Prefabricated formwork column installation and construction structure
The design of the auxiliary positioning mechanism solves the time-consuming problem of aligning the internal threaded pipe and the steel bar during the installation of the prefabricated formwork column, achieves rapid alignment and fixation, and improves construction efficiency.
Patent Information
- Application Number
- CN202422546463.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2034-10-22
AI Technical Summary
During the installation of prefabricated formwork columns, it takes a long time to align the internal threaded pipe with the steel bars, which affects construction efficiency.
An auxiliary positioning mechanism is adopted, including a base plate, a support rod and a support plate, and a combination of a trapezoidal rotating cutting groove and a semicircular groove is used to achieve rapid alignment and threaded connection between the internal threaded pipe and the steel bar.
The efficiency of prefabricated formwork column installation is improved, the alignment time is reduced, and the operation difficulty is simplified.
Smart Images

Figure CN223358540U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated formwork column installation and construction, in particular to a prefabricated formwork column installation and construction structure. Background Art
[0002] Precast formwork columns are a new type of structural component that emerged amidst the continuous development of prefabricated construction technology. With the advancement of building industrialization, prefabricated buildings, with their advantages of high efficiency, environmental protection, and energy conservation, are gradually becoming a development trend in the construction industry. As a key component of prefabricated buildings, precast formwork columns, through factory production and on-site assembly, effectively improve construction efficiency and quality, while reducing construction costs and environmental impact.
[0003] However, there are the following problems in the process of installing the prefabricated formwork columns:
[0004] After the prefabricated formwork column is hoisted, it is necessary to adjust the internal threaded tube at the lower end of the prefabricated formwork column and align the internal threaded tube with the fixed steel bars so that the internal threaded tube can be aligned with the upper end of the steel bars, which is convenient for threading the internal threaded tube with the thread groove on the steel bars. During this process, it takes a long time to align. Utility Model Content
[0005] In view of the deficiencies of the prior art, the utility model provides a prefabricated formwork column installation construction structure, which can quickly align and install the prefabricated formwork columns.
[0006] The utility model provides the following technical solutions: a prefabricated formwork column installation and construction structure, including a base, a plurality of steel bars fixedly connected to the base, a threaded groove provided on the surface of the steel bar, a prefabricated formwork column body matching therewith is threadedly connected to the threaded groove, a threaded rod matching the steel bar is provided at the lower end of the prefabricated formwork column body, an internal threaded tube is threadedly connected to the threaded rod, and four groups of auxiliary positioning mechanisms are provided on the base, and each group of auxiliary positioning mechanisms is composed of two identical parts.
[0007] Furthermore, both sides of the auxiliary positioning mechanism are fixedly connected with a fixing block with a round hole in the middle, and the two auxiliary positioning mechanisms are fixed to both sides of the steel bar by bolts and nuts.
[0008] Furthermore, the auxiliary positioning mechanism includes a base plate, a first groove is provided on the base plate, a support rod is fixedly connected to the upper end of the base plate, the upper end of the support rod is fixedly connected to the support plate, a trapezoidal rotation cutting groove is provided on the surface of the support plate, and a second groove is provided on the lower surface of the support plate, and the trapezoidal rotation cutting groove is connected to the second groove.
[0009] Furthermore, the cross section of the first groove is semicircular, and the two first grooves are combined to form a full circle, and the cross section of the full circle is the same as the cross section of the steel bar.
[0010] Furthermore, the cross section of the second groove is semicircular, and the cross section of the two second grooves combined is a full circle, and the cross section of the full circle is slightly larger than the cross section of the internal threaded tube.
[0011] Furthermore, the cross-sectional centers of the first groove, the second groove and the trapezoidal rotation cutout groove are in the same vertical direction.
