Simple device for installing wet joint formwork

Through the combined structures of templates, main corrugated boards, secondary corrugated screws, etc., the problems of slow installation and removal of wet joint templates are solved, and fast and safe formwork installation and removal are achieved.

CN223088281UActive Publication Date: 2025-07-11YCIH NO 2 WATER RESOURCES & HYDROPOWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421345725.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2025-07-11
Estimated Expiration
2034-06-13

AI Technical Summary

Technical Problem

The existing bridge project wet joint formwork is reliant on the lifting of small winches during the installation and removal of wet joint formwork. The construction speed is slow and cumbersome, and the formwork is safe and has low safety when dismantling.

Method used

The combined structure of formwork, main corrugated board, secondary corrugated screw, top rod, wire draw rope and traction rope is adopted. Through the cooperation of the wire draw rope and traction rope, the template is simple to install and remove, reducing the dependence of mechanical equipment.

Benefits of technology

It improves the construction speed and reduces the safety hazards of formwork removal. It has a simple structure, light weight, low cost, high installation efficiency and excellent safety performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223088281U_ABST
    Figure CN223088281U_ABST
Patent Text Reader

Abstract

The utility model discloses a simple device for installing a wet joint formwork, and relates to the technical field of bridge engineering, in particular to the simple device for installing the wet joint formwork, which comprises a formwork, a bolt A for fixing a plurality of main corrugated plates is arranged on the lower surface of the formwork in a threaded penetrating manner, and a bolt B for fixing a plurality of main corrugated plates is arranged on the lower surface of the formwork. Bolts B used for fixing a plurality of secondary ridges are arranged on the lower surfaces of the main ridge plates in a threaded and penetrating mode. During use, the steel wire pull rope is inserted into the anti-roll rod and is pulled upwards to pull and mount the formwork upwards, so that the formwork and the ejector rod are more easily aligned, the hexagonal nut at the top of the opposite-pull screw rod is detached and inserted into the ejector rod to fix the formwork after alignment, and after concrete pouring is completed and a next wet joint steel bar is mounted, the steel wire pull rope is pulled upwards to pull and mount the formwork. The pulling rope is hooked to the position of another wet joint through the hook and fixed through the ejector rod, the process is repeated, and the time consumed by workers for repeatedly hoisting the formwork through mechanical equipment is greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge engineering, and particularly relates to a simple device for installing wet joint formwork. Background Technique

[0002] The box girder is a commonly used bridge structure form, with a hollow box-shaped cross-section inside, and is commonly used in the construction of long-span bridges. In the construction of box girders, various joint treatment works need to be carried out, including wet joints.

[0003] In the existing bridge engineering, the installation and removal of wet joint formwork usually use a small winch for hoisting during the construction process. It is necessary to hoist the formwork in sequence, which requires repeated transfer of mechanical equipment. The construction speed is relatively slow and cumbersome, and when the formwork is removed and falls, the safety is low. Content of the Utility Model

[0004] The purpose of the utility model is to provide a simple device for installing wet joint formwork. By setting the formwork, main stringers, secondary stringers, wire ropes and towing ropes, the problems that in the existing bridge engineering, the installation and removal of wet joint formwork usually use a small winch for hoisting during the construction process, it is necessary to hoist the formwork in sequence, the construction speed is relatively slow and cumbersome, and when the formwork is removed and falls, the safety is low are solved.

[0005] To achieve the above purpose, the utility model is realized through the following technical solutions: A simple device for installing wet joint formwork, including a formwork, on the lower surface of which A bolts for fixing a plurality of main stringers are threaded, on the lower surfaces of the plurality of main stringers, B bolts for fixing a plurality of secondary stringers are threaded, and holes are opened on the lower surfaces of the plurality of secondary stringers, and tie rods are penetrated inside the holes;

[0006] Both ends of the tie rod are threadedly connected with hexagonal nuts, and a top rod is inserted at the top end of the tie rod;

[0007] Both ends of the top rod are fixedly connected with supports, and steel bars are welded between the top rods;

[0008] An anti-tilting rod is fixedly connected to the middle of the top rod, and a wire rope is penetrated through the middle of the anti-tilting rod.

