Electric power pipeline capable of being rapidly installed and butted

Through the design of the card slot, card block and rotating rod, the rapid installation and stable connection of the power pipeline are achieved, and the problems of cumbersome connections and harmful welding in the prior art are solved, simplifying the construction process and improving safety.

CN223181751UActive Publication Date: 2025-08-01SHENZHOU YIJIE TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422231783.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2025-08-01
Estimated Expiration
2034-09-12

AI Technical Summary

Technical Problem

The existing power pipeline connection methods are cumbersome, and the welding process is harmful to personnel's health.

Method used

The design of the card slot, the card block, the rotating rod and the limiting member is adopted. Through the cooperation of the rotating rod and the limiting member, the pipes can be quickly connected and stable connection is achieved through magnetic fixation.

Benefits of technology

It realizes rapid installation and stable connection of power pipelines, simplifies the construction process, and avoids the health hazards of welding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223181751U_ABST
    Figure CN223181751U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick installation butt joint electric power pipeline, which comprises a pipeline I and a pipeline II, the pipeline I is provided with a clamping groove, the pipeline II is fixedly provided with a clamping block clamped with the clamping groove, the pipeline II is rotatably connected with a rotating rod, the pipeline I is fixedly provided with a fixed disc, the fixed disc is provided with an open groove matched with the rotating rod, and the open groove is matched with the rotating rod. And the rotating rod is matched with the limiting piece to fix the pipeline I and the pipeline II. The rotating rod extends into the open groove, the sleeve block is sleeved on the rotating rod, the round sleeve is rotated, so that the round sleeve is in threaded connection with the rotating rod, along with continuous rotation of the round sleeve, the round block can extend into the round groove, the first pipeline and the second pipeline are in tight butt joint, the first pipeline and the second pipeline are fixed into a whole, operation is simple, and practicability is high. And quick operation can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power pipelines, in particular to a power pipeline for quick installation and docking. Background Art

[0002] When connecting the cable protection pipelines of electricity, there are many ways, such as using flange plates and bolts for fixation, welding fixation, etc.

[0003] When the flange plate and the bolt are matched to fix the protection pipe of the power pipeline, the fixing method is relatively cumbersome and the construction process is long; when fixing the power cable protection pipe by a hot air welding gun or an electrofusion welding machine, professional personnel are required, and the smoke and smell generated during the welding process will cause health harm to the welding personnel.

[0004] Therefore, a relatively simple and convenient power cable pipeline that can be quickly docked and installed is needed. Content of the Utility Model

[0005] The purpose of the utility model is to provide a power pipeline for quick installation and docking in order to solve the above problems.

[0006] In order to achieve the above purpose, the utility model adopts the following technical scheme:

[0007] A power pipeline for quick installation and docking includes a pipeline one and a pipeline two. A clamping groove is opened on the pipeline one, and a clamping block that is clamped with the clamping groove is fixed on the pipeline two. A rotating rod is rotatably connected to the pipeline two, and a fixed disk is fixed on the pipeline one, and a slot adapted to the rotating rod is opened on the fixed disk. With the cooperation of a limiting member, the pipeline one and the pipeline two are fixed.

[0008] Preferably, the limiting member includes a circular groove opened on the fixed disk. A sleeve block is slidably connected to the rotating rod, and a circular sleeve is rotatably connected to the sleeve block. The circular sleeve is threadedly connected to the rotating rod. A circular block adapted to the circular groove is fixed on the sleeve block, and the circular sleeve maintains its position with the cooperation of a positioning member.

[0009] Preferably, the positioning member includes a through hole opened on the circular sleeve, and a connecting groove corresponding to the through hole is opened on the circular block. A circular rod extends into the through hole, and the end of the circular rod is clamped with the connecting groove.

[0010] Preferably, the part where the end of the circular rod is clamped with the connecting groove is fixed magnetically.

[0011] Preferably, an elastic rubber gasket protrudes on the part where the pipeline one and the pipeline two are docked.

[0012] In summary, due to the adoption of the above technical scheme, the beneficial effects of the utility model are as follows:

[0013] 1. In this application, the rotating rod is inserted into the slotted opening, the sleeve block is sleeved on the rotating rod, and the circular sleeve is rotated so that the circular sleeve is threadedly connected to the rotating rod. As the circular sleeve continues to rotate, the circular block can be caused to extend into the circular groove, resulting in the tight docking of Pipe 1 and Pipe 2 and fixing Pipe 1 and Pipe 2 as a whole. The operation is relatively simple and can be quickly mastered.

[0014] 2. In this application, the round rod passes through the through hole formed in the circular sleeve and engages with the connecting groove. At this time, the circular sleeve and the sleeve block are connected as a whole, so the circular sleeve cannot be forced to rotate. Therefore, Pipe 1 and Pipe 2 can be stably connected, effectively preventing the circular sleeve from accidentally detaching from the rotating rod due to external force. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 Shows the schematic structural diagram of the connection of the power cable protection pipe provided by the embodiment of the present utility model;

[0016] Figure 2 Shows the schematic structural diagram of Pipe 1 provided by the embodiment of the present utility model;

[0017] Figure 3 Shows the schematic structural diagram of Pipe 2 provided by the embodiment of the present utility model;

[0018] Figure 4 Shows the schematic structural diagram of one side of Pipe 1 provided by the embodiment of the present utility model; <s

[0019] Figure 5 Shows the schematic partial structural diagram of the circular sleeve provided by the embodiment of the present utility model;