[0012] Compared with the prior art, the present invention has the following beneficial effects:
[0013] This prefabricated formwork column installation and construction structure, through the auxiliary positioning mechanism, can quickly align the internal threaded tube at the lower end of the prefabricated formwork column body with the fixed steel bars when the prefabricated formwork column body is hung down, thereby reducing the difficulty of operation for the staff, saving alignment time and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;
[0015] Figure 2 This is a schematic diagram of the three-dimensional structure of the utility model after the four sets of auxiliary positioning mechanisms are fixed;
[0016] Figure 3 This is a schematic diagram of the three-dimensional structure of the auxiliary positioning mechanism of the utility model;
[0017] Figure 4 for Figure 2 Enlarged view of point A above.
[0018] In the figure: 1. Base; 2. Steel bar; 3. Threaded groove; 4. Prefabricated formwork column body; 5. Threaded rod; 6. Internally threaded pipe; 7. Auxiliary positioning mechanism; 701. Bottom plate; 702. First groove; 703. Support rod; 704. Support plate; 705. Trapezoidal rotary cutting groove; 706. Second groove; 8. Fixing block; 9. Bolt; 10. Nut. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0020] See also Figures 1 to 4A prefabricated formwork column installation and construction structure includes a base 1, a plurality of steel bars 2 are fixedly connected to the base 1, a threaded groove 3 is opened on the surface of the steel bar 2, and a prefabricated formwork column body 4 matching it is threadedly connected to the threaded groove 3, and a threaded rod 5 matching the steel bar 2 is provided at the lower end of the prefabricated formwork column body 4, and an internal threaded tube 6 is threadedly connected to the threaded rod 5. Four groups of auxiliary positioning mechanisms 7 are provided on the base 1, and each group of auxiliary positioning mechanisms 7 consists of two identical parts.
[0021] like Figures 1 to 4 As shown, the prefabricated formwork column installation construction structure in the present invention, when in use, first place the auxiliary positioning mechanism 7 on the inner side of the steel bar 2 in sequence, so that the first groove 702 on the bottom plate 701 is in contact with the surface of the steel bar 2, at this time, the lower surface of the support plate 704 is higher than the upper end of the steel bar 2, and then place the second auxiliary positioning mechanism 7 on the outer side of the steel bar 2 in sequence, so that the two auxiliary positioning mechanisms 7 are fitted together, and the two auxiliary positioning mechanisms 7 are fixed by using bolts 9 and nuts 10 on the fixing block 8, so that the steel bar 2 is firmly fixed in the first groove 702 on the two auxiliary positioning mechanisms 7, and the installation of the auxiliary positioning mechanism 7 is completed, and the prefabricated formwork column body 4 that is lifted up is slowly lowered and its position is adjusted. When the internal threaded tube 6 set at the lower end of the prefabricated formwork column body 4 slides into the trapezoidal rotation cutting groove 705 on the auxiliary positioning mechanism 7, continue to prefabricated formwork column body 4 below, under the action of the trapezoidal rotation cutting groove 705, the internal threaded tube 6 moves downward along the trapezoidal rotation cutting groove 705 and the inner wall of the second groove 706, so as to directly align with the steel bar 2 and resist against the steel bar 2. At this time, the alignment of the internal threaded tube 6 and the steel bar 2 can be completed. Rotate the internal threaded tube 6 to thread the internal threaded tube 6 and the threaded groove 3 on the steel bar 2, thereby fixing the prefabricated formwork column body 4 on the steel bar 2. According to the opposite operation of the above, remove the bolts 9 and nuts 10, and the auxiliary positioning mechanism 7 can be removed for continued use in subsequent work.
[0022] like Figure 4 As shown, both sides of the auxiliary positioning mechanism 7 are fixedly connected with a fixing block 8 with a round hole in the middle, and the two auxiliary positioning mechanisms 7 are fixed to both sides of the steel bar 2 by bolts 9 and nuts 10.
[0023] Specifically, the two auxiliary positioning mechanisms 7 are fixed by bolts 9 and nuts 10, so as to facilitate the removal of the auxiliary positioning mechanisms 7 after the prefabricated formwork column body 4 and the steel bars 2 are fixed.
