Construction project marking device

By introducing a paint delivery structure with a storage tank and a stirring component into the marking machine, the problem of raw material sedimentation is solved, the marking quality and mobility are improved, and a compact and easy-to-use marking device is realized.

CN223317055UActive Publication Date: 2025-09-09SHANDONG TONGHAI CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422701989.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2025-09-09
Estimated Expiration
2034-11-06

AI Technical Summary

Technical Problem

The existing marking machine does not have the function of stirring the raw materials, which causes the raw materials to settle, affecting the marking quality and efficiency. At the same time, the equipment is large and not easy to move.

Method used

A paint conveying structure including a storage tank, a stirring assembly, a moving wheel and a supporting assembly is designed. The stirring assembly prevents the paint from settling, and the moving wheel and the supporting assembly enable the device to be easily moved.

Benefits of technology

The paint has good fluidity, ensuring the marking quality. At the same time, the device is small and easy to move, which improves work efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223317055U_ABST
    Figure CN223317055U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction project marking device which comprises a moving frame, moving wheels are arranged on the two sides of the lower end of the moving frame, and a coating conveying structure is arranged on one side of the moving frame. The coating conveying structure comprises a storage tank body, a connecting pipe, a first control valve, a conveying tank body, a spray head pipe, a second control valve, a stirring assembly, a mounting plate, a mobile power supply, an air pump and a supporting assembly. The utility model relates to the technical field of scribing equipment, the paint conveying structure is adopted, when the paint conveying structure is used, paint is temporarily stored through the arranged storage tank body, through the arranged stirring assembly, automatic stirring operation on the paint can be achieved, the flowing effect of the paint is guaranteed, the overall quality of scribing is guaranteed, and the paint conveying structure is small in overall size, convenient to use and high in practicability. And through cooperation of the arranged moving wheels and the supporting assembly, rapid movement of the device can be achieved, and the use convenience of the marking device is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of marking equipment, in particular to a construction engineering marking device. Background Art

[0002] Construction road marking machines are widely used in roads, highways, parking lots, squares and runways to mark different restrictions, guidance and warning signs on flat surfaces.

[0003] However, most of the existing marking machines do not have the function of stirring raw materials. The raw materials in the raw material storage tank are prone to sedimentation during marking, which is not conducive to the flow of raw materials, resulting in poor line segments drawn by the marking machine, affecting work quality and efficiency. In addition, the overall size of the current marking machines is relatively large, which is not conducive to movement within the site. In view of this, there may be technical means to solve the above problems in the existing technology, but this case intends to provide an alternative or replacement technical solution. Utility Model Content

[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: A construction engineering marking device includes a mobile frame, wherein both sides of the lower end of the mobile frame are provided with moving wheels, and one side of the mobile frame is provided with a paint conveying structure;

[0005] The paint delivery structure includes: a storage tank, a connecting pipe, a first control valve, a delivery tank, a nozzle pipe, a second control valve, an agitation component, a mounting plate, a mobile power supply, an air pump and a support component;

[0006] The storage tank body is fixedly mounted on one side of the mobile frame, one end of the connecting pipe is connected to the lower end of the storage tank body, the first control valve is mounted on the upper end of the connecting pipe, the conveying tank body is fixedly mounted on the lower end of one side of the mobile frame and is connected to the lower end of the connecting pipe, the nozzle pipe is mounted on the lower end of the conveying tank body, the second control valve is mounted on the upper end of the nozzle pipe, the stirring assembly is mounted on the upper end of the storage tank body, the mounting plate is fixedly mounted on the other side of the mobile frame, the mobile power supply and the air pump are both mounted on the upper end of the mounting plate, the air outlet end of the air pump is connected to one side of the conveying tank body, and the support assembly is mounted on the lower end of one side of the mounting plate.

[0007] Preferably, the stirring assembly comprises: a motor, a transmission rod, a stirring rod and two bevel gears;

[0008] The motor is mounted on the upper end of the movable frame, one end of the transmission rod is connected to the motor driving end, and the other end is movably embedded in a side wall of the storage tank body, the upper end of the stirring rod is movably embedded in the center of the upper wall of the storage tank body, and the two bevel gears are respectively mounted on the transmission rod and the upper end of the stirring rod and mesh with each other.

