Electric energy meter lead seal installation device

Through the combination of an electric rotating table and a push device, the power meter is easily installed in different locations, solving the limitations of existing devices on fixed-type meters, and improving installation efficiency and automation.

CN223092037UActive Publication Date: 2025-07-11SUZURAN ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422054486.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2025-07-11
Estimated Expiration
2034-08-23

AI Technical Summary

Technical Problem

The existing lead seal installation device of the power meter can only screw the fixed type of meter, which increases the limitations of use and reduces the convenience and operation efficiency of different lead seals at different locations.

Method used

A lead seal installation device for the electric energy meter including an electric rotating table, a pushing device, a limiting plate and a adjustment device is designed. The electric energy meter is driven to rotate horizontally through the electric rotating table, and the automatic positioning and movement of the electric energy meter is realized by using the pushing device and a limiting plate, improving the convenience and efficiency of the lead seal installation at different locations.

Benefits of technology

It improves the operation convenience of lead seals at different locations of the power meter, reduces the limitations of use, and improves the installation efficiency of lead seals of the power meter and the convenience of automatic mobile transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223092037U_ABST
    Figure CN223092037U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electric energy meter lead seal installation, in particular to an electric energy meter lead seal installation device, which improves the operation convenience of installing lead seals at different positions of an electric energy meter, reduces the use limitation, improves the use functionality and improves the electric energy meter lead seal installation efficiency. Comprising a base and an electric rotating table installed at the top end of the base. The device comprises a base, an electric rotating table, an adjusting device, a moving device, a pushing device, an operation table, two first limiting plates and two second limiting plates, the operation table is arranged on the side of the base, the top end of the operation table is flush with the top end of the electric rotating table, and the two first limiting plates are oppositely installed at the top end of the electric rotating table through the moving device; the two sets of second limiting plates are oppositely installed on the operation table through the adjusting device, and the pushing device is arranged on the operation table and used for pushing and conveying the electric energy meters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of the installation of electric energy meter seals, in particular to an electric energy meter seal installation device. Background Art

[0002] As an important tool for ensuring the safety of electric energy meters, the design and development of electric energy meter seal installation devices are of great significance for improving the accuracy and safety of power metering.

[0003] Currently, when installing the seals of electric energy meters, for example, in the patent with the authorization announcement number of CN214068168U in the prior art, this utility model discloses a seal machine for intelligent electric meters, including a conveyor belt. The middle part of the front side of the conveyor belt is fixedly connected with a material rack. The top of the material rack is fixedly connected with a material placing seat. A seal mechanism is fixedly connected between the material rack and the conveyor belt and on the left side of the material placing seat. Three vibrating trays are fixedly installed on the top of the material rack. The material placing seat includes a base. The top of the base is fixedly connected with a support plate through a connecting seat. The top of the support plate is fixedly connected with three material platforms. The seal mechanism includes two columns.

[0004] However, it is found during the use of this device that this device can only perform screw installation on electric meters of a fixed model, increasing the limitations in use and reducing the convenience of seal installation operations at different positions. Summary of the Utility Model

[0005] To solve the above technical problems, the utility model provides an electric energy meter seal installation device that improves the convenience of seal installation at different positions of the electric energy meter, reduces the limitations in use, improves the functional performance, and improves the installation efficiency of the electric energy meter seals.

[0006] An installation device for the lead seal of an electric energy meter of the present utility model comprises a base and an electric rotating table, and the electric rotating table is installed at the top end of the base; it further comprises an adjusting device, a moving device, a pushing device, an operating table, two groups of first limiting plates and two groups of second limiting plates. The operating table is arranged on the side of the base, and the top end of the operating table is flush with the top end of the electric rotating table. The two groups of first limiting plates are oppositely installed at the top end of the electric rotating table through the moving device, the two groups of second limiting plates are oppositely installed on the operating table through the adjusting device, and the pushing device is arranged on the operating table and is used for pushing and conveying the electric energy meter; place the electric energy meter between the two groups of second limiting plates at the top end of the operating table, and then the operator installs the protective cover of the electric energy meter on the operating table. After the installation of the electric energy meter is completed, the electric energy meter is pushed and conveyed to between the two groups of first limiting plates at the top end of the electric rotating table through the pushing device, so that the lead seal of the electric energy meter is installed on the electric rotating table. The electric rotating table drives the electric energy meter to rotate horizontally, thereby improving the operation convenience of installing lead seals at different positions of the electric energy meter, reducing the use limitations, and improving the use functionality of the device. After the pushing device pushes the electric energy meter onto the electric rotating table, place the next electric energy meter to be installed on the operating table. After the lead seal of the electric energy meter on the electric rotating table is completed, the electric energy meter on the operating table is pushed onto the electric rotating table through the pushing device, so that the electric energy meter on the operating table pushes the electric energy meter on the electric rotating table to continue to move and be conveyed to the next working station, improving the convenience of automatically moving and positioning the electric energy meter and the lead seal installation efficiency of the electric energy meter.

