Quick-mounting type building decoration curtain wall mounting mechanism

Through the rapid splicing and assembly of the positioning module and fixing module of the quick-installed building decorative curtain wall installation mechanism, the construction cycle and risk of personnel injury caused by bolt fixation in the existing technology are solved, and simple and fast curtain wall installation is achieved.

CN223189890UActive Publication Date: 2025-08-05新疆兵团城建集团有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422451792.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2025-08-05
Estimated Expiration
2034-10-11

AI Technical Summary

Technical Problem

The installation method of existing building decorative curtain walls mainly relies on bolt fixation, which leads to troublesome operation, prolongs construction cycle and increases the risk of injury to construction workers.

Method used

The quick-installed building decorative curtain wall installation mechanism is adopted, and through the rapid splicing and assembly of positioning modules and fixed modules, the positioning connection is first positioned and then fixed connection is then fixed. The components are prefabricated in the factory, and construction is simplified on-site.

Benefits of technology

Significantly shorten the construction cycle, reduce manpower and material investment, reduce construction costs and reduce the risk of personnel injury.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223189890U_ABST
    Figure CN223189890U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of installation mechanisms, in particular to a fast-assembly type building decoration curtain wall installation mechanism which comprises a wall body, a fixing module and a positioning module. Four groups of wall bodies are arranged in a surrounding manner, a fixing module for fixedly connecting the four groups of wall bodies is arranged among every four groups of wall bodies, and a positioning module for positioning and connecting every two groups of wall bodies is arranged between every two groups of wall bodies; the two groups of wall bodies are positioned and connected through the positioning modules, then the four groups of wall bodies are fixedly connected through the fixing modules, and a quick splicing and assembling structure is adopted, so that the mounting process of the curtain wall is simpler, more convenient and quicker; only simple assembly and connection are needed during site construction, the construction period is greatly shortened, meanwhile, less manpower, material resource and time investment is achieved, and therefore the overall construction cost can be reduced, and the risk that constructors are injured is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of installation mechanisms, in particular to a quick-installation building decorative curtain wall installation mechanism. Background Art

[0002] Architectural decorative curtain wall, abbreviated as curtain wall, is the exterior wall enclosure structure of a building. It has decorative effects and is usually non-load-bearing. It is hung like a curtain, so it is also called "hanging wall" or "curtain wall". The curtain wall is mainly composed of a structural frame and inlaid panels. These materials can be glass, stone, metal plates, etc. They together constitute a lightweight, beautiful and multifunctional building exterior enclosure structure. The architectural decorative curtain wall installation mechanism mainly refers to a series of equipment and components used to hang, support and install curtain wall panels during high-altitude operations. These mechanisms play a vital role in the curtain wall construction process. They must not only ensure the safety and efficiency of construction, but also ensure the quality and aesthetics of the curtain wall during use.

[0003] Most existing curtain walls are directly fixed and installed with bolts. Since this installation method can only be performed one by one, the operation is cumbersome, and the construction period may be correspondingly extended because more time and manpower are required to install and debug each component one by one. At the same time, it may lead to increased safety risks during the construction process because more manual operations and high-altitude operations are required, which increases the risk of injury to construction workers.

[0004] Therefore, most of the existing curtain walls mentioned above are directly fixed and installed by bolts. Since this installation method can only be performed one by one, the operation is cumbersome, the construction period may be correspondingly extended, and the risk of injury to construction workers may be increased. A quick-installation building decorative curtain wall installation mechanism can be designed, and a curtain wall that is quickly spliced and assembled can be used to complete the curtain wall installation process. Utility Model Content

[0005] In order to overcome the problem that most existing curtain walls are directly fixed and installed by bolts, since this installation method can only be operated one by one, the operation is cumbersome, the construction period may be correspondingly extended, and the risk of injury to construction workers may be increased.

