Device for improving pavement core drilling and pit filling quality

By designing a device that includes a base, a vertical guide rod and an overall moving structure, the randomness and safety risks of existing pavement drilling and pit repair technology are solved, and a higher quality and safer pit repair effect is achieved.

CN223134934UActive Publication Date: 2025-07-22GANSU ROAD & BRIDGE ENG TESTING CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202422445711.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2025-07-22
Estimated Expiration
2034-10-10

AI Technical Summary

Technical Problem

The existing pavement core drilling and pit repair technology has great randomness, great quality differences, high safety risks, which affect the effectiveness and life of the road.

Method used

A device including a base, a vertical guide rod, an integral moving structure and a moving rod is designed. Through the up and down movement of the integral moving structure and the coordination of the hammer head, standardized and professional pit filling operations are achieved.

Benefits of technology

The quality of pit repairs has been improved, the later quality diseases have been reduced, safety risks have been reduced, and the detection efficiency and operational specialization have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223134934U_ABST
    Figure CN223134934U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of pavement repairing equipment, in particular to a device for improving pavement core drilling and pit repairing quality. The device is provided with a base (1), the middle of the base (1) extends upwards to form a vertical guide rod (3), and an integral moving structure (4) capable of moving up and down along the vertical guide rod (3) is arranged on the vertical guide rod (3); a hole for the vertical guide rod (3) to pass through is formed in the middle of the integral moving structure (4); an impact surface is arranged below the base (1); and more than one moving rod (6) is arranged on the side of the integral moving structure (4). The pit filling quality is improved, later-stage quality diseases are reduced, and the quality defect of damage detection is made up; the harm to the body is reduced, and the safety risk is reduced; the detection efficiency is improved, and more specialization and standardization are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of road surface repair equipment, in particular to a device for improving the quality of road surface core drilling and pit repairing. Background Art

[0002] At present, the most common method for road core drilling and pothole filling is hand hammer filling, which has large random variations, large differences in pothole filling quality, and high and low surfaces. There are safety risks during use and quality hazards to the road surface, affecting the use effect and lifespan of the highway.

[0003] On September 22, 2024, with "pot filling and pavement and repair and pole" as the abstract keywords, and checking the option to allow synonym expansion, a search was conducted in the Chinese Patent Publication Database, and the following were found: CN213681627U-A new all-in-one machine for filling potholes and repairing pavement diseases; CN112376376A-A asphalt pavement repair device for highway maintenance and its use method; CN211368320U-Road repair device; CN114657857A-A steel plate truck for repairing potholes in asphalt pavement and its use method; CN202492789U-A bamboo hat-type microwave heating repair machine cover for asphalt pavement; CN211547244U-An asphalt paving device for convenient road repair; CN111778829A-A method for asphalt highway construction; CN115679782A-A method and equipment for repairing potholes with prefabricated blocks in asphalt pavement.

[0004] The novel integrated machine for filling potholes and repairing road surface defects disclosed in CN213681627U has an overly complex structure and cannot conveniently carry out road surface repair.

[0005] On September 22, 2024, an abstract search for "pothole repair and pavement and repair and rod" on CNKI found: "Highway pavement pothole repair technology and application practice" - Yuan Lei; "Research on asphalt pavement pothole repair based on interface mechanical response" - Hou Yun; Dong Yuanshuai; Zhang Yanhong; Tian Jialei; "Asphalt concrete pavement pothole repair construction method and quality requirements" - Wang Qizheng; "Using cold process to maintain asphalt pavement" - Zhang Jiancheng; "Research on cold patching materials for asphalt pavement potholes" - Hu Dan; "Application of coarse cloth patching technology in winter pothole repair" - Wang Hongfang; "Research and practice of asphalt pavement pothole repair technology in winter" - Wang Yuliang;

[0006] "Tips for Repairing Concrete Pavement" - Zhang Jinchang; "Two Technical Measures for Maintaining Pavement" - Yu Yongchun; "A Brief Introduction to the Experiment of Using Cationic Emulsified Asphalt to Maintain Asphalt Pavement in Low Temperature Rainy Season" - Zeng Kuntian; "Some Experiences in Asphalt Surface Treatment on Old Black Pavement" - Sun Kuizeng.

[0007] Completely different from the concept of this patent. Summary of the Utility Model

[0008] Purpose of the utility model: To provide a device for improving the quality of core drilling and pothole filling on the road surface with better effects. The specific purpose can be seen in the multiple substantial technical effects in the specific implementation part.

[0009] To achieve the above purpose, the utility model adopts the following technical solutions:

[0010] A device for improving the quality of core drilling and pothole filling on the road surface, characterized in that

[0011] The device is provided with a base 1. A vertical guide rod 3 protrudes upward from the middle of the base 1. An overall moving structure 4 capable of moving up and down along the vertical guide rod 3 is arranged on the vertical guide rod 3; there is a hole in the middle of the overall moving structure 4 for passing through the vertical guide rod 3;

[0012] An impact surface is arranged below the base 1;

[0013] One or more moving rods 6 are arranged on the side of the overall moving structure 4.