[0009] Preferably, the support assembly comprises: two mounting sleeves and two support frames;

[0010] The two installation sleeves are respectively installed at two ends of a wall surface on one side of the installation plate, and one end of the two support frames is respectively movably embedded in the two installation sleeves.

[0011] Preferably, a moving handle is provided on one side of the upper end of the moving frame.

[0012] Preferably, a positioning pin is movably embedded in the installation sleeve.

[0013] Beneficial effects

[0014] The present invention provides a construction project marking device, which has the following beneficial effects: the paint conveying structure adopted in this case temporarily stores the paint through the provided storage tank during use, and the provided stirring component can realize the automatic stirring operation of the paint, thereby ensuring the flow effect of the paint and the overall quality of the marking. The overall size of the device is small, and the provided moving wheels cooperate with the support component to realize the rapid movement of the device, thereby ensuring the convenience of use of the marking device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the main three-dimensional structure of a construction engineering marking device described in the present invention.

[0016] Figure 2 This is a rear perspective structural diagram of a construction engineering marking device described in the present invention.

[0017] Figure 3 This is a schematic diagram of the main cross-sectional structure of a construction engineering marking device described in the present utility model.

[0018] In the figure: 1. Mobile frame, 2. Mobile wheel, 3. Storage tank, 4. Connecting pipe, 5. First control valve, 6. Conveying tank, 7. Nozzle pipe, 8. Second control valve, 9. Mounting plate, 10. Mobile power supply, 11. Air pump, 12. Motor, 13. Transmission rod, 14. Stirring rod, 15. Bevel gear, 16. Mounting sleeve, 17. Support frame, 18. Mobile handle, 19. Positioning pin. DETAILED DESCRIPTION

[0019] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of the present invention.

[0020] Example: See Figure 1-3, a construction engineering marking device, comprising a mobile frame 1, mobile wheels 2 are provided on both sides of the lower end of the mobile frame 1, and a paint conveying structure is provided on one side of the mobile frame 1;

[0021] The paint delivery structure includes: a storage tank 3, a connecting pipe 4, a first control valve 5, a delivery tank 6, a nozzle pipe 7, a second control valve 8, an agitation component, a mounting plate 9, a mobile power supply 10, an air pump 11, and a support component;

[0022] The storage tank body 3 is fixedly installed on one side of the mobile frame 1, one end of the connecting pipe 4 is connected to the lower end of the storage tank body 3, the first control valve 5 is installed on the upper end of the connecting pipe 4, the conveying tank body 6 is fixedly installed on the lower end of one side of the mobile frame 1, and is connected to the lower end of the connecting pipe 4, the nozzle pipe 7 is installed at the lower end of the conveying tank body 6, the second control valve 8 is installed at the upper end of the nozzle pipe 7, the stirring assembly is installed at the upper end of the storage tank body 3, the mounting plate 9 is fixedly installed on the other side of the mobile frame 1, the mobile power supply 10 and the air pump 11 are both installed on the upper end of the mounting plate 9, the air outlet end of the air pump 11 is connected to one side of the conveying tank body 6, and the support assembly is installed at the lower end of one side of the mounting plate 9.

[0023] When marking a construction project, the staff injects the paint into the storage tank 3, powers the stirring assembly through the mobile power supply 10 on the side of the mounting plate 9, and stirs the paint in the storage tank 3 through the stirring assembly to prevent the paint from settling. Then, by opening the first control valve 5 at the upper end of the connecting pipe 4, the paint in the storage tank 3 is transported to the delivery tank 6, and then the first control valve 5 is closed, and the air pump 11 on the side of the mounting plate 9 is operated to transport gas to the delivery tank 6, so that the air pressure in the delivery tank 6 is increased, and then the device is moved to the designated position by the moving wheel 2 at the lower end of the moving frame 1. When marking is required, the staff opens the second control valve 8, and sprays the paint and high-pressure gas in the delivery tank 6 through the nozzle pipe 7 to perform marking operations on the designated position. When the device needs to be docked at the designated position, the support assembly is used to stably support the device.

