Quickly-assembled elevator shaft construction operation platform

Through the quickly assembled elevator shaft construction operation platform, the complex and costly construction of elevator shafts in high-rise buildings is solved, and a safe and economical construction effect is achieved.

CN223241047UActive Publication Date: 2025-08-19HENAN YUEJU CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422302548.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-08-19
Estimated Expiration
2034-09-20

AI Technical Summary

Technical Problem

When the elevator shaft construction of existing Class I high-rise buildings uses full-house scaffolding, the process is complicated and the cost is high.

Method used

A quick assembly elevator shaft construction operation platform is adopted, including the bottom channel steel oblique brace, oblique brace connecting steel pipe, vertical support steel pipe, lower and upper horizontal support steel pipes, which are lifted and stuck to the concrete beams and concrete walls of the elevator shaft to form a support structure to carry out the construction of concrete components.

Benefits of technology

It has achieved safe and economical elevator shaft construction, reduced costs and improved construction efficiency, and met the requirements of green construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223241047U_ABST
    Figure CN223241047U_ABST
Patent Text Reader

Abstract

The utility model discloses a quickly assembled elevator shaft construction operation platform which comprises a bottom channel steel inclined strut, an inclined strut connecting steel pipe, a vertical supporting steel pipe, a lower horizontal supporting steel pipe and an upper horizontal supporting steel pipe, a V-shaped clamping groove is formed in the bottom end of the bottom channel steel inclined strut, and the V-shaped clamping groove is connected to a concrete beam supporting position on one side in a shaft in a clamped mode. The upper end of the bottom steel channel inclined strut is connected with a concrete wall supporting position on the other side in the shaft, the inclined strut connecting steel pipes are evenly arranged on the top of the bottom steel channel inclined strut, the vertical supporting steel pipes are arranged in the vertical direction, and the lower portions of the vertical supporting steel pipes are connected with the bottom steel channel inclined strut. The lower horizontal supporting steel pipe and the upper horizontal supporting steel pipe are arranged on the lower portion and the upper portion of the vertical supporting steel pipe respectively, the top of the upper horizontal supporting steel pipe is further in lap joint with a supporting wood plate, and a lifting hook is further arranged on the top of the vertical supporting steel pipe. The problems that when all-round scaffolds are adopted for elevator shaft construction of existing high-rise buildings, the technology is complex, and cost is high are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a field, in particular to a fast-assembly elevator shaft construction operation platform. Background Art

[0002] Since the 21st century, my country's rapid economic development has led to rising demands for living conditions, the expansion of cities, and a growing urban population, resulting in a continued surge in demand for urban housing. The construction industry needs to apply new construction technologies to meet this demand. Furthermore, given limited land resources, high-rise buildings can be constructed to meet housing needs and effectively utilize land resources. High-formwork construction technology is a widely used construction technique. Its development offers new opportunities for construction projects and represents a novel approach to civil engineering. While effective application of high-formwork construction technology can improve project quality and ensure the safety of construction workers, this technology still has limitations. The overall construction process is complex and subject to numerous restrictive factors. Therefore, construction companies need to effectively understand key construction techniques, thoroughly explore the application of high-formwork construction technology, and develop targeted measures to ensure construction quality.

[0003] In a type of high-rise building, the elevator shaft is a core tube concrete structure, and its height exceeds the requirements of the "Safety Technical Specifications for Coupler-Type Steel Pipe Scaffolding in Building Construction" (JGJ130-2011). It is not convenient to use full-height scaffolding for construction. Even if full-height scaffolding is used for construction, the height of each floor cannot exceed 20m. It needs to be erected in sections, which is complicated and expensive, and very uneconomical. In order to facilitate the construction of elevator shafts in such buildings, a new construction tool needs to be proposed to meet the corresponding construction needs. Utility Model Content

[0004] The purpose of the utility model is to provide a fast-assembly elevator shaft construction operation platform to solve the problem of complex process and high cost when the elevator shaft construction of a type of high-rise building adopts full-height scaffolding.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A quickly assembled elevator shaft construction operation platform includes a bottom channel steel diagonal brace, a diagonal brace connecting steel pipe, a vertical support steel pipe, a lower horizontal support steel pipe and an upper horizontal support steel pipe. The bottom end of the bottom channel steel diagonal brace is provided with a "V"-shaped slot, and the "V"-shaped slot is connected to the concrete beam support on one side of the shaft. The upper end of the bottom channel steel diagonal brace is connected to the concrete wall support on the other side of the shaft. The diagonal brace connecting steel pipes are evenly arranged on the top of the bottom channel steel diagonal brace. The vertical support steel pipe is arranged vertically, and the lower part of the vertical support steel pipe is connected to the bottom channel steel diagonal brace. The lower horizontal support steel pipe and the upper horizontal support steel pipe are respectively arranged at the lower and upper parts of the vertical support steel pipe. The top of the upper horizontal support steel pipe is also overlapped with a supporting wooden board, and the top of the vertical support steel pipe is also provided with a hook.