[0020] Figure 6 Shows the schematic partial sectional structural diagram of the circular sleeve and the sleeve block provided by the embodiment of the present utility model;

[0021] LEGEND DESCRIPTION:

[0022] 1. Pipe 1; 2. Card slot; 3. Fixed disk; 4. Slotted opening; 5. Circular groove; 6. Pipe 2; 7. Card block; 8. Rotating rod; 9. Sleeve block; 10. Circular block; 11. Circular sleeve; 12. Through hole; 13. Connecting groove; 14. Round rod. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0023] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

[0024] Embodiment 1:

[0025] The present utility model provides a technical solution. Please refer to Figure 1-6 :

[0026] A power pipeline for quick installation and docking, including pipeline 1 and pipeline 6. An elastic rubber gasket protrudes on the docking part of pipeline 1 and pipeline 6. A clamping groove 2 is opened on pipeline 1, and a clamping block 7 that engages with the clamping groove 2 is fixed on pipeline 6. A rotating rod 8 is rotatably connected to pipeline 6, and a fixed disk 3 is fixed on pipeline 1. A slot 4 adapted to the rotating rod 8 is opened on the fixed disk 3. With the cooperation of the limiting member, pipeline 1 and pipeline 6 are fixed. With the cooperation of the clamping block 7 and the clamping groove 2, pipeline 1 and pipeline 6 can maintain their positions and will not rotate relative to each other.

[0027] Embodiment 2:

[0028] Basically the same as the technical solution of Embodiment 1, the difference is that, as Figure 3 shown, the limiting member includes a circular groove 5 opened on the fixed disk 3. A sleeve block 9 is slidably connected to the rotating rod 8, and a circular sleeve 11 is rotatably connected to the sleeve block 9. The circular sleeve 11 is threadedly connected to the rotating rod 8. A circular block 10 adapted to the circular groove 5 is fixed on the sleeve block 9. The circular sleeve 11 maintains its own position with the cooperation of the positioning member. After the circular sleeve 11 is threadedly connected to the rotating rod 8 and the circular block 10 extends into the circular groove 5, at this time, under the action of the rotating rod 8, pipeline 1 and pipeline 6 can be fixed as a whole.

[0029] Embodiment 3:

[0030] Basically the same as the technical solution of Embodiment 1, the difference is that, as Figure 6 shown, the positioning member includes a through hole 12 opened on the circular sleeve 11, and a connecting groove 13 corresponding to the through hole 12 is opened on the circular block 10. A circular rod 14 extends into the through hole 12, and the end of the circular rod 14 is engaged with the connecting groove 13. The part where the end of the circular rod 14 is engaged with the connecting groove 13 is fixed by magnetism.

[0031] In summary, for the present embodiment, by engaging the clamping block 7 on pipeline 6 with the clamping groove 2 of pipeline 1, the rotating rod 8 can be rotated to make the rotating rod 8 extend to the slot 4. The sleeve block 9 is sleeved on the rotating rod 8, and the circular sleeve 11 is rotated to make the circular sleeve 11 threadedly connected to the rotating rod 8. The circular block 10 on the sleeve block 9 is aligned with the circular groove 5 on the fixed disk 3. As the circular sleeve 11 continues to rotate, the circular block 10 can extend into the circular groove 5, thereby causing pipeline 1 and pipeline 6 to be closely docked and making pipeline 1 and pipeline 6 fixed as a whole.

[0032] Finally, the round rod 14 is engaged with the connecting groove 13 through the through hole 12 formed in the round sleeve 11. At this time, the round sleeve 11 and the sleeve block 9 are connected as a whole. Therefore, the round sleeve 11 cannot be forced to rotate at this time, and the first pipe 1 and the second pipe 6 can be stably connected.

[0033] The above description of the embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A power pipeline for quick installation and docking, comprising a first pipeline (1) and a second pipeline (6), characterized in that, A clamping groove (2) is provided on the first pipe (1), and a clamping block (7) engaged with the clamping groove (2) is fixed on the second pipe (6). A rotating rod (8) is rotatably connected to the second pipe (6), and a fixed disk (3) is fixed on the first pipe (1). A slot (4) adapted to the rotating rod (8) is provided on the fixed disk (3). With the cooperation of the limiting member, the first pipe (1) and the second pipe (6) are fixed.

2. The quick-installation and docking power pipeline according to claim 1, wherein The limiting member includes a circular groove (5) provided on the fixed disk (3). A sleeve block (9) is slidably connected to the rotating rod (8), and a circular sleeve (11) is rotatably connected to the sleeve block (9). The circular sleeve (11) is threadedly connected to the rotating rod (8). A circular block (10) adapted to the circular groove (5) is fixed on the sleeve block (9). With the cooperation of the positioning member, the circular sleeve (11) maintains its position.

3. The quick-installation and docking power pipeline according to claim 2, wherein, The positioning member includes a through hole (12) provided on the circular sleeve (11), and a connecting groove (13) corresponding to the through hole (12) is provided on the circular block (10). A round rod (14) extends into the through hole (12), and the end of the round rod (14) is engaged with the connecting groove (13).

4. A power pipeline for quick installation and docking according to claim 3, characterized in that, The part where the end of the round rod (14) is engaged with the connecting groove (13) is fixed magnetically.

5. A power pipeline for quick installation and docking according to claim 1, characterized in that, An elastic rubber gasket protrudes from the part where the first pipe (1) and the second pipe (6) are butted.