate fixes the other end of the elbow pipe joint, so that the state of the elbow pipe joint meets the construction requirements and remains fixed, facilitating the connection construction operation of the elbow pipe joint.
[0013] (2) In the present utility model, the up and down positions of the V-shaped iron can be adjusted to meet the construction operations of elbow pipe joints with different pipe diameters in secondary water supply construction. At the same time, the holes for installing the U-shaped clamps on the vertical plate are respectively horizontal strip holes and vertical strip holes, improving the versatility of the device. Description of the Drawings
[0014] The drawings constituting a part of the present utility model are used to provide a further understanding of the present utility model. The schematic embodiments of the present utility model and their descriptions are used to explain the present utility model and do not constitute an improper limitation to the present utility model. In the drawings:
[0015] Figure 1 is the front view of an elbow pipe joint installation tool for secondary water supply construction according to an embodiment of the present utility model;
[0016] Figure 2 is the top view of an elbow pipe joint installation tool for secondary water supply construction according to an embodiment of the present utility model;
[0017] Figure 3 is the left view of an elbow pipe joint installation tool for secondary water supply construction according to an embodiment of the present utility model;
[0018] Figure 4 is the three-dimensional structure schematic diagram of the vertical plate in this embodiment.
[0019] Description of the Reference Numerals:
[0020] 1 - flat plate; 2 - base; 3 - guide post; 4 - V-shaped iron; 5 - elbow pipe joint; 6 - U-shaped clamp; 7 - vertical plate; 71 - horizontal strip hole; 72 - vertical strip hole; 8 - push rod; 9 - hand wheel; 10 - support block; 11 - stud. Detailed implementation mode
[0021] The present utility model will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0022] An installation tool for elbow joints in secondary water supply construction, as Figure 1 、 2 shown in and Figure 3, includes a flat plate 1. Universal wheels are provided at the bottom of the flat plate 1, and the universal wheels are provided with a braking structure (not shown in the figure). A push rod 8 is provided on the flat plate 1 to push the flat plate 1 to move. A base 2 and a vertical plate 7 are arranged on the flat plate 1, and the vertical plate 7 is located on one side of the base 2.
[0023] The base 2 is a U-shaped block structure with an opening facing downwards, which includes a top plate and two side plates arranged opposite to each other. The two side plates are fixedly installed on the flat plate 1. A stud 11 is threadedly connected to the top plate of the base 2. A handwheel 9 is provided at the bottom end of the stud 11, and the upper end of the stud 11 is rotatably connected to a support block 10. For example, the stud 11 is connected to the support block 10 through a bearing. At this time, the support block 10 is supported by the stud 11, and the stud 11 can rotate relative to the support block 10. When the stud 11 rotates, the support block 10 can be driven to move up and down. Guide posts 3 are respectively provided at the left and right ends of the bottom surface of the support block 10 facing downwards. The top plate of the base 2 is provided with guide holes corresponding to the guide posts 3. The guide posts 3 pass through the corresponding guide holes, and the guide posts 3 and the guide holes form a guiding structure to ensure the up and down movement of the support block 10, ensure the linearity of the movement of the support block 10, and at the same time limit the rotational freedom of the support block 10, so that the support block 10 can only move in the vertical direction and cannot rotate with the stud 11. A V-shaped iron 4 is provided on the support block 10, and the center line of the V-shaped iron 4 is perpendicular to the vertical plate 7. The V-shaped iron 4 is used to support the elbow joint. Bending pipe fixing structures are respectively provided at the top end and the left and right ends of the vertical plate 7.
[0024] The structure of the vertical plate 7 is as Figure 4 shown. The bending pipe fixing structure at the top end of the vertical plate 7 includes a horizontal strip hole 71 opened at the top of the vertical plate 7. The bending pipe fixing structures at the left and right ends of the vertical plate 7 include vertical strip holes 72 opened at the left and right ends of the vertical plate. U-shaped clamps 6 for fixing the bending pipe are respectively arranged in the horizontal strip hole 71 and the vertical strip holes 72.
[0025] The operation process of the present utility model is as follows: Place the elbow joint 5 on the V-shaped iron 4. At this time, the V-shaped iron 4 supports the pipe diameter part corresponding to one opening end of the elbow joint 5. Adjust the position of the flat plate 1 and the position of the V-shaped iron 4 so that this opening end is directly opposite to the port of the horizontal pipe to be connected. Rotate the elbow joint 5 according to the position of the other port of the pipe to be connected, that is, make the other port of the elbow joint 5 face upwards or leftwards or rightwards according to the construction needs. In this embodiment, Figures 1 - 3The following shows the construction of a vertically upward pipe direction change. The other port of the elbow joint 5 is vertically upward. The U-shaped clamp 6 is used to fix the pipe diameter position of the elbow joint corresponding to this other port to the vertical plate 7, so that the position of the elbow joint 5 is fixed, and the positions of its two ports are fixed, facilitating the connection construction with the pipe. By the same token, when the pipe changes direction to the left or right, after the V-shaped iron 4 supports one end of the pipe joint 5, the other port of the pipe joint 5 is adjusted to be in a horizontal state, and then it is fixed to the corresponding vertical strip hole 72 using the U-shaped clamp 6 to achieve the fixation of the pipe joint 5.
[0026] The above are only the preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims
1. A elbow joint installation tool for secondary water supply construction, characterized in that: It comprises a flat plate (1), and a base (2) and a vertical plate (7) arranged on the flat plate (1), the vertical plate (7) being located on one side of the base (2), a support block (10) being arranged on the base (2), a V-iron (4) being arranged on the support block (10), the center line of the V-iron (4) being perpendicular to the vertical plate (7), and a bent pipe fixing structure being arranged at the top and the left and right ends of the vertical plate (7); The base (2) is a U-shaped block structure with an opening facing downward, comprising a top plate and two side plates arranged opposite to each other, the top plate of the base (2) is threadedly connected with a stud (11), the upper end of the stud (11) is rotatably connected to the support block (10), the support block (10) is supported by the stud (11), and a guide structure is provided between the support block (10) and the base (2); The bent pipe fixing structure at the top of the vertical plate (7) comprises a horizontal bar hole (71) opened at the top of the vertical plate (7), and the bent pipe fixing structures at the left and right ends of the vertical plate (7) comprise vertical bar holes (72) opened at the left and right ends of the vertical plate, respectively. The horizontal bar hole (71) and the vertical bar hole (72) are respectively provided with a U-shaped clamp (6) for fixing the bent pipe.
2. The elbow joint installation tool for secondary water supply construction according to claim 1 is characterized in that: The guide structure comprises guide columns (3) respectively arranged at the left and right ends of the bottom surface of the support block (10), and the guide columns (3) penetrate the top plate of the base (2).
3. The elbow joint installation tool for secondary water supply construction according to claim 1 is characterized in that: The bottom of the flat plate (1) is provided with universal wheels.
4. The elbow joint installation tool for secondary water supply construction according to claim 1 is characterized in that: The flat plate (1) is provided with a push rod (8) at one end adjacent to the vertical plate (7).