[0007] When installing the elevator shaft construction operation platform, use a tower crane to hook the hook, then hoist the elevator shaft construction operation platform to the elevator shaft construction area, and then slowly lower it so that the reserved "V"-shaped slot at the lower end of the bottom channel steel diagonal brace is stuck to the door head concrete beam of the elevator shaft, and the reserved inclined surface at the upper end of the bottom channel steel diagonal brace is placed on the concrete wall, thus forming a supporting structure, on which the construction of this layer of concrete components can be carried out; after the construction of this layer of concrete components is completed, wait until the formwork is removed and the garbage and other materials on the platform are cleared, and the subsequent installation of each layer is similar;

[0008] After the construction of the last floor is completed, the elevator shaft construction operation platform will be hoisted out of the elevator shaft, placed at the designated location, cleaned up the garbage and dismantled. The construction of the machine room floor uses the original 16#a channel steel as support and is placed on the concrete components of the elevator shaft. A hole is reserved here to facilitate later demolition. After the 16#a channel steel of the machine room floor is dismantled, the garbage is cleaned up and dismantled for later turnover use.

[0009] The use of this elevator shaft construction operation platform ensures safety, reduces costs, achieves green construction, and improves overall benefits.

[0010] As a further preferred embodiment of the present invention, each support member of the bottom channel steel diagonal brace is formed by two channel steels stacked up and down, and a steel bar cut is fully welded between the two channel steels.

[0011] When welding broken steel bars onto channel steel, the weld must be complete.

[0012] As a further preferred embodiment of the present invention, the broken end of the steel bar is welded to the channel steel on both sides, and the broken end of the steel bar is also welded to the lower part of the vertical supporting steel pipe.

[0013] As a further preferred embodiment of the present invention, the specification of the channel steel is 160*63*6.5mm

[0014] As a further preferred embodiment of the present invention, the supporting wooden board and the upper horizontal supporting steel pipe are bound together by iron wire, and the iron wire is No. 8 iron wire.

[0015] As a further preferred embodiment of the present invention, the specification of the steel pipe is φ48*3.2mm.

[0016] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:

[0017] 1. Under the combined action of 1.3 times the constant load + 1.5 times the live load, the operating platform's bending, shear, deflection, support reaction and other stress conditions all meet the requirements of the specifications.

[0018] 2. Using this elevator shaft construction operation platform ensures safety, reduces costs, achieves green construction, and improves overall benefits.

[0019] 3. Simple structure and easy to make. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a top view of the utility model.

[0021] Figure 2 This is a cross-sectional view of the utility model. DETAILED DESCRIPTION

[0022] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.

[0023] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but rather merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0024] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0025] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined or explained in subsequent drawings.

[0026] In the description of the present invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," "outer," and the like, indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the product of the present invention is typically placed when in use, or are the orientations or positional relationships commonly understood by those skilled in the art. These terms are intended solely to facilitate the description of the present invention and to simplify the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used solely to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0027] It should also be noted that, in the description of this utility model, unless otherwise expressly specified or limited, the terms "disposed," "installed," "connected," and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections, electrical connections; direct connections, indirect connections through an intermediate medium, and internal connections between two components. Those skilled in the art will understand the specific meanings of the above terms in this utility model based on the specific circumstances. Specific embodiment 1:

[0029] Figure 1 、 Figure 2 The utility model shows a kind of fast-assembly elevator shaft construction operation platform, comprising a bottom channel steel diagonal brace 1, a diagonal brace connecting steel pipe 2, a vertical support steel pipe 3, a lower horizontal support steel pipe 4 and an upper horizontal support steel pipe 5. The bottom end of the bottom channel steel diagonal brace 1 is provided with a "V"-shaped slot 11, and the "V"-shaped slot 11 is clamped in the concrete beam support on one side of the shaft, and the upper end of the bottom channel steel diagonal brace 1 is connected to the concrete wall support on the other side of the shaft. The diagonal brace connecting steel pipe 2 is evenly arranged on the top of the bottom channel steel diagonal brace 1, and the vertical support steel pipe 3 is arranged vertically. The lower part of the vertical support steel pipe 3 is connected to the bottom channel steel diagonal brace 1, and the lower horizontal support steel pipe 4 and the upper horizontal support steel pipe 5 are respectively arranged at the lower and upper parts of the vertical support steel pipe 3. The top of the upper horizontal support steel pipe 5 is also overlapped with a supporting wooden board 6, and the top of the vertical support steel pipe 3 is also provided with a hook 7.