[0009] Preferably, the bottom end of the wire rope is wound with a towing steel bar, both ends of the towing steel bar are fixedly connected to the middle parts of the lower surfaces of two main stringers, a lifting hole is opened at the middle part of the formwork and one of the main stringers, and the bottom end of the wire rope is inserted into the lifting hole.

[0010] Preferably, connecting rings are fixedly connected to both ends of the plurality of secondary stringers, and towing ropes are wound on the surfaces of the connecting rings.

[0011] The utility model provides a simple device for installing wet joint templates, which has the following beneficial effects:

[0012] During use, the steel wire pulling rope is inserted into the anti-tilting rod and the steel wire pulling rope is pulled upward to pull the template upward for installation, so that the template and the jack rod are easier to align. After alignment, the hexagonal nut at the top of the tension rod is removed and inserted into the jack rod to fix the template. After the concrete is poured, when the reinforcement of the next wet joint is installed, the traction rope is hooked to the position of another wet joint with a hook and fixed with the jack rod, and so on in a cycle, which greatly reduces the time consumed by personnel repeatedly hoisting the template through mechanical equipment. At the same time, it avoids the safety hazards caused by the falling of the template during demolition. The device has a simple structure, a small size, a light self-weight, a low production cost, a fast construction progress, a high installation efficiency and a high safety performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the drawings described below are only exemplary, and for those of ordinary skill in the art, without creative efforts, other implementation drawings can be obtained based on the provided drawings.

[0014] Figure 1 It is a schematic structural view of the present utility model;

[0015] Figure 2 It is a schematic bottom view of the structure of the present utility model;

[0016] Figure 3 It is a schematic bottom view of the structure of the template of the present utility model;

[0017] Figure 4 It is a schematic top view of the structure of the template of the present utility model.

[0018] Labels in the figure:

[0019] 1. Template; 2. Main rib plate; 3. Secondary rib; 4. Tension rod; 5. Hexagonal nut; 6. Jack rod; 7. Support; 8. Reinforcement; 9. Anti-tilting rod; 10. Steel wire pulling rope; 11. Traction reinforcement; 12. Hoisting hole; 13. Connecting ring; 14. Traction rope. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0020] Exemplary embodiments will be described in detail herein, and examples thereof are shown in the accompanying drawings. When the following description refers to the accompanying drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. On the contrary, they are merely examples of devices consistent with some aspects of the present disclosure as detailed in the appended claims.

[0021] The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without making creative efforts shall fall within the protection scope of the present utility model.

[0022] As Figure 1 、 Figure 2 、 Figure 3 and Figure 4 shown, this embodiment provides a simple device for wet joint formwork installation, including formwork 1. A bolts for fixing a plurality of main battens 2 are threadedly penetrated through the lower surface of formwork 1. B bolts for fixing a plurality of secondary battens 3 are threadedly penetrated through the lower surface of the plurality of main battens 2. A plurality of holes are provided on the lower surface of the plurality of secondary battens 3, and a tie rod 4 is penetrated through the inside of the holes. The formwork 1 is a composite plywood formwork with a thickness of 2 cm, a length of 189 cm, and a width of 93.1 cm. Through the main battens 2 and the secondary battens 3, the support for the formwork 1 is more comprehensive, reducing the uneven force on the formwork 1 during concrete pouring, resulting in tilting and bending, and improving the service life of the formwork 1.

[0023] Hexagonal nuts 5 are threadedly connected to both ends of the tie rod 4. A top rod 6 is inserted into the top end of the tie rod 4. The secondary battens 3 are supported by the tie rod 4 to ensure that the formwork 1 is uniformly stressed and stably supported during concrete pouring.

