Novel steel plate construction embedded structure for logistics channel
Through the combined design of connecting plates, steel plates, fixed plates and limit columns, the problems of long construction time, high cost and unstable structure of traditional logistics channels are solved, and rapid installation and high stability are achieved to ensure the safe operation of logistics channels.
Patent Information
- Application Number
- CN202422653674.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-08-08
- Estimated Expiration
- 2034-10-31
AI Technical Summary
The construction methods of traditional logistics channels are time-consuming, complex and costly, the structural connections are not tight, and they are prone to deformation and damage, affecting safe operation.
The combination design of connecting plates, steel plates, fixing plates and limit columns is adopted. The connection between threaded holes and screws or bolts ensures the accurate positioning and preloading force of the steel plates and the connecting plates, and enhances structural stability.
Achieve rapid assembly and fixation, simplify the installation process, shorten the construction cycle, save manpower and material costs, and improve the stability and safety of the structure.
Smart Images

Figure CN223203406U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of pre-buried structures constructed using steel plates, in particular to a novel pre-buried structure constructed using steel plates for logistics channels. Background Art
[0002] Traditional construction methods often require extensive manual labor, including welding steel plates piece by piece. These processes are not only time-consuming but also require high technical skills. Furthermore, traditional structures are often complex to install and adjust, requiring significant labor and material resources. Inadequate structural connections can easily lead to deformation and damage during use, compromising the safe operation of the logistics channel. Utility Model Content
[0003] The purpose of the utility model is to provide a new type of steel plate for constructing a pre-buried structure for a logistics channel, so as to solve the problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0005] The logistics channel uses a new type of steel plate to construct a pre-buried structure, including: a connecting plate, a steel plate is provided on the outside of the connecting plate, a fixing plate is attached to the outside of the connecting plate and the steel plate, and a limiting column is fixed on one side of the connecting plate;
[0006] One side of the connecting plate is provided with threaded holes 1 at equal intervals;
[0007] The inner side of the steel plate is provided with two threaded holes at equal intervals;
[0008] The fixing plate includes a square block 1, the square block 1 is tightly attached to one side of the connecting plate, and a square block 2 is fixed to the outer side of the square block 1.
[0009] The fixing plate is composed of a square block 1 and a square block 2, which are respectively attached to the outer sides of the connecting plate and the steel plate. The square block 1 and the square block 2 are both provided with threaded holes 3 for fixing with the connecting plate and the steel plate by screws or bolts.
[0010] Preferably, a plurality of groups of limiting columns are fixed on the connecting plate, and the plurality of groups of limiting columns are respectively arranged in a longitudinal or transverse mirror image manner.
[0011] Preferably, the internal connection relationship between the limiting column and the second threaded hole is plug-in.
[0012] Preferably, the outer side wall of the limiting column is tightly fitted with the inner side wall of the second threaded hole.
[0013] The stopper is fixed to one side of the connecting plate and is designed to plug into the second threaded hole in the steel plate. This design not only helps to ensure the accurate positioning between the steel plate and the connecting plate, but also provides a certain preload force to enhance the stability of the structure.
[0014] Preferably, threaded holes three are provided on the square block one and the square block two.
[0015] Preferably, the outer sides of the connecting plate and the steel plate are respectively in contact with square block one and square block two.
[0016] Preferably, the square block 1 and the square block 2 are threadedly fixed to the threaded hole 1 opened on the connecting plate and the threaded hole 2 opened on the steel plate respectively by screws or bolts.
[0017] Compared with the existing technology, the utility model provides a new type of steel plate construction embedded structure for logistics channels, which has the following beneficial effects:
[0018] Compared with traditional construction methods, the structure of this utility model can be quickly assembled and fixed, and the installation and adjustment process is simple, which greatly shortens the construction period and saves manpower and material costs. Secondly, this structure has high strength and stability. Through the close cooperation of connecting plates, steel plates, fixing plates and limiting columns, the stability of the entire structure is ensured, which solves the problems of structural deformation and damage that may occur in the logistics channel during use, and ensures the safe operation of the logistics channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a three-dimensional structural diagram of the new steel plate pre-buried structure for the logistics channel proposed by the present invention;
[0020] Figure 2 This is a schematic diagram of the top view of the pre-buried structure constructed with a new type of steel plate for the logistics channel proposed in the present utility model;
[0021] Figure 3 This is a schematic diagram of the explosion structure of the pre-buried structure constructed with a new type of steel plate for the logistics channel proposed in this utility model;
[0022] Figure 4 This is a schematic diagram of the exploded structure of the new steel plate pre-buried structure for the logistics channel proposed in this utility model;
[0023] Figure 5 This is an enlarged view of node A of the embedded structure constructed with a new type of steel plate for the logistics channel proposed in this utility model.
[0024] In the figure: 1. Connecting plate; 2. Steel plate; 3. Fixing plate; 31. Square block 1; 32. Square block 2; 4. Limiting column; 5. Threaded hole 1; 6. Threaded hole 2. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0026] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. Example
[0027] refer to Figure 1-Figure 5 The logistics channel uses a new type of steel plate to construct a pre-buried structure, including: a connecting plate 1, a steel plate 2 is provided on the outside of the connecting plate 1, a fixing plate 3 is attached to the outside of the connecting plate 1 and the steel plate 2, and a limiting column 4 is fixed on one side of the connecting plate 1;
[0028] One side of the connecting plate 1 is provided with threaded holes 5 at equal intervals;
[0029] The inner side of the steel plate 2 is provided with threaded holes 6 at equal distances;
[0030] The fixing plate 3 includes a square block 1 31 . The square block 1 31 is tightly attached to one side of the connecting plate 1 , and a square block 2 32 is fixed to the outer side of the square block 1 31 .
