Closed filling and pouring device for filling well bottom and well outer side in deep well construction
Through the grouting device of double-layer casing and multiple conduits, the safety hazards of the connection between water bodies and caves during construction around the water bodies are solved, and the balance between construction safety and ecological environment protection is achieved.
Patent Information
- Application Number
- CN202421922476.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2025-07-25
- Estimated Expiration
- 2034-08-08
AI Technical Summary
Under the complex geological conditions around the water body, it is difficult for existing construction devices to effectively prevent the water body from being penetrated with the cave, which poses safety hazards and has a great impact on the ecological environment.
A double-layer casing structure is adopted, with multiple conduits installed on the outside of the inner casing and connected to the grouting device. The bottom of the well and the outside of the well are closed by the casing grouting to form a sealing filling layer to block the leakage path.
It improves construction safety and well pipe stability, avoids the connection between water bodies and caves, reduces the impact on the ecological environment of the water body, and ensures construction accuracy and safety.
Smart Images

Figure CN223152098U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, and particularly relates to a filling and sealing perfusion device for the bottom and the outer side of a deep well during construction. Background Art
[0002] With the enhancement of environmental protection awareness, green building and green construction have become the development direction of building construction. In some construction projects near water bodies, due to the complexity of geological conditions, some soluble rocks may appear. During construction, it may be necessary to pass through some solution grooves, solution troughs and small karst caves. At this time, measures must be taken to prevent the water body from communicating with the karst cave and eliminate potential safety hazards. At the same time, construction in this geological environment will have some adverse effects on the water ecological environment. Therefore, it is necessary to develop a construction device that can adapt to this construction environment, improve safety indicators and reduce the impact on the construction and ecological environment. Content of the Utility Model
[0003] The purpose of the utility model is to provide a construction device that can adapt to the above construction environment, has a higher safety guarantee level and has little impact on the water ecological environment.
[0004] To achieve the above purpose, the technical solution adopted by the utility model is: a filling and sealing perfusion device for the bottom and the outer side of a deep well during construction, including an inner casing, and a conduit is fixedly installed on the outer side wall of the inner casing through a positioning device.
[0005] Further, it also includes an outer casing, and there is a certain distance gap between the outer casing and the inner casing according to construction needs.
[0006] Further, the positioning device is a positioning hoop.
[0007] Further, the number of the conduits > 1, and they are evenly distributed on the outer side wall of the inner casing.
[0008] Further, it also includes a grouting device connected to the conduit.
[0009] Further, it also includes a funnel, the lower end of the funnel is connected with a central conduit, and the central conduit is located inside the inner casing.
[0010] The beneficial technical effects of the utility model are:
[0011] (1) Through the setting of the double-layer casing and the filling and sealing measures for the bottom and the outer side of the well pipe, the leakage path between the well pipe and the soil body is blocked, avoiding the communication between the water body and the karst cave during construction. The outer casing can be used as a support wall during perfusion, and grouting is carried out through the conduit between the inner and outer casings, ensuring the construction safety and also avoiding the impact on the water ecological environment;
[0012] (2) By setting multiple multi-point sidewall conduits, the utility model can precisely control the grouting process, ensuring the safety and accuracy of construction.
[0013] (3) The setting of the utility model can fill the sealing layer during construction, thereby enhancing the sealing and stability of the well pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the following-described drawings are only some embodiments of the present utility model. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.
[0015] Figure 1 is a schematic structural diagram of Embodiment 1 of the present utility model;
[0016] Figure 2 is a schematic structural diagram of Embodiment 2 of the present utility model;
[0017] Figure 3 is a schematic structural diagram of Embodiment 3 of the present utility model;
[0018] Among them: 1 inner casing, 2 conduit, 3 positioning device, 4 outer casing, 5 grouting device, 6 central conduit, 7 funnel. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0019] The following will clearly and completely describe the technical solutions in the embodiments of the present utility model in conjunction with the drawings in the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, rather than all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.
[0020] Embodiment 1:
[0021] As Figure 1 shown, a filling and sealing perfusion device for the bottom and the outside of the well during deep well construction includes an inner casing 1, and a conduit 2 is fixedly installed on the outer sidewall of the inner casing 1 through a positioning device 3.
[0022] Embodiment 2:
[0023] As Figure 2 shown, a filling and sealing perfusion device for the bottom and the outside of the well during deep well construction includes an inner casing 1, a conduit 2 is fixedly installed on the outer sidewall of the inner casing 1 through a positioning device 3, multiple conduits (2) are provided according to construction needs, and the conduits (2) are connected to a grouting device (5).
[0024] Embodiment 3:
[0025] As Figure 3 shown, a filling and sealing perfusion device for the bottom and the outer side of a deep well during construction includes an inner casing 1. A conduit 2 is fixedly installed on the outer side wall of the inner casing 1 through a positioning device 3. The device further includes an outer casing 4. There is a gap with a certain distance between the outer casing 4 and the inner casing 1 according to construction requirements. The positioning device 3 is a positioning hoop. The conduits 2 are evenly distributed on the outer side wall of the inner casing 1. The device further includes a funnel 7. The lower end of the funnel 7 is connected with a central conduit 6. The central conduit 6 is located inside the inner casing 1.
[0026] In the above embodiment, the number of the conduits 2 is set according to construction requirements > 1, usually 2 - 6, and optimally 4.
[0027] In the above embodiment, the conduits 2 can be connected in sections according to construction depth requirements, and the connection forms include but are not limited to threaded connection, welded connection, and bolt connection.
[0028] Working principle: During construction, first install the conduits 2 on the outer side of the inner casing 1 through the positioning device 3 on the ground, drive the outer casing 4 to a certain depth underground, take soil to form a hole inside the outer casing 4, then hoist the inner casing 1 with the conduits 2 installed into the outer casing 4, then hoist the central conduit 6 into the inner casing 1, connect the central conduit 6 with the funnel 7, use a general concrete perfusion device to perform concrete perfusion and sealing at the bottom of the inner casing 1. After that, connect the grouting device 5 with the conduits 2 one by one for grouting to complete the construction filling and grouting operation on the outer side of the deep well.
[0029] The above are only the preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.
Claims
1. A filling and sealing perfusion device for the bottom and the outer side of a well during deep well construction, characterized in that: It includes an inner sleeve (1), and a conduit (2) is fixedly installed on the outer sidewall of the inner sleeve (1) through a positioning device (3).
2. The filling and sealing perfusion device for the bottom and the outer side of the well during deep well construction according to claim 1, wherein: It further includes an outer sleeve (4), and there is a gap with a certain distance between the outer sleeve (4) and the inner sleeve (1) according to the construction requirements.
3. A filling and sealing perfusion device for the bottom and the outer side of a well during deep well construction according to claim 1, characterized in that: The positioning device (3) is a positioning hoop.
4. A filling and sealing perfusion device for the bottom and the outer side of a well during deep well construction according to claim 1, characterized in that: The number of the conduits (2) is greater than 1, and they are evenly distributed on the outer sidewall of the inner sleeve (1).
5. A filling and sealing perfusion device for the bottom and the outside of a well during deep well construction according to any one of claims 1 to 4, characterized in that: It further includes a grouting device (5) connected to the conduit (2).
6. A filling and sealing perfusion device for the bottom and the outer side of a well during deep well construction according to claim 5, characterized in that: It further includes a funnel (7), the lower end of the funnel (7) is connected with a central conduit (6), and the central conduit (6) is located inside the inner sleeve (1).