[0014] A further technical solution of the utility model is that a lower hammer head 2 is arranged below the overall moving structure 4.

[0015] A further technical solution of the utility model is that an upper fixed pulley 9 is arranged at the uppermost part of the vertical guide rod 3. A steel wire 8 is fixed on the moving rod 6. After passing through the upper fixed pulley 9, the steel wires 8 are gathered into a pulling steel bar strand 11. A foot stepping structure 10 is arranged below the pulling steel bar strand 11.

[0016] A further technical solution of the utility model is that the foot stepping structure 10 is a frame-like structure that can be stepped on by the foot and pulled downward.

[0017] A further technical solution of the utility model is that the moving rod 6 includes two.

[0018] A further technical solution of the utility model is that an upper limiting structure block 7 is arranged above the vertical guide rod 3. The upper limiting structure block 7 can limit the rising height of the overall moving structure 4.

[0019] The utility model adopting the above technical solutions has the following beneficial effects compared with the prior art: It improves the pothole filling quality, reduces the later quality diseases, and makes up for the quality defects in damage detection; it reduces the harm to the body and lowers the safety risk; it improves the detection efficiency and is more professional and standardized.

[0020] For the middle and lower layers, fill them with the same type of structural layer. For the pit with a depth of 18 cm in the upper layer, fill it in three layers. Each layer of filler is backfilled with the same type of hot mixture of the upper layer. Two people cooperate in the operation to let the overall moving structure 4 fall freely, evenly receive force, and the number of hammer blows should be 15 times. Use fine materials to fill the voids in the surface 1 cm, and gently tamp the surface with the overall moving structure 4 to make it flat and dense, so as to achieve the same quality effect as on-site paving. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to further illustrate the present invention, the following will be further described in conjunction with the drawings:

[0022] Figure 1 It is a structural diagram of the basic embodiment of this patent;

[0023] Figure 2 It is a structural diagram of the improved embodiment of this patent;

[0024] Wherein: 1. Base; 2. Lower hammer head; 3. Vertical guide rod; 4. Overall moving structure; 5. Middle hole; 6. Moving rod; 7. Upper limiting structure block; 8. Steel wire; 9. Upper fixed pulley; 10. Foot stepping structure; 11. Pulling steel wire strands. DETAILED DESCRIPTION OF THE INVENTION

[0025] The following will further clarify the present invention in conjunction with the drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and not to limit the scope of the present invention. In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", "top", "bottom", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, unless otherwise clearly defined and limited, the terms "installation", "connection", and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the internal communication of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] It should be noted that in this text, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprising", "including" or any other variant thereof are intended to cover non-exclusive inclusion, such that a process, method, article or device comprising a series of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article or device.

[0027] This patent provides multiple parallel solutions. The different expressions belong to improved solutions or parallel solutions based on the basic solution. Each solution has its own unique features. In addition, the technical features involved in different embodiments of the present utility model described below can be combined with each other as long as they do not conflict with each other. The fixing method not described in the text can be any one of screw fixing, bolt fixing or glue bonding.

[0028] Embodiment 1: Combining all the drawings; A device for improving the quality of core drilling and pothole filling on the road surface, characterized in that

[0029] The device is provided with a base 1. A vertical guide rod 3 protrudes upward from the middle of the base 1. An overall moving structure 4 capable of moving up and down along the vertical guide rod 3 is arranged on the vertical guide rod 3; There is a hole in the middle of the overall moving structure 4 for passing through the vertical guide rod 3;

[0030] An impact surface is arranged below the base 1;

[0031] One or more moving rods 6 are arranged on the side of the overall moving structure 4. The substantial technical effects and their implementation processes of the technical solution here are as follows:

[0032] On the basis of the original hand hammer pothole filling, a new simple tool is reformed to improve the pothole filling quality and make it more standardized and normalized.

[0033] 1. Specific structure: Abandon the use of hand hammer pothole filling tools and process and improve the light dynamic penetrometer. It mainly consists of a 10KG hammer, that is, the overall moving structure 4, a 103cm long core rod, that is, the vertical guide rod 3, a 10cm diameter and 2cm thick iron support welded at the bottom, that is, the base 1. The drop height of the overall moving structure 4 is 60cm, and the handle grip, that is, the length of the moving rod 6 is 10cm, etc. The structure is simple and the operation is convenient. From point to surface and from bottom to top, it effectively controls the overall quality of road surface pothole filling.

[0034] Beneficial effects: improve the quality of pothole repair, reduce late-stage quality diseases, and make up for the quality defects in damage detection; reduce physical injuries and lower safety risks; improve detection efficiency, making it more professional and standardized.