[0007] Preferably, the pushing device comprises a reset device, a housing, a cross arm, a first rack, an incomplete gear, a motor and a push plate. The housing is installed at the top end of the operating table, the cross arm is horizontally slidably installed on the housing, the first rack is installed on the outer side wall of the cross arm, the incomplete gear is rotatably installed on the inner side wall of the housing, the incomplete gear meshes with the first rack, the motor is installed on the outer side wall of the housing, the output end of the motor is connected to the incomplete gear, the push plate is installed at the end of the cross arm, and the reset device is installed on the cross arm and is used for driving the cross arm to move and reset; the motor drives the incomplete gear to rotate, so that the incomplete gear drives the cross arm to move horizontally through meshing with the first rack. After the cross arm moves, the electric energy meter is pushed through the push plate for conveying, improving the convenience of automatically positioning and conveying the electric energy meter. After the incomplete gear stops meshing with the first rack, the cross arm moves reversely and resets through the reset device, thereby facilitating the next use and improving the use convenience of the device.

[0008] Preferably, it further includes a second rack, a rotary damper and a spur gear. The second rack is installed on the outer side wall of the cross arm, the rotary damper is installed on the outer side wall of the housing, the spur gear is installed on the input end of the rotary damper, and the spur gear meshes with the second rack; when the cross arm moves, it drives the second rack to move, and after the second rack moves, it drives the spur gear to rotate. The rotary damper provides resistance to the rotation of the spur gear, so that the cross arm decelerates when moving in the reverse reset direction, improving the uniform speed effect of the cross arm movement and the use stability of the cross arm.

[0009] Preferably, the reset device includes a first guide rod and a spring. The end of the first guide rod is installed on the outer side of the cross arm, and the first guide rod slides through the inside of the housing. The spring is installed on the outer side wall of the first guide rod in a matching manner; when the cross arm pushes and conveys the electric energy meter through the push plate, the spring is compressed after the cross arm moves. When the first rack stops meshing with the incomplete gear, the spring pushes the cross arm to move in the reverse direction to reset, thereby improving the convenience of the automatic reset of the cross arm, reducing the moving energy consumption of the cross arm, and improving the use stability of the spring by setting the first guide rod.

[0010] Preferably, the adjusting device includes two groups of first cylinders and multiple groups of second guide rods. The two groups of first cylinders are both installed on the top of the operating table. The moving ends of the two groups of first cylinders are respectively connected to the outer side walls of the two groups of second limit plates. The multiple groups of second guide rods are all installed on the outer side walls of the two groups of second limit plates, and the multiple groups of second guide rods are all slidably installed on the operating table; the two groups of first cylinders drive the two groups of second limit plates to move towards each other, improving the convenience of limiting electric energy meters of different models by the two groups of second limit plates.

[0011] Preferably, the moving device includes two groups of second cylinders. The two groups of second cylinders are both installed on the top of the electric rotary table. The moving ends of the two groups of second cylinders are respectively connected to the outer side walls of the two groups of first limit plates; the two groups of second cylinders drive the two groups of first limit plates to move, improving the convenience of limiting the electric energy meter on the electric rotary table by the two groups of first limit plates.

[0012] Preferably, it further includes an electric conveyor belt. The electric conveyor belt is arranged on the side of the electric rotary table; the electric energy meter that continues to move and convey from the electric rotary table moves onto the electric conveyor belt, and the electric conveyor belt rotates to continue conveying the lead-sealed electric energy meter, improving the convenience of the automatic conveying of the electric energy meter.