[0024] In the specific implementation process, the stirring assembly includes: a motor 12, a transmission rod 13, a stirring rod 14 and two bevel gears 15;

[0025] The motor 12 is installed at the upper end of the mobile frame 1, one end of the transmission rod 13 is connected to the driving end of the motor 12, and the other end is movably embedded in the side wall of the storage tank body 3, and the upper end of the stirring rod 14 is movably embedded in the center of the upper wall of the storage tank body 3. Two bevel gears 15 are respectively installed on the upper ends of the transmission rod 13 and the stirring rod 14 and are engaged with each other.

[0026] When the paint is stirred, the motor 12 is operated to drive the transmission rod 13 to rotate in the storage tank 3. Under the mutual meshing action of the two bevel gears 15, the stirring rod 14 rotates in the storage tank 3 to stir the paint.

[0027] In the specific implementation process, the support assembly includes: two mounting sleeves 16 and two support frames 17;

[0028] The two mounting sleeves 16 are respectively mounted on both ends of a wall surface of one side of the mounting plate 9 , and one ends of the two support frames 17 are respectively movably embedded in the two mounting sleeves 16 .

[0029] When supporting the mobile frame 1, the two support frames 17 are respectively embedded in the two mounting sleeves 16, and then the positioning pins 19 are embedded in the mounting sleeves 16 and the support frames 17 to fix the support frames 17. The support frames 17 are in contact with the ground and cooperate with the mobile wheels 2 to support the device as a whole.

[0030] In the specific implementation process, a moving handle 18 is provided on one side of the upper end of the moving frame 1.

[0031] During the specific implementation process, a positioning pin 19 is movably embedded in the installation sleeve 16 .

[0032] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering marking device, comprising a movable frame (1), characterized in that: Both sides of the lower end of the movable frame (1) are provided with movable wheels (2), and one side of the movable frame (1) is provided with a paint conveying structure; The paint delivery structure comprises: a storage tank (3), a connecting pipe (4), a first control valve (5), a delivery tank (6), a nozzle pipe (7), a second control valve (8), an agitating assembly, a mounting plate (9), a mobile power supply (10), an air pump (11), and a supporting assembly; The storage tank body (3) is fixedly mounted on one side of the mobile frame (1), one end of the connecting pipe (4) is connected to the lower end of the storage tank body (3), the first control valve (5) is mounted on the upper end of the connecting pipe (4), the delivery tank body (6) is fixedly mounted on the lower end of one side of the mobile frame (1) and connected to the lower end of the connecting pipe (4), the nozzle pipe (7) is mounted on the lower end of the delivery tank body (6), the second control valve (8) is mounted on the upper end of the nozzle pipe (7), the stirring assembly is mounted on the upper end of the storage tank body (3), the mounting plate (9) is fixedly mounted on the other side of the mobile frame (1), the mobile power supply (10) and the air pump (11) are both mounted on the upper end of the mounting plate (9), the air outlet end of the air pump (11) is communicated with one side of the delivery tank body (6), and the support assembly is mounted on the lower end of one side of the mounting plate (9).

2. A construction engineering marking device according to claim 1, characterized in that: The stirring assembly comprises: a motor (12), a transmission rod (13), a stirring rod (14) and two bevel gears (15); The motor (12) is mounted on the upper end of the mobile frame (1); one end of the transmission rod (13) is connected to the driving end of the motor (12), and the other end is movably embedded in a side wall of the storage tank (3); the upper end of the stirring rod (14) is movably embedded in the center of the upper wall of the storage tank (3); and the two bevel gears (15) are respectively mounted on the upper ends of the transmission rod (13) and the stirring rod (14) and mesh with each other.

3. A construction engineering marking device according to claim 1, characterized in that: The support assembly comprises: two mounting sleeves (16) and two support frames (17); The two installation sleeves (16) are respectively installed at two ends of a wall surface on one side of the installation plate (9), and one end of the two support frames (17) is respectively movably embedded in the two installation sleeves (16).

4. A construction engineering marking device according to claim 1, characterized in that: A moving handle (18) is provided on one side of the upper end of the moving frame (1).

5. A construction engineering marking device according to claim 3, characterized in that: A positioning pin (19) is movably embedded in the installation sleeve (16).