[0006] The technical solution of the utility model is: a quick-install building decorative curtain wall installation mechanism, including a wall body, a fixing module and a positioning module; four groups are arranged around the wall body, and a fixing module for fixing the four groups of walls is provided between each four groups of walls, and a positioning module for positioning the two groups of walls is provided between each two groups of walls, and each set of corners on the outside of the wall is provided with a corner connecting sleeve, and the corner connecting sleeve is symmetrically provided with a first connecting hole on the upper and lower corners, and the corner connecting sleeve is provided with a plug-in sleeve through the middle of the first connecting hole, and a fixing pin is provided inside the plug-in sleeve, the fixing module includes a square fixing frame, a fixing column and a nut, and each corner of the square fixing frame is provided with a fixing column, the positioning module includes a first convex block, a second plug-in column, a second convex block, a second plug-in hole and a positioning column, three groups of second plug-in columns are installed at a horizontal interval in the middle of the lower end of the first convex block, a second convex block is provided below the first convex block, and a second plug-in hole is provided in the middle of the upper part of the second convex block corresponding to the second plug-in column.

[0007] Preferably, the two groups of walls are first positioned and connected by positioning modules, and then the four groups of walls are fixedly connected by fixing modules. By adopting a quick splicing and assembly structure, the installation process of the curtain wall is made simpler and faster. Since many components have been prefabricated in the factory, only simple assembly and connection are required during on-site construction, which greatly shortens the construction period. It also means less manpower, material resources and time investment, which helps to reduce overall construction costs and reduce the risk of injury to construction workers.

[0008] Preferably, two groups of first plug-in columns are horizontally installed on one side of the outside of the corner connecting sleeve, and first plug-in holes are opened on one side of the outside of the corner connecting sleeve corresponding to the first plug-in columns.

[0009] Preferably, a fixing hole is provided in the middle portion above the corner connecting sleeve, and a second connecting hole is provided on the wall near the corner corresponding to the first connecting hole.

[0010] Preferably, the plug-in sleeve passes through the first connecting hole and the second connecting hole and is positioned and connected to the corner connecting sleeve and the wall, and multiple groups of positioning holes are arranged around the wall on both the upper and lower sides.

[0011] Preferably, a nut is sleeved on the outside of the fixing column.

[0012] Preferably, multiple groups of positioning columns are installed symmetrically on both sides of the first convex block and the second convex block.

[0013] Preferably, the positioning column drives the first convex block and the second convex block to be positioned and connected to the wall through the positioning hole.

[0014] Beneficial effects of the utility model:

[0015] 1. First, the two groups of walls are positioned and connected through positioning modules, and then the four groups of walls are fixedly connected through fixing modules. By adopting a quick splicing and assembly structure, the curtain wall installation process is simpler and faster. Since many components have been prefabricated in the factory, only simple assembly and connection are required during on-site construction, which greatly shortens the construction period. It also means less manpower, material resources and time investment, which helps to reduce overall construction costs and reduce the risk of injury to construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 Shown is a schematic diagram of the overall structure of the curtain wall installation mechanism of the present utility model;

[0017] Figure 2 Shown is a schematic diagram of the wall structure of the curtain wall installation mechanism of the present utility model;

[0018] Figure 3 Shown is a schematic diagram of the square fixing frame structure of the curtain wall installation mechanism of the present utility model;

[0019] Figure 4 Shown is a schematic diagram of the first convex block structure of the curtain wall installation mechanism of the present invention.

[0020] Explanation of the accompanying drawings: 1. Wall; 101. Corner connecting sleeve; 102. First plug-in column; 103. First plug-in hole; 104. Fixing hole; 105. First connecting hole; 106. Second connecting hole; 107. Connecting sleeve; 108. Fixing pin; 109. Positioning hole; 201. Square fixing frame; 202. Fixing column; 203. Nut; 301. First convex block; 302. Second plug-in column; 303. Second convex block; 304. Second plug-in hole; 305. Positioning column. DETAILED DESCRIPTION