[0013] Compared with the prior art, the beneficial effects of the present utility model are as follows: Place the electric energy meter between two groups of second limit plates at the top of the operation table. Then, the operator installs the protective cover of the electric energy meter on the operation table. After the installation of the electric energy meter is completed, the electric energy meter is pushed and conveyed to between two groups of first limit plates at the top of the electric rotary table through the pushing device, so that the electric energy meter is installed with a lead seal on the electric rotary table. The electric rotary table drives the electric energy meter to rotate horizontally, thereby improving the operational convenience of installing lead seals at different positions of the electric energy meter, reducing the usage limitations, and improving the functional performance of the device. After the pushing device pushes the electric energy meter onto the electric rotary table, place the next electric energy meter to be installed on the operation table. After the lead seal of the electric energy meter on the electric rotary table is completed, push the electric energy meter on the operation table onto the electric rotary table through the pushing device, so that the electric energy meter on the operation table pushes the electric energy meter on the electric rotary table to continue moving and conveying to the next working station, improving the convenience of automatically moving and conveying the electric energy meter and positioning it, and improving the lead seal installation efficiency of the electric energy meter. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 is an isometric structural schematic diagram of the present utility model;

[0015] Figure 2 is an isometric partial structural schematic diagram of the connection between the cross arm and the first rack, etc.;

[0016] Figure 3 is an isometric partial structural schematic diagram of the connection between the second limit plate and the first cylinder, etc.;

[0017] Figure 4 is an isometric partial structural schematic diagram of the connection between the first limit plate and the second cylinder, etc.;

[0018] Figure 5 is an isometric structural schematic diagram of the connection between the operation table and the housing, etc.

[0019] Reference numerals in the drawings: 1, base; 2, electric rotary table; 3, operation table; 4, first limit plate; 5, second limit plate; 6, housing; 7, cross arm; 8, first rack; 9, incomplete gear; 10, motor; 11, push plate; 12, second rack; 13, rotary damper; 14, spur gear; 15, first guide rod; 16, spring; 17, first cylinder; 18, second guide rod; 19, second cylinder; 20, electric conveyor belt. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0020] For the convenience of understanding the present utility model, the present utility model will be described more comprehensively below with reference to the relevant drawings. The present utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, these embodiments are provided to make the disclosure of the present utility model more thorough and comprehensive.

[0021] Example 1

[0022] As Figure 1 shown, a lead seal installation device for an electric energy meter of the present utility model includes a base 1 and an electric rotating table 2, and the electric rotating table 2 is installed at the top of the base 1; it further includes an adjusting device, a moving device, a pushing device, an operating table 3, two groups of first limiting plates 4 and two groups of second limiting plates 5. The operating table 3 is arranged on the side of the base 1, and the top of the operating table 3 is flush with the top of the electric rotating table 2. The two groups of first limiting plates 4 are oppositely installed on the top of the electric rotating table 2 through the moving device, and the two groups of second limiting plates 5 are oppositely installed on the operating table 3 through the adjusting device. The pushing device is arranged on the operating table 3, and the pushing device is used to push and convey the electric energy meter;

[0023] As Figure 2 shown, the pushing device includes a reset device, a housing 6, a cross arm 7, a first rack 8, an incomplete gear 9, a motor 10 and a push plate 11. The housing 6 is installed at the top of the operating table 3. The cross arm 7 is horizontally slidably installed on the housing 6. The first rack 8 is installed on the outer side wall of the cross arm 7. The incomplete gear 9 is rotatably installed on the inner side wall of the housing 6. The incomplete gear 9 meshes with the first rack 8. The motor 10 is installed on the outer side wall of the housing 6, and the output end of the motor 10 is connected to the incomplete gear 9. The push plate 11 is installed at the end of the cross arm 7, and the reset device is installed on the cross arm 7. The reset device is used to drive the cross arm 7 to move and reset;

