Reinforcing steel bar butt joint auxiliary device

Through the design of positioning sleeves and matching sleeves, the problems of cumbersome process and large site occupation in steel bar docking are solved, and high-precision and high-efficiency steel bar docking are achieved, saving site and improving construction efficiency.

CN223250440UActive Publication Date: 2025-08-22CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421836164.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-08-22
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

Among the existing steel bar docking methods, the short-term matching method has cumbersome process and poor positioning accuracy, and the long-term matching method occupies a large construction site and has high overall costs.

Method used

The positioning sleeve and the matching sleeve are connected through the wire hole, and the locking mother and support frame are used to realize the indirect transmission of the steel wire head information, ensuring the accuracy of the wire, avoiding traditional long- or short-term matching production, saving space and improving efficiency.

Benefits of technology

It achieves high accuracy and high efficiency of steel bar docking, saves 50%-80% of the workshop processing site, improves construction efficiency by 50%, and ensures inherent safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223250440U_ABST
    Figure CN223250440U_ABST
Patent Text Reader

Abstract

The utility model provides a steel bar butt joint auxiliary device which comprises a positioning sleeve, a steel bar butt joint auxiliary device and a steel bar butt joint auxiliary device. The end, away from the positioning sleeve, of the matching sleeve is provided with a screw hole used for transmitting collected information to a next section of steel bar screw head. The lock nut is detachably arranged at the opposite ends of the positioning sleeve and the matching sleeve in a sleeving manner and is used for connecting the positioning sleeve and the matching sleeve; the supporting frame is provided with a mounting hole allowing the matched sleeve to penetrate through and is provided with a fastening assembly used for locking the matched sleeve; and the positioning sleeve is in threaded connection with the screw hole of the matching sleeve. The information of the previous section of steel bar wire head is obtained through the positioning sleeve, and the information of the wire head is transmitted to the next section of steel bar wire head through the matching sleeve communicated with the wire hole of the positioning sleeve, so that an indirect matching effect can be realized, the wire alignment precision between steel bars is ensured, and a manufactured steel bar product part does not need to be moved; and a long-line or short-line matching manufacturing method required by traditional straight thread connection is replaced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of steel bar butt jointing, in particular to a steel bar butt jointing auxiliary device. Background Art

[0002] Prefabricated rebar components typically utilize mechanical connection methods to connect the upper and lower segments. Currently, the most popular rebar connectors include straight thread sleeves, straight extrusion sleeves, and tapered extrusion sleeves. Straight thread sleeves are widely used due to their low cost and high installation efficiency. Straight thread sleeve connections require two conditions: high-precision rebar positioning and matching of the rebar threads. They are generally suitable for loose-tying single rebar. The use of straight threads in prefabricated rebar components typically requires a pre-matching process. This process is performed in a short-line or long-line matching method, which is then removed from the pre-connected sleeves and installed on-site. The short-line matching method utilizes two prefabrication stations. Before the lower segment is fabricated, the upper segment must be hoisted to the matching station to reserve space for prefabrication. This process is cumbersome, with poor positioning accuracy and low construction efficiency. The long-line matching method typically utilizes multiple prefabrication stations, which occupies a large construction site and results in high overall costs. Therefore, a rebar connection assistance device has been proposed to address these issues. Utility Model Content

[0003] The main purpose of the utility model is to provide a steel bar butt joint auxiliary device to solve the problems of the existing steel bar butt jointing, such as the short-line matching method having a cumbersome process, poor positioning accuracy, and low construction efficiency, and the long-line matching method occupying a large construction site and having a high overall cost.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a steel bar butt joint auxiliary device, comprising:

[0005] A positioning sleeve, the end of which is provided with a wire hole for collecting the information of the previous section of steel wire head;

[0006] The matching sleeve has a thread hole at the end away from the positioning sleeve for transmitting the collected information to the next section of the steel wire head;

[0007] A lock nut, which is detachably mounted on opposite ends of the positioning sleeve and the matching sleeve to connect the two;

[0008] A support frame is provided with a mounting hole for the matching sleeve to pass through, and a fastening assembly for locking the matching sleeve;

[0009] The positioning sleeve is connected to the threaded hole of the matching sleeve.