[0021] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0022] See also Figure 1-Figure 4The utility model provides an embodiment: a quick-install building decorative curtain wall installation mechanism, including a wall 1, a fixing module and a positioning module; four groups are arranged around the wall 1, and a fixing module for fixing and connecting the four groups of walls 1 is provided between each four groups of walls 1, and a positioning module for positioning and connecting the two groups of walls 1 is provided between each two groups of walls 1, and each set of corners of the wall 1 is provided with a corner connecting sleeve 101, and the corner connecting sleeve 101 is symmetrically opened with a first connecting hole 105 on the upper and lower sides of the corner, and the corner connecting sleeve 101 has a first connecting hole 105 opened in the middle of which a plug sleeve 107 is passed through, and the plug sleeve 107 is inserted into the middle of the plug sleeve 107. 7 is provided with a fixing pin 108, and the fixing module includes a square fixing frame 201, a fixing column 202 and a nut 203. The fixing column 202 is provided at each corner of the square fixing frame 201. The positioning module includes a first convex block 301, a second plug-in column 302, a second convex block 303, a second plug-in hole 304 and a positioning column 305. Three groups of second plug-in columns 302 are installed laterally at intervals in the middle of the lower end of the first convex block 301. A second convex block 303 is provided below the first convex block 301. A second plug-in hole 304 is provided in the middle of the upper end of the second convex block 303 corresponding to the second plug-in column 302.

[0023] See also Figure 2 In this embodiment, two groups of first plug-in columns 102 are horizontally installed on the outer side of the corner connecting sleeve 101, and a first plug-in hole 103 is opened on the outer side of the corner connecting sleeve 101 corresponding to the first plug-in column 102. When the wall 1 and the corner connecting sleeve 101 are assembled, the two groups of walls 1 are brought close together, and the first plug-in column 102 passes through the first plug-in hole 103 to position and connect the two groups of corner connecting sleeves 101. Repeat the operation multiple times to perform preliminary positioning and connection on multiple groups of walls 1. A fixing hole 104 is opened in the middle of the upper part of the corner connecting sleeve 101. The first plug-in hole 103 is opened on the wall 1 near the corner and connected to the first plug-in hole 103. A second connection hole 106 is provided corresponding to the hole 105. Take out an appropriate amount of wall 1 as needed, and then arrange them in an array. Then, the corner connection sleeve 101 is placed on the corner of the wall 1. The plug-in sleeve 107 passes through the first connection hole 105 and the second connection hole 106 to position and connect the corner connection sleeve 101 and the wall 1. Multiple groups of positioning holes 109 are provided around the wall 1 on both the upper and lower sides. Pick up the plug-in sleeve 107, pass it through the first connection hole 105 and the second connection hole 106 to position and connect the corner connection sleeve 101 and the wall 1, and then insert the fixing pin 108 into the plug-in sleeve 107 to fix it.

[0024] See also Figure 3In this embodiment, a nut 203 is provided on the outside of the fixing column 202. After the preliminary connection of the wall 1 is completed, the square fixing frame 201 is picked up and placed at the connection of the four groups of walls 1. Then, the fixing column 202 is picked up and passed through the square fixing frame 201 through the fixing hole 104 to be positioned and connected to the corner connecting sleeve 101. The nut 203 is then tightened to complete the further fixation between the walls 1.

[0025] See also Figure 4 In this embodiment, multiple groups of positioning columns 305 are installed laterally and symmetrically on both sides of the first convex block 301 and the second convex block 303. After the wall 1 is further fixed, pick up the first convex block 301 and the second convex block 303 and place them at the connection gap between the two groups of wall 1. During this process, the second plug-in column 302 drives the first convex block 301 to be positioned and connected with the second convex block 303 through the second plug-in hole 304, and the positioning column 305 drives the first convex block 301 and the second convex block 303 to be positioned and connected with the wall 1 through the positioning hole 109. At the same time, the positioning column 305 drives the first convex block 301 and the second convex block 303 to be positioned and connected with the wall 1 through the positioning hole 109. The assembly of the wall 1 is completed, and the next step of installation can be carried out.

[0026] When working, take out an appropriate amount of wall 1 as needed, then arrange them in an array, then put the corner connecting sleeve 101 on the corner of the wall 1, finally pick up the plug sleeve 107, pass it through the first connecting hole 105 and the second connecting hole 106 to position and connect the corner connecting sleeve 101 and the wall 1, and then insert the fixing pin 108 into the plug sleeve 107 to fix it. When the wall 1 and the corner connecting sleeve 101 are assembled, bring the two groups of wall 1 closer, pass the first plug column 102 through the first plug hole 103, and position and connect the two groups of corner connecting sleeves 101. Repeat the operation multiple times to preliminarily position and connect multiple groups of wall 1.

