Temporary protective barrier for prefabricated arc-shaped stand plate of comprehensive stadium

By inserting steel pipe columns into prefabricated arc stand plates and connecting them to the steel plates, and forming an annular guardrail with the wire rope, the damage problem of traditional protective fences on the stand plates is solved, and temporary protection effects are achieved that are safe, economical and environmentally friendly.

CN223202763UActive Publication Date: 2025-08-08CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421749658.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2025-08-08
Estimated Expiration
2034-07-23

AI Technical Summary

Technical Problem

In the construction of prefabricated arc stands in the comprehensive stadium, traditional protective fence construction will destroy the finished stands, and increase the cost of safe and civilized construction, and it is difficult to meet the on-site safety protection requirements.

Method used

The steel pipe column inserted into the grouting hole is connected to the steel plate, and the displacement and overturning of the steel pipe columns are restricted through the grouting holes and steel plates. The circular continuous guardrail is formed with the protective wire rope to avoid expansive screws on the stands and achieve safe and stable temporary protection.

Benefits of technology

It realizes safety and stability protection without destroying the surface of the stand panel, simplifies the construction process, reduces construction costs, meets environmental protection requirements, and is reusable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223202763U_ABST
    Figure CN223202763U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of temporary protective guards for safety construction, and particularly discloses a temporary protective barrier for a prefabricated arc-shaped stand plate of a comprehensive stadium, which comprises the arc-shaped prefabricated stand plate and a steel plate, the arc-shaped prefabricated stand plate is provided with grouting holes, the side edge of the arc-shaped prefabricated stand plate is provided with stand plate lifting lugs, and the steel plate is arranged on the arc-shaped prefabricated stand plate. A derivation plate is arranged on the side, away from the stand plate lifting lugs, of the arc-shaped prefabricated stand plate, stand plate pin rod connecting embedded parts are arranged on the derivation plate, steel chisels matched with the grouting holes are arranged below the steel plate, a plurality of steel pipe stand columns are arranged above the steel plate, each steel pipe stand column is provided with a lifting lug, and therefore a simple and temporary protection stand column is formed. Protective steel wire ropes are connected between the multiple steel pipe stand columns, the protective steel wire ropes are connected with the hanging lugs, the protective steel wire ropes are wound on the hanging lugs of the stand columns by at least one circle, the protective steel wire ropes form an annular continuous protective barrier, and the effect of temporary protection in the construction process of the prefabricated arc-shaped stand plate of the comprehensive stadium is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of temporary protective railings for safe construction, in particular to temporary protective railings for prefabricated curved stand panels in comprehensive sports stadiums. Background Art

[0002] The comprehensive sports stadium's grandstand panels utilize prefabricated curved slabs. The standard area of these prefabricated curved stands primarily encompasses the spectator seating area, allowing for standardized design techniques to facilitate production and reduce costs. The prefabricated bare concrete stands rely on the main structure for load transmission, with bolts providing a secure connection between the main structure and the prefabricated stands. Four shear connectors are installed between the upper and lower adjacent slabs, along with grouting holes spaced 2 meters apart. These are anchored by pins to these holes, enhancing the coordinated load-bearing performance of adjacent slabs.

[0003] During the hoisting process, due to the non-construction of the upper row, edges appeared on the site, which did not meet the on-site safety protection requirements. With the traditional protective enclosure construction, it was necessary to fix the curved prefabricated stand panels with expansion screws, which damaged the finished curved prefabricated stand panels. In the process of transporting the finished protective enclosure, the curved prefabricated stand panels were also easily damaged, resulting in a large workload for repairing the bare concrete in the later stage. In addition, the extensive use of finished protective enclosures also increased the cost of safe and civilized construction. Utility Model Content

[0004] The purpose of the present utility model is to provide a temporary protective railing for prefabricated curved stand panels in a comprehensive sports stadium to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums, comprising a curved prefabricated stand panel and a steel plate, wherein a plurality of grouting holes are opened on the curved prefabricated stand panel, and a stand panel lifting lug is provided on the side of the curved prefabricated stand panel, and a derivative plate is provided on the side of the curved prefabricated stand panel away from the stand panel lifting lug, and a stand panel pin rod connecting embedded part is provided on the derivative plate, a steel drill adapted for the grouting hole is provided below the steel plate, and a plurality of steel pipe columns are provided above the steel plate, and each steel pipe column is provided with a hanging lug, thereby forming a simple temporary protective column; protective steel wire ropes are connected between the plurality of steel pipe columns, and the protective steel wire ropes are connected to the hanging lugs, and the protective steel wire ropes are wrapped around each column hanging lug at least once, and the protective steel wire ropes form a ring-shaped continuous protective railing, thereby achieving the effect of temporary protection during the construction of prefabricated curved stand panels in comprehensive sports stadiums.