[0024] In this embodiment, the electric energy meter is placed between the two groups of second limiting plates 5 at the top of the operating table 3. Then, the operator installs the protective cover of the electric energy meter on the operating table 3. After the installation of the electric energy meter is completed, the electric energy meter is pushed and conveyed to between the two groups of first limiting plates 4 at the top of the electric rotating table 2 through the pushing device, so that the lead seal is installed on the electric rotating table 2. The electric rotating table 2 drives the electric energy meter to rotate horizontally, thereby improving the operation convenience of installing lead seals at different positions of the electric energy meter, reducing the use limitations, and improving the use functionality of the device. After the pushing device pushes the electric energy meter onto the electric rotating table 2, the next electric energy meter to be installed is placed on the operating table 3. After the lead seal of the electric energy meter on the electric rotating table 2 is completed, the electric energy meter on the operating table 3 is pushed onto the electric rotating table 2 through the pushing device, so that the electric energy meter on the operating table 3 pushes the electric energy meter on the electric rotating table 2 to continue to move and convey to the next working station, improving the convenience of automatically moving and positioning the electric energy meter and the lead seal installation efficiency of the electric energy meter.

[0025] Example 2

[0026] On the basis of Example 1, as Figure 2As shown, it further includes a second rack 12, a rotary damper 13 and a spur gear 14. The second rack 12 is installed on the outer side wall of the cross arm 7, the rotary damper 13 is installed on the outer side wall of the housing 6, the spur gear 14 is installed on the input end of the rotary damper 13, and the spur gear 14 meshes with the second rack 12;

[0027] As Figure 2 shown, the reset device includes a first guide rod 15 and a spring 16. The end of the first guide rod 15 is installed on the outer side of the cross arm 7, and the first guide rod 15 slides through the inside of the housing 6. The spring 16 is cooperatively installed on the outer side wall of the first guide rod 15;

[0028] As Figure 3 shown, the adjusting device includes two groups of first cylinders 17 and multiple groups of second guide rods 18. The two groups of first cylinders 17 are both installed at the top of the operating table 3. The moving ends of the two groups of first cylinders 17 are respectively connected to the outer side walls of the two groups of second limiting plates 5. The multiple groups of second guide rods 18 are all installed on the outer side walls of the two groups of second limiting plates 5, and the multiple groups of second guide rods 18 are all slidably installed on the operating table 3;

[0029] As Figure 4 shown, the moving device includes two groups of second cylinders 19. The two groups of second cylinders 19 are both installed at the top of the electric rotary table 2. The moving ends of the two groups of second cylinders 19 are respectively connected to the outer side walls of the two groups of first limiting plates 4;

[0030] As Figure 1 shown, it further includes an electric conveyor belt 20. The electric conveyor belt 20 is arranged on the side of the electric rotary table 2;

[0031] In this embodiment, the motor 10 drives the incomplete gear 9 to rotate, so that the incomplete gear 9 drives the cross arm 7 to move horizontally through the meshing with the first rack 8. After the cross arm 7 moves, it pushes the electric energy meter for conveying through the push plate 11, improving the convenience of automatically positioning and conveying the electric energy meter. When the incomplete gear 9 stops meshing with the first rack 8, the cross arm 7 moves backward and resets through the reset device, thus facilitating the next use and improving the usability of the device. When the cross arm 7 moves, it drives the second rack 12 to move. After the second rack 12 moves, it drives the spur gear 14 to rotate. The rotary damper 13 provides resistance to the rotation of the spur gear 14, so that the cross arm 7 decelerates when moving backward and resetting, improving the uniform motion effect of the cross arm 7 and the use stability of the cross arm 7.

[0032] An electric energy meter lead seal installation device of the present utility model, when working, places the electric energy meter between two groups of second limit plates 5 at the top of the operation table 3. Then, the operator installs the protective cover of the electric energy meter on the operation table 3. After the installation of the electric energy meter is completed, the electric energy meter is pushed and conveyed to between two groups of first limit plates 4 at the top of the electric rotating table 2 through the pushing device, so that the lead seal of the electric energy meter is installed on the electric rotating table 2. The electric rotating table 2 drives the electric energy meter to rotate horizontally. After the pushing device pushes the electric energy meter onto the electric rotating table 2, the next electric energy meter to be installed is placed on the operation table 3. After the lead seal of the electric energy meter on the electric rotating table 2 is completed, the electric energy meter on the operation table 3 is pushed onto the electric rotating table 2 through the pushing device, so that the electric energy meter on the operation table 3 pushes the electric energy meter on the electric rotating table 2 to continue moving and conveying to the next working station.