[0031] The fixing plate 3 is composed of a square block 1 31 and a square block 2 32, which are respectively attached to the outside of the connecting plate 1 and the steel plate 2. The square block 1 31 and the square block 2 32 are both provided with threaded holes 3 for fixing to the connecting plate 1 and the steel plate 2 with screws or bolts.
[0032] Several groups of limiting columns 4 are fixed on the connecting plate 1 , and the groups of limiting columns 4 are arranged in a longitudinal or transverse mirror image manner.
[0033] The internal connection relationship between the limiting column 4 and the threaded hole 2 6 is plug-in.
[0034] The outer wall of the limiting column 4 is tightly fitted with the inner wall of the second threaded hole 6 .
[0035] The limiting column 4 is fixed to one side of the connecting plate 1 and is designed to be plugged into the threaded hole 2 6 on the steel plate 2. This design not only helps to ensure the accurate positioning between the steel plate 2 and the connecting plate 1, but also provides a certain pre-tightening force to enhance the stability of the structure.
[0036] Threaded holes three are formed on both the square block 1 31 and the square block 2 32 .
[0037] The outer sides of the connecting plate 1 and the steel plate 2 are respectively in contact with a square block 1 31 and a square block 2 32 .
[0038] The square block 1 31 and the square block 2 32 are screwedly fixed to the threaded hole 1 5 opened on the connecting plate 1 and the threaded hole 2 6 opened on the steel plate 2 respectively by screws or bolts.
[0039] Working principle: Please refer to Figure 1-Figure 5 As shown, first, ensure that all components, including the connecting plate 1, steel plate 2, fixing plate 3 (including square block 1 31 and square block 2 32), and limiting posts 4, are fully assembled and inspected for quality and dimensions. Then, perform preliminary assembly: tightly align the inner side of the steel plate 2 with the outer side of the connecting plate 1. Next, insert the limiting posts 4 into the threaded holes 6 in the steel plate 2, ensuring that the outer sidewalls of the limiting posts 4 fit tightly against the inner sidewalls of the threaded holes 6. This step helps to initially secure the relative positions of the steel plate 2 and connecting plate 1.
[0040] After plugging in the required two steel plates, the next step is to fix and install the square block 1 31 tightly against the outside of the connecting plate 1, and the square block 2 32 tightly against the outside of the steel plate 2. Then, use screws or bolts to thread the threaded holes 3 on the square block 1 31 and the square block 2 32, and respectively fix them with the threaded holes 1 5 on the connecting plate 1 and the threaded holes 2 6 on the steel plate 2. This step ensures the firmness and stability of the entire structure. Finally, the entire structure is checked to ensure that all components are correctly installed and fixed. If necessary, make appropriate adjustments to ensure the accuracy and stability of the structure. Through the above steps, the new steel plate pre-buried structure for the logistics channel provided in this embodiment is successfully installed and put into use. The structure not only has high strength and stability, but is also easy to install and adjust, and is suitable for the construction needs of various logistics channels.
Claims
1. The logistics channel uses new steel plates to construct embedded structures, including: A connecting plate (1) is characterized in that a steel plate (2) is provided on the outer side of the connecting plate (1), a fixing plate (3) is attached to the outer sides of the connecting plate (1) and the steel plate (2), a limiting column (4) is fixed on one side of the connecting plate (1); threaded holes (5) are equidistantly provided on one side of the connecting plate (1); threaded holes (6) are equidistantly provided on the inner side of the steel plate (2); the fixing plate (3) includes a square block (31), the square block (31) is tightly attached to one side of the connecting plate (1), and a square block (32) is fixed on the outer side of the square block (31).
2. The new steel plate pre-buried structure for logistics channel according to claim 1 is characterized in that: Several groups of limiting columns (4) are fixed on the connecting plate (1), and the several groups of limiting columns (4) are respectively arranged in a longitudinal or transverse mirror image manner.
3. The new steel plate pre-buried structure for logistics channel according to claim 1 or 2, characterized in that: The internal connection relationship between the limiting column (4) and the second threaded hole (6) is plug-in.
4. The new steel plate pre-buried structure for logistics channel according to claim 3 is characterized in that: The outer wall of the limiting column (4) is tightly fitted with the inner wall of the second threaded hole (6).
5. The new steel plate pre-buried structure for logistics channel according to claim 1 is characterized in that: The square block 1 (31) and the square block 2 (32) are both provided with threaded holes 3.
6. The new steel plate pre-buried structure for logistics channel according to claim 5 is characterized in that: The outer sides of the connecting plate (1) and the steel plate (2) are respectively in contact with a square block 1 (31) and a square block 2 (32).
7. The new steel plate pre-buried structure for logistics channel according to claim 1 or 6, characterized in that: The square block 1 (31) and the square block 2 (32) are respectively threadedly fixed to the threaded hole 1 (5) opened on the connecting plate (1) and the threaded hole 2 (6) opened on the steel plate (2) by screws or bolts.