[0006] As a preferred embodiment of the present invention, the steel chisel and the steel plate, the steel pipe column and the steel plate, and the hanging ear and the steel pipe column are all welded, and the steel chisel is inserted into the grouting hole to limit the displacement and overturning of the steel pipe column through the grouting hole and the steel plate, thereby achieving a safe and stable effect.

[0007] As a preferred embodiment of the present invention, the stand board lifting lug is U-shaped.

[0008] As a preferred embodiment of the present invention, the specifications (length, width, thickness) of the steel plate are 10*10*0.8 cm.

[0009] As a preferred embodiment of the present invention, the height of the steel pipe column is 1.2m, and the diameter of the steel pipe column is Φ4.8cm.

[0010] As a preferred embodiment of the present invention, the maximum sag of the steel wire rope shall not be greater than 10 cm to improve the stability of the structure.

[0011] As a preferred embodiment of the present invention, the spacing between the multiple grouting holes is 2m, the prefabricated curved stand panels are prefabricated in the factory, and grouting holes are reserved at 2m intervals. The grouting holes are used as fixing holes for temporary protective railings before a row of prefabricated curved stand panels are assembled.

[0012] Compared with the prior art, the beneficial effects of the present invention are:

[0013] The utility model inserts a steel chisel into the grouting hole, and limits the displacement and overturning of the steel pipe column through the grouting hole and the steel plate, thereby achieving a safe and stable effect; the steel pipe column unit is fixed to the grouting hole of the stand board, and there is no need to inject expansion screws on the curved prefabricated stand board to fix it, and there is no need to damage the finished surface of the clear water stand board, which is economical and reasonable; the temporary protective railings used for the prefabricated curved stand boards of comprehensive sports stadiums can be easily dismantled and installed on the required air-facing surface according to the actual construction progress on site, and can be uniformly dismantled after use, and can be repeatedly allocated for use, which has certain economic performance and meets environmental protection requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the top view of the structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the cross-sectional structure of the utility model at AA.

[0016] In the figure: 1. Arc-shaped prefabricated grandstand panel; 2. Steel plate; 3. Steel pipe column; 4. Grouting hole; 5. Hanging ear; 6. Protective wire rope; 7. Grandstand panel lifting ear; 8. Steel chisel; 9. Grandstand panel pin rod connecting embedded parts. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0018] In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.

[0019] It should also be noted that, in the description of this utility model, unless otherwise expressly specified or limited, the terms "disposed," "installed," "connected," and "connected" should be understood in a broad sense. For example, they may refer to fixed connections, detachable connections, or integral connections; they may refer to mechanical connections or electrical connections; they may refer to direct connections or indirect connections through an intermediate medium; and they may refer to internal communication between two components. Those skilled in the art will be able to understand the specific meanings of the above terms in this utility model based on specific circumstances.

[0020] See also Figure 1-2 The utility model provides a technical solution: a temporary protective railing for prefabricated curved stand panels in a comprehensive sports stadium, comprising a curved prefabricated stand panel 1 and a steel plate 2. A plurality of grouting holes 4 are opened on the curved prefabricated stand panel 1, and a stand panel lifting ear 7 is provided on the side of the curved prefabricated stand panel 1. A derivative plate is provided on the side of the curved prefabricated stand panel 1 away from the stand panel lifting ear 7, and a stand panel pin connecting embedded part 9 is provided on the derivative plate. A steel drill 8 adapted to the grouting hole 4 is provided under the steel plate 2. A plurality of steel pipe columns 3 are provided above the steel plate 2, and each steel pipe column 3 is provided with a hanging ear 5, thereby forming a simple temporary protective column; protective wire ropes 6 are connected between the plurality of steel pipe columns 3, and the protective wire ropes 6 are connected to the hanging ear 5. The protective wire ropes are wound around each column hanging ear 5 for at least one circle, and the protective wire ropes 6 form a ring-shaped continuous protective railing, so as to achieve the effect of temporary protection during the construction of the prefabricated curved stand panels in the comprehensive sports stadium.