[0033] The electric rotating table 2, the motor 10, the rotary damper 13, the first cylinder 17, the second cylinder 19 and the electric conveyor belt 20 of the electric energy meter lead seal installation device of the present utility model are purchased on the market. Those skilled in the industry only need to install and operate according to the attached operation manuals, without the need for creative labor from those skilled in the art.

[0034] The above are only the preferred embodiments of the present utility model. It should be noted that for those of ordinary skill in the art in this technical field, without departing from the technical principle of the present utility model, several improvements and modifications can be made, and these improvements and modifications should also be regarded as the protection scope of the present utility model.

Claims

1. An electric energy meter lead seal installation device, comprising a base (1) and an electric rotating table (2), the electric rotating table (2) being installed at the top of the base (1); characterized in that, It further includes an adjusting device, a moving device, a pushing device, an operating platform (3), two groups of first limiting plates (4) and two groups of second limiting plates (5). The operating platform (3) is arranged on the side of the base (1), and the top of the operating platform (3) is flush with the top of the electric rotating table (2). The two groups of first limiting plates (4) are oppositely installed on the top of the electric rotating table (2) through the moving device. The two groups of second limiting plates (5) are oppositely installed on the operating platform (3) through the adjusting device. The pushing device is arranged on the operating platform (3), and the pushing device is used to push and convey the electric energy meter.

2. The lead seal installation device for an electric energy meter according to claim 1, characterized in that, The pushing device includes a reset device, a housing (6), a cross arm (7), a first rack (8), an incomplete gear (9), a motor (10) and a push plate (11). The housing (6) is installed on the top of the operating platform (3). The cross arm (7) is horizontally slidably installed on the housing (6). The first rack (8) is installed on the outer side wall of the cross arm (7). The incomplete gear (9) is rotatably installed on the inner side wall of the housing (6). The incomplete gear (9) meshes with the first rack (8). The motor (10) is installed on the outer side wall of the housing (6). The output end of the motor (10) is connected to the incomplete gear (9). The push plate (11) is installed at the end of the cross arm (7). The reset device is installed on the cross arm (7), and the reset device is used to drive the cross arm (7) to move back to its original position.

3. The lead seal installation device for an electric energy meter according to claim 2, wherein, It further includes a second rack (12), a rotary damper (13) and a spur gear (14). The second rack (12) is installed on the outer side wall of the cross arm (7). The rotary damper (13) is installed on the outer side wall of the housing (6). The spur gear (14) is installed on the input end of the rotary damper (13), and the spur gear (14) meshes with the second rack (12).

4. The electric energy meter lead seal installation device according to claim 2, wherein, The reset device includes a first guide rod (15) and a spring (16). The end of the first guide rod (15) is installed on the outer side of the cross arm (7), and the first guide rod (15) slidably passes through the inside of the housing (6). The spring (16) is cooperatively installed on the outer side wall of the first guide rod (15).

5. The lead seal installation device for an electric energy meter according to claim 1, characterized in that, The adjusting device includes two groups of first cylinders (17) and multiple groups of second guide rods (18). The two groups of first cylinders (17) are both installed on the top of the operating platform (3). The moving ends of the two groups of first cylinders (17) are respectively connected to the outer side walls of the two groups of second limiting plates (5). The multiple groups of second guide rods (18) are all installed on the outer side walls of the two groups of second limiting plates (5), and the multiple groups of second guide rods (18) are all slidably installed on the operating platform (3).

6. The lead seal installation device for an electric energy meter according to claim 1, characterized in that, The moving device includes two groups of second cylinders (19). The two groups of second cylinders (19) are both installed on the top of the electric rotating table (2). The moving ends of the two groups of second cylinders (19) are respectively connected to the outer side walls of the two groups of first limiting plates (4).

7. The lead seal installation device for an electric energy meter according to claim 1, characterized in that, It further includes an electric conveyor belt (20). The electric conveyor belt (20) is arranged on the side of the electric rotating table (2).