[0024] Supports 7 are fixedly connected to both ends of the top rod 6, and steel bars 8 are welded between the top rods 6.

[0025] An anti-tilting rod 9 is fixedly connected to the middle of the top rod 6. A steel wire rope 10 is penetrated through the middle of the anti-tilting rod 9. The steel wire rope 10 is a steel wire with a diameter of 8 mm. The formwork 1 is lifted by inserting the steel wire rope 10 into the anti-tilting rod 9, so that the position of the formwork 1 is below the top rod 6, facilitating the installation of the tie rod 4.

[0026] A traction steel bar 11 is wound around the bottom end of the steel wire rope 10. Both ends of the traction steel bar 11 are fixedly connected to the middle of the lower surface of the two main battens 2. A lifting hole 12 is provided at the middle of the formwork 1 and one of the main battens 2. The bottom end of the steel wire rope 10 is inserted into the inside of the lifting hole 12.

[0027] Both ends of multiple secondary battens 3 are fixedly connected with connecting rings 13. A towing rope 14 is wound around the surface of the connecting ring 13. The towing rope 14 is a nylon rope with a diameter of 2.5 cm. After the concrete is poured, after the reinforcement bars of the next wet joint are installed, the towing rope 14 can be hooked to the position of another wet joint by using a hook, so that there is no need for personnel to hoist the formwork 1 again, greatly improving the transfer efficiency of the formwork 1 between wet joints.

[0028] Specifically, when this simple device for wet joint formwork installation is in operation / use: When in use, the steel wire pull rope 10 is inserted into the anti-tilting rod 9 and the steel wire pull rope 10 is pulled upward to lift and install the formwork 1 upward, making it easier for the formwork 1 to align with the ejector rod 6. After alignment, the hexagon nut 5 at the top of the tension rod 4 is removed and inserted into the ejector rod 6 to fix the formwork 1. After the concrete is poured, after the reinforcement bars of the next wet joint are installed, the towing rope 14 is hooked to the position of another wet joint by using a hook and fixed by using the ejector rod 6. This process is repeated, greatly reducing the time consumed by personnel repeatedly hoisting the formwork 1 through mechanical equipment, and at the same time avoiding the safety hazards caused by the formwork 1 falling during demolition. The device has a simple structure, small size, light weight, low manufacturing cost, fast construction progress, high installation efficiency and high safety performance.

[0029] Although the embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A simple device for wet joint formwork installation, comprising a formwork (1), characterized in that: The lower surface of the template (1) is threadedly penetrated with A bolts for fixing a plurality of main rib plates (2). The lower surfaces of the plurality of main rib plates (2) are threadedly penetrated with B bolts for fixing a plurality of secondary ribs (3). The lower surfaces of the plurality of secondary ribs (3) are provided with holes, and a tension rod (4) is penetrated inside the holes; Both ends of the tension rod (4) are threadedly connected with hexagonal nuts (5), and a top rod (6) is inserted at the top end of the tension rod (4); Both ends of the top rod (6) are fixedly connected with supports (7), and steel bars (8) are welded between the top rods (6); An anti-tilting rod (9) is fixedly connected to the middle of the top rod (6), and a steel wire guy rope (10) is penetrated through the middle of the anti-tilting rod (9).

2. The simple device for wet joint formwork installation according to claim 1, characterized in that: The bottom end of the steel wire guy rope (10) is wound with a traction steel bar (11). Both ends of the traction steel bar (11) are fixedly connected to the middle parts of the lower surfaces of two main rib plates (2). A lifting hole (12) is provided at the middle of the template (1) and one of the main rib plates (2). The bottom end of the steel wire guy rope (10) is inserted into the lifting hole (12).

3. The simple device for wet joint formwork installation according to claim 1, characterized in that: Both ends of the plurality of secondary ribs (3) are fixedly connected with connecting rings (13), and a traction rope (14) is wound on the surface of the connecting rings (13).