[0027] After the initial connection of the walls 1 is completed, pick up the square fixing frame 201 and place it at the connection point of the four sets of walls 1. Then pick up the fixing column 202, pass it through the square fixing frame 201 and fix it to the corner connecting sleeve 101 through the fixing hole 104, and then tighten it with the nut 203 to further fix the walls 1.

[0028] After the wall 1 is further fixed, pick up the first convex block 301 and the second convex block 303 and place them in the connecting gap between the two groups of wall 1. During this process, the second plug-in column 302 drives the first convex block 301 to be positioned and connected with the second convex block 303 through the second plug-in hole 304. At the same time, the positioning column 305 drives the first convex block 301 and the second convex block 303 to be positioned and connected with the wall 1 through the positioning hole 109. The assembly of the wall 1 is completed and the next step of installation can be carried out.

[0029] Through the above steps, the two groups of walls 1 are first positioned and connected by the positioning modules, and then the four groups of walls 1 are fixedly connected by the fixing modules. By adopting a quick splicing and assembly structure, the installation process of the curtain wall is made simpler and faster. Since many components have been prefabricated in the factory, only simple assembly and connection are required during on-site construction, which greatly shortens the construction period. It also means less manpower, material resources and time investment, which helps to reduce the overall construction cost and reduce the risk of injury to construction workers. This solves the problem that most existing curtain walls are directly fixed and installed by bolts. Since this installation method can only be operated one by one, the operation is cumbersome, the construction period may be extended accordingly, and the risk of injury to construction workers may be increased.

Claims

1. A quick-installation building decorative curtain wall installation mechanism, comprising a wall body (1); characterized in that: The invention also includes a fixing module and a positioning module; four groups of walls (1) are arranged around the wall, and a fixing module for fixing and connecting the four groups of walls (1) is arranged between each four groups of walls (1), and a positioning module for positioning and connecting the two groups of walls (1) is arranged between each two groups of walls (1); each set of corners outside the wall (1) is provided with a corner connecting sleeve (101), and the corner connecting sleeve (101) is symmetrically provided with a first connecting hole (105) on the upper and lower sides of the corner; the corner connecting sleeve (101) is provided with a plug sleeve (107) in the middle of the first connecting hole (105), and the plug sleeve (107) is provided with a fixing pin (108) inside. The fixing module includes The invention comprises a square fixing frame (201), a fixing column (202) and a nut (203); the fixing column (202) is penetrated at each corner of the square fixing frame (201); the positioning module comprises a first convex block (301), a second plugging column (302), a second convex block (303), a second plugging hole (304) and a positioning column (305); three groups of second plugging columns (302) are installed at intervals in the middle of the lower end of the first convex block (301); a second convex block (303) is provided below the first convex block (301); and a second plugging hole (304) is opened in the middle of the upper part of the second convex block (303) corresponding to the second plugging column (302).

2. The fast-installation building decorative curtain wall installation mechanism according to claim 1, characterized in that: Two groups of first plug-in columns (102) are transversely mounted on one side of the outer portion of the corner connecting sleeve (101), and first plug-in holes (103) are provided on one side of the outer portion of the corner connecting sleeve (101) corresponding to the first plug-in columns (102).

3. The fast-installation building decorative curtain wall installation mechanism according to claim 1, characterized in that: A fixing hole (104) is provided in the middle of the upper portion of the corner connecting sleeve (101), and a second connecting hole (106) is provided on the wall (1) near the corner corresponding to the first connecting hole (105).

4. The fast-installation building decorative curtain wall installation mechanism according to claim 1, characterized in that: The plug sleeve (107) passes through the first connection hole (105) and the second connection hole (106) to be positioned and connected with the corner connection sleeve (101) and the wall (1). Multiple groups of positioning holes (109) are arranged around the wall (1) on both the upper and lower sides.

5. The fast-installation building decorative curtain wall installation mechanism according to claim 1, characterized in that: The exterior of the fixing column (202) is sleeved with a nut (203).

6. The fast-installation building decorative curtain wall installation mechanism according to claim 1, characterized in that: Multiple groups of positioning posts (305) are symmetrically installed on both sides of the first convex block (301) and the second convex block (303).

7. The fast-installation building decorative curtain wall installation mechanism according to claim 4, characterized in that: The positioning column (305) drives the first convex block (301) and the second convex block (303) to be positioned and connected to the wall (1) through the positioning hole (109).