[0010] In a preferred embodiment, the positioning sleeve and the matching sleeve are detachably arranged in the lock nut by threaded installation.

[0011] In a preferred embodiment, matching docking steps are provided at opposite ends of the positioning sleeve and the matching sleeve.

[0012] In a preferred embodiment, the fastening assembly includes a fastening screw hole that is arranged through the top of the mounting hole, and a fastening screw for locking the matching sleeve is threadedly arranged in the fastening screw hole.

[0013] In a preferred embodiment, the support frame is composed of a base and a vertical plate erected on the middle of the base, and the mounting hole is provided on the vertical plate.

[0014] In a preferred embodiment, a rubber pad is fixed to the bottom end of the fastening screw.

[0015] In a preferred embodiment, a circular bubble level is provided on the base for determining the horizontality of the support frame.

[0016] The utility model provides a steel bar connection auxiliary device, which obtains the information of the steel bar thread head of the previous section through a positioning sleeve, and uses the matching sleeve connected to its thread hole to transmit the thread head information to the steel bar thread head of the next section, thereby achieving an indirect matching effect, ensuring the thread matching accuracy between the steel bars, and eliminating the need to move the completed steel bar parts, thereby replacing the traditional straight thread connection that requires long or short line matching production methods, saving workshop steel bar processing space, greatly improving construction efficiency and quality, and ensuring inherent safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0018] Figure 1 This is the overall structure assembly diagram of the utility model;

[0019] Figure 2 This utility model Figure 1 Schematic diagram from another perspective;

[0020] Figure 3 This is an exploded view of the overall structure of the utility model;

[0021] Figure 4 This is a schematic diagram of the stepped connection relationship between the positioning sleeve and the matching sleeve of the utility model;

[0022] Figure 5 This is a side structural sectional view of the utility model;

[0023] In the figure: support frame 1; base 101; vertical plate 102; mounting hole 2; matching sleeve 3; positioning sleeve 4; docking step 5; lock nut 6; limit block 601; fastening screw hole 7; fastening screw 8; limit slot 9. DETAILED DESCRIPTION

[0024] like Figure 1-5As shown, a steel bar joint auxiliary device includes a positioning sleeve 4, a matching sleeve 3, a lock nut 6 and a support frame 1. The lock nut 6 is detachably mounted on the opposite ends of the positioning sleeve 4 and the matching sleeve 3. The positioning sleeve 4 and the matching sleeve 3 can be connected by the lock nut 6. The separated ends of the positioning sleeve 4 and the matching sleeve 3 are both provided with wire holes for connecting steel wire heads. The threads of the two wire holes are connected, wherein the positioning sleeve 4 is used to collect information about the steel wire head of the previous section, and the matching sleeve 3 is used to transmit the information to the steel wire head of the next section. The support frame 1 is composed of a base 101 and a vertical plate 102 erected in the middle of the base 101. The vertical plate 102 is provided with a mounting hole 2 for the matching sleeve 3 to pass through.

[0025] A fastening assembly for locking the matching sleeve 3 is provided on the plate 102 .

[0026] When in use, the opposite ends of the positioning sleeve 4 and the matching sleeve 3 are connected by the lock nut 6, and then the thread hole of the positioning sleeve 4 is put onto the steel wire head of the previous section to complete the information collection of the steel wire head of the previous section, and then the support frame 1 is put on the outside of the matching sleeve 3 through the mounting hole 2 and fastened with the fastening assembly. After the fastening is completed, the positioning sleeve 4 is removed, and then the support frame 1 and the matching sleeve 3 are positioned and installed on the tire frame for installing the next section of steel bars. At this time, the information of the steel wire head of the previous section is left and transmitted to the tire frame, and the indirect matching of the steel bars can be completed by directly screwing the steel wire head of the next section into the thread hole of the matching sleeve 3, thereby ensuring the wire matching accuracy between the steel bars. In this embodiment, the thread position information of the steel wire head is effectively transmitted through the positioning sleeve 4 and the matching sleeve 3, thereby solving the problem of thread matching.

[0027] It should be noted that the support frame 1 can be fixed to the steel frame by means of steel wire binding. In addition, when fixing the support frame 1 and the matching sleeve 3, it is necessary to ensure that the support frame 1 is perpendicular to the frame to avoid angle deviation and the problem of information transmission deviation in the matching sleeve 3 when it is installed on the frame.