[0030] When installing the elevator shaft construction operation platform, use a tower crane to hook the hook, then hoist the elevator shaft construction operation platform to the elevator shaft construction area, and then slowly lower it so that the reserved "V"-shaped slot at the lower end of the bottom channel steel diagonal brace is stuck to the door head concrete beam of the elevator shaft, and the reserved inclined surface at the upper end of the bottom channel steel diagonal brace is placed on the concrete wall, thus forming a supporting structure, on which the construction of this layer of concrete components can be carried out; after the construction of this layer of concrete components is completed, wait until the formwork is removed and the garbage and other materials on the platform are cleared, and the subsequent installation of each layer is similar;

[0031] After the construction of the last floor is completed, the elevator shaft construction operation platform will be hoisted out of the elevator shaft, placed at the designated location, cleaned up the garbage and dismantled. The construction of the machine room floor uses the original 16#a channel steel as support and is placed on the concrete components of the elevator shaft. A hole is reserved here to facilitate later demolition. After the 16#a channel steel of the machine room floor is dismantled, the garbage is cleaned up and dismantled for later turnover use.

[0032] The use of this elevator shaft construction operation platform ensures safety, reduces costs, achieves green construction, and improves overall benefits. Specific embodiment 2:

[0034] This embodiment further illustrates the bottom channel steel brace 1 based on the specific embodiment 1. Each support member of the bottom channel steel brace 1 is composed of two channel steels stacked up and down, and a steel bar end 8 is fully welded between the two channel steels.

[0035] When welding broken steel bars onto channel steel, the weld must be complete. Specific embodiment 3:

[0037] This embodiment further illustrates the broken steel bar head 8 based on the specific embodiment 2. The broken steel bar head 8 is welded to the channel steel on both sides and is also welded to the lower part of the vertical supporting steel pipe 3.

[0038] The bottom channel steel diagonal brace and the vertical supporting steel pipe are welded on both sides. Specific embodiment 4:

[0040] This embodiment further illustrates the channel steel based on the specific embodiment 2, and the specification of the channel steel is 160*63*6.5mm. Specific embodiment 5:

[0042] This embodiment further illustrates the supporting wooden board 6 based on the specific embodiment 1. The supporting wooden board 6 and the upper horizontal supporting steel pipe 5 are bound together by iron wire, and the iron wire is No. 8 iron wire. Specific embodiment 6:

[0044] This embodiment further illustrates the steel pipe based on the specific embodiment 1. The specification of the steel pipe is φ48*3.2mm.

[0045] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A fast-assembly elevator shaft construction operation platform, characterized by: The invention comprises a bottom channel steel diagonal brace (1), a diagonal brace connecting steel pipe (2), a vertical support steel pipe (3), a lower horizontal support steel pipe (4) and an upper horizontal support steel pipe (5), wherein the bottom end of the bottom channel steel diagonal brace (1) is provided with a "V"-shaped card slot (11), and the "V"-shaped card slot (11) is connected to the concrete beam support on one side of the well, and the upper end of the bottom channel steel diagonal brace (1) is connected to the concrete wall support on the other side of the well, and the diagonal brace connecting steel pipe (2) is evenly connected to the bottom of the well. The vertical support steel pipe (3) is arranged on the top of the bottom channel steel diagonal brace (1), the vertical support steel pipe (3) is arranged vertically, the lower part of the vertical support steel pipe (3) is connected to the bottom channel steel diagonal brace (1), the lower horizontal support steel pipe (4) and the upper horizontal support steel pipe (5) are respectively arranged on the lower part and the upper part of the vertical support steel pipe (3), the top of the upper horizontal support steel pipe (5) is also overlapped with a supporting wooden board (6), and the top of the vertical support steel pipe (3) is also provided with a hook (7).

2. The fast-assembly elevator shaft construction operation platform according to claim 1, characterized in that: Each support member of the bottom channel steel diagonal brace (1) is formed by stacking two channel steels one above the other, with a steel bar cutout (8) fully welded between the two channel steels.

3. The fast-assembly elevator shaft construction operation platform according to claim 2, characterized in that: The steel bar broken end (8) is welded to the channel steel on both sides, and the steel bar broken end (8) is also welded to the lower part of the vertical supporting steel pipe (3).

4. The fast-assembly elevator shaft construction operation platform according to claim 2, characterized in that: The specifications of the channel steel are 160*63*6.5mm.

5. The fast-assembly elevator shaft construction operation platform according to claim 1 is characterized in that: The supporting wooden board (6) and the upper horizontal supporting steel pipe (5) are bound together by iron wire, and the iron wire is No. 8 iron wire.

6. The fast-assembly elevator shaft construction operation platform according to claim 1, characterized in that: The specification of the steel pipe is φ48*3.2mm.