[0024] like Figure 2 or Figure 3As shown, the auxiliary positioning mechanism 7 includes a base plate 701, a first groove 702 is provided on the base plate 701, a support rod 703 is fixedly connected to the upper end of the base plate 701, the upper end of the support rod 703 is fixedly connected to the support plate 704, a trapezoidal rotation cutting groove 705 is provided on the surface of the support plate 704, and a second groove 706 is provided on the lower surface of the support plate 704, and the trapezoidal rotation cutting groove 705 is connected to the second groove 706.
[0025] Specifically, the auxiliary positioning mechanism 7 is first placed on the inner side of the steel bar 2 in sequence, so that the first groove 702 on the bottom plate 701 is in contact with the surface of the steel bar 2. At this time, the lower surface of the support plate 704 is higher than the upper end of the steel bar 2. Then the second auxiliary positioning mechanism 7 is placed on the outer side of the steel bar 2 in sequence, so that the two auxiliary positioning mechanisms 7 are fitted together. The two auxiliary positioning mechanisms 7 are fixed by using bolts 9 and nuts 10 on the fixing block 8, so that the steel bar 2 is firmly fixed in the first groove 702 on the two auxiliary positioning mechanisms 7, and the installation of the auxiliary positioning mechanism 7 is completed.
[0026] like Figure 3 As shown, the cross section of the first groove 702 is semicircular. When the two first grooves 702 are combined, a full circle is formed. The cross section of the full circle is the same as the cross section of the steel bar 2.
[0027] Specifically, the two first grooves 702 wrap the steel bar 2 so as to fix the auxiliary positioning mechanism 7 through the steel bar 2 .
[0028] like Figure 3 As shown, the cross section of the second groove 706 is semicircular, and the cross section of the two second grooves 706 combined is a full circle, which is slightly larger than the cross section of the internal threaded tube 6 .
[0029] Specifically, this is to allow the internal threaded tube 6 to slide downward along the inner wall of the trapezoidal rotary cutout groove 705 during the downward movement, until it passes through the lower end of the second groove 706 and abuts against the steel bar 2.
[0030] like Figure 3 As shown, the cross-sectional centers of the first groove 702 , the second groove 706 and the trapezoidal rotation cutout groove 705 are in the same vertical direction.
[0031] Specifically, the cross-sectional centers of the first groove 702, the second groove 706 and the trapezoidal rotation cutting groove 705 are in the same vertical direction to ensure that the internal threaded tube 6 is aligned with the steel bar 2 after moving downward, so that the internal threaded tube 6 can be threadedly connected to the thread groove 3 on the steel bar 2.
[0032] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A prefabricated formwork column installation construction structure, comprising a base (1), a plurality of steel bars (2) fixedly connected to the base (1), a threaded groove (3) provided on the surface of the steel bars (2), a prefabricated formwork column body (4) matching the same being threadedly connected to the threaded groove (3), a threaded rod (5) matching the steel bars (2) being provided at the lower end of the formwork column body (4), an internal threaded tube (6) being threadedly connected to the threaded rod (5), and characterized in that: Four groups of auxiliary positioning mechanisms (7) are provided on the base (1), and each group of auxiliary positioning mechanisms (7) consists of two identical parts.
2. The prefabricated formwork column installation construction structure according to claim 1, characterized in that: Both sides of the auxiliary positioning mechanism (7) are fixedly connected with a fixing block (8) with a circular hole in the middle, and the two auxiliary positioning mechanisms (7) are fixed to both sides of the steel bar (2) by bolts (9) and nuts (10).
3. A prefabricated formwork column installation construction structure according to claim 1 or 2, characterized in that: The auxiliary positioning mechanism (7) comprises a base plate (701), a first groove (702) is provided on the base plate (701), a support rod (703) is fixedly connected to the upper end of the base plate (701), a