[0021] Furthermore, the steel drill 8 and the steel plate 2, the steel pipe column 3 and the steel plate 2, and the hanging ear 5 and the steel pipe column 3 are all welded. The steel drill 8 is inserted into the grouting hole 4, and the displacement and overturning of the steel pipe column 3 are limited by the grouting hole 4 and the steel plate 2, thereby achieving a safe and stable effect.

[0022] Furthermore, the stand plate lifting lug 7 is U-shaped.

[0023] Furthermore, the specifications (length, width, thickness) of the steel plate 2 are 10*10*0.8 cm.

[0024] Furthermore, the height of the steel pipe column 3 is 1.2 m, and the diameter of the steel pipe column 3 is Φ4.8 cm.

[0025] Furthermore, the maximum sag of the wire rope shall not be greater than 10 cm to improve the stability of the structure.

[0026] Furthermore, the spacing between multiple grouting holes 4 is 2m. The prefabricated curved stand panels are prefabricated in the factory, and grouting holes 4 are reserved at 2m. The grouting holes 4 are used as fixing holes for temporary protective railings before a row of prefabricated curved stand panels are assembled.

[0027] In summary, the utility model is used for temporary protective railings of prefabricated curved stand panels in comprehensive sports stadiums. There are grouting holes 4 required for connection between the stand panels on the curved prefabricated stand panel 1. Before the grouting holes 4 are connected to the upper row of prefabricated stands, temporary protection is required. A steel drill 8 that is adapted to the size and depth of the grouting holes 44 is welded under the 10*10*0.8cm steel plate 22, a 1.2m high Φ4.8 steel pipe column 3 is welded above the steel plate 2, and a hanging ear 5 is welded above the column to form a simple temporary protective column. The bottom of the protective column is inserted into the grouting hole 4 to effectively fix it to the curved stand panel structure, and the swing restriction is strengthened by the upper steel plate 2. The grouting holes 4 are set at a spacing of 2m in the deepened curved stand panel, which not only meets the grouting and fixing requirements of the curved stand panel connection, but also meets the spacing requirements of the temporary railing protection poles. Each pole is connected by a protective wire rope 6 to form a ring-shaped temporary protection, achieving a safe, reliable, easy to operate, and economical and reasonable effect.

[0028] It is worth noting that the entire device is controlled by a master control button. Since the devices matched with the control button are commonly used devices and belong to existing mature technologies, their electrical connection relationships and specific circuit structures will not be described in detail here.

[0029] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. Temporary protective railings for prefabricated curved stands in comprehensive sports stadiums, characterized by: The invention comprises an arc-shaped prefabricated stand panel (1) and a steel plate (2), wherein the arc-shaped prefabricated stand panel (1) is provided with a plurality of grouting holes (4), a stand panel lifting lug (7) is provided on the side of the arc-shaped prefabricated stand panel (1), a derivative plate is provided on the side of the arc-shaped prefabricated stand panel (1) away from the stand panel lifting lug (7), and a stand panel pin rod connecting embedded part (9) is provided on the derivative plate, a steel chisel (8) adapted to the grouting hole (4) is provided below the steel plate (2), a plurality of steel pipe columns (3) are provided above the steel plate (2), and each steel pipe column (3) is provided with a hanging lug (5); a plurality of the steel pipe columns (3) are connected with a protective steel wire rope (6), and the protective steel wire rope (6) is connected to the hanging lug (5).

2. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The steel chisel (8) and the steel plate (2), the steel pipe column (3) and the steel plate (2), and the hanging ear (5) and the steel pipe column (3) are all welded, and the steel chisel (8) is inserted into the grouting hole (4).

3. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The stand plate lifting lug (7) is U-shaped.

4. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The specifications of the steel plate (2) are 10*10*0.8 cm.

5. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The height of the steel pipe column (3) is 1.2m, and the diameter of the steel pipe column (3) is Φ4.8cm.

6. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The maximum sag of the wire rope shall not be greater than 10cm.

7. The temporary protective railing for prefabricated curved stand panels in comprehensive sports stadiums according to claim 1, characterized in that: The spacing between the multiple grouting holes (4) is 2m.