[0035] For the middle and lower layers, fill them with the same type of structural layer. For potholes with a depth of 18 cm in the upper layer, fill them in three layers. Each layer of filler is backfilled with the same type of hot mixture in the upper layer. Two people cooperate in the operation. Let the overall moving structure 4 fall freely, evenly receive force, and the number of hammer blows should be 15 times. Fill the surface 1 cm with fine materials to fill the gaps, and gently tamp the surface with the overall moving structure 4 to make it flat and dense, so as to achieve the same quality effect as on-site paving.

[0036] Embodiment 2: As a further improvable solution, a parallel solution, or an alternative independent solution, a lower hammer head 2 is arranged below the overall moving structure 4. The substantial technical effects achieved by the technical solution here and its implementation process are as follows: The lower hammer head 2 is made of impact-resistant material, so the impact effect is better.

[0037] Embodiment 3: As a further improvable solution, a parallel solution, or an alternative independent solution, an upper fixed pulley 9 is arranged at the top of the vertical guide rod 3. A steel wire 8 is fixed on the moving rod 6. After the steel wire 8 passes through the upper fixed pulley 9, it converges into a pulling steel wire strand 11, and a foot-operated structure 10 is arranged below the pulling steel wire strand 11. The substantial technical effects achieved by the technical solution here and its implementation process are as follows: In addition to the hand-held lifting structure in Embodiment 1, this embodiment can adopt a foot-operated method without bending down for repair.

[0038] Embodiment 4: As a further improvable solution, a parallel solution, or an alternative independent solution, the foot-operated structure 10 is a frame structure that can be pulled downward by stepping on it. The substantial technical effects achieved by the technical solution here and its implementation process are as follows: It is convenient for stepping on.

[0039] Embodiment 5: As a further improvable solution, a parallel solution, or an alternative independent solution, there are two moving rods 6. The substantial technical effects achieved by the technical solution here and its implementation process are as follows: It is convenient to pull and thus achieve road surface repair.

[0040] Embodiment 6: As a further improvable solution, a parallel solution, or an alternative independent solution, an upper limiting structural block 7 is arranged above the vertical guide rod 3, and the upper limiting structural block 7 can limit the rising height of the overall moving structure 4. The substantial technical effects achieved by the technical solution here and its implementation process are as follows: Therefore, the rising height of the overall lifting can be limited above.

[0041] Innovatively, the above effects exist independently, and the combination of the above results can also be achieved with a set of structures.

[0042] It should be noted that the multiple solutions provided by this patent include their own basic solutions, which are independent of each other and do not restrict each other. However, they can also be combined with each other without conflict to achieve multiple effects simultaneously.

[0043] The above shows and describes the basic principles, main features and advantages of the present utility model. Those skilled in the art should understand that the present utility model is not limited by the above embodiments. What is described in the above embodiments and the specification only illustrates the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model will have various changes and improvements, and these changes and improvements all fall within the scope of the claimed protection.

Claims

1. A device for improving the quality of core drilling and pothole filling on the road surface, characterized in that the device is provided with a base (1), a vertical guide rod (3) extends upward from the middle of the base (1), and an overall moving structure (4) capable of moving up and down along the vertical guide rod (3) is arranged on the vertical guide rod (3); there is a hole in the middle of the overall moving structure (4) for passing through the vertical guide rod (3); an impact surface is arranged below the base (1); more than one moving rod (6) is arranged on the side of the overall moving structure (4).

2. The device for improving the quality of core drilling and pothole filling on the road surface according to claim 1, characterized in that a lower hammer head (2) is arranged below the overall moving structure (4).

3. The device for improving the quality of core drilling and pothole filling on the road surface according to claim 1, characterized in that, an upper fixed pulley (9) is arranged at the uppermost part of the vertical guide rod (3), a steel wire (8) is fixed on the moving rod (6), the steel wire (8) passes through the upper fixed pulley (9) and then converges into a pulling steel wire strand (11), and a foot stepping structure (10) is arranged below the pulling steel wire strand (11).

4. The device for improving the quality of core drilling and pothole filling on the road surface according to claim 3, characterized in that, The foot stepping structure (10) is a frame-like structure that can be stepped on by the foot and pulled downward.

5. The device for improving the quality of core drilling and pothole filling on the road surface according to claim 3, characterized in that, There are two moving rods (6).

6. The device for improving the quality of core drilling and pothole filling on the road surface according to claim 3, characterized in that, an upper limiting structure block (7) is arranged above the vertical guide rod (3), the upper limiting structure block (7) can limit the rising height of the overall moving structure (4).

Citation Information

Patent Citations

  • Asphalt highway construction method

    CN111778829A

  • Asphalt pavement repairing device for road maintenance and using method thereof

    CN112376376A

  • Asphalt pavement pit slot repairing steel plate vehicle and using method thereof

    CN114657857A

  • Method and equipment for repairing pits and slots in asphalt pavement precast blocks

    CN115679782A

  • Cloak-type microwave heating and repairing hood for bituminous pavement

    CN202492789U