[0028] In the preferred embodiment, the positioning sleeve 4 and the matching sleeve 3 are detachably arranged in the lock nut 6 through threaded installation, and matching docking steps 5 are provided at the opposite ends of the two, and matching spiral wires are provided on the outside. The setting of the docking steps 5 facilitates to improve the locking strength of the lock nut 6 on the positioning sleeve 4 and the matching sleeve 3, and at the same time ensures that when the positioning sleeve 4 and the matching sleeve 3 are connected, the threads of the thread holes of the two are connected to avoid information transmission errors. When the lock nut 6 connects the positioning sleeve 4 and the matching sleeve 3, the central axes of the two are connected, and at the same time, they are connected through the threads of the thread holes of the two, thereby achieving the effect of transmitting the thread position information.

[0029] It should be noted that when the support frame 1 is mounted on the outside of the matching sleeve 3 , the spiral thread of the matching sleeve 3 outside the mounting hole 2 meets the requirement that the lock nut 6 rotates out of the positioning sleeve 4 .

[0030] In the preferred embodiment, the fastening assembly includes a fastening screw hole 7 that passes through the top of the mounting hole 2, and a fastening screw 8 is threaded in the fastening screw hole 7 for locking the matching sleeve 3. The bottom end of the fastening screw 8 is in contact with the matching sleeve 3 to achieve the locking effect.

[0031] A rubber pad is fixed to the bottom end of the fastening screw 8 to protect the exterior of the matching sleeve 3 .

[0032] In a preferred embodiment, a circular bubble level 9 for determining the horizontality of the support frame 1 is provided on the base 101 of the support frame 1 .

[0033] This device replaces the traditional straight-thread connection method, which requires long or short matching wires. It achieves in-situ rebar production, saving workshop rebar processing space, significantly improving construction efficiency and quality, ensuring inherent safety, and increasing on-site rebar construction efficiency by 50%. Compared to the large space required for short or long matching wires, this technology can save 50%-80% of the rebar prefabrication site and improve in-plant production efficiency by 30%.

[0034] The above embodiments are merely preferred technical solutions of the present invention and should not be construed as limiting the present invention. The scope of protection of the present invention shall be the technical solutions set forth in the claims, including equivalent alternatives to the technical features of the technical solutions set forth in the claims. Equivalent alternatives and improvements within this scope are also within the scope of protection of the present invention.

Claims

1. A steel bar butt joint auxiliary device, characterized in that: include: A positioning sleeve (4), the end of which is provided with a wire hole for collecting information of the previous section of steel wire head; The matching sleeve (3) is provided with a wire hole at the end away from the positioning sleeve (4) for transmitting the collected information to the next section of the steel wire head; A lock nut (6) is detachably mounted on opposite ends of the positioning sleeve (4) and the matching sleeve (3) to connect the two; A support frame (1) is provided with a mounting hole (2) for the matching sleeve (3) to pass through, and a fastening assembly for locking the matching sleeve (3); The positioning sleeve (4) is connected to the threaded hole of the matching sleeve (3) by thread; Matching docking steps (5) are provided at opposite ends of the positioning sleeve (4) and the matching sleeve (3).

2. The steel bar butt joint auxiliary device according to claim 1, characterized in that: The positioning sleeve (4) and the matching sleeve (3) are detachably arranged in the lock nut (6) through threaded installation.

3. A steel bar butt joint auxiliary device according to claim 1 or 2, characterized in that: The fastening assembly comprises a fastening screw hole (7) penetrating the top of the mounting hole (2), and a fastening screw (8) for locking the matching sleeve (3) is threadedly provided in the fastening screw hole (7).

4. The steel bar butt joint auxiliary device according to claim 3, characterized in that: The support frame (1) is composed of a base (101) and a vertical plate (102) erected on the middle of the base (101), and the mounting hole (2) is opened on the vertical plate (102).

5. The steel bar butt joint auxiliary device according to claim 3, characterized in that: A rubber pad is fixed to the bottom end of the fastening screw (8).

6. The reinforcement bar butt joint auxiliary device according to claim 4, characterized in that: A circular bubble level (9) for determining the horizontality of the support frame (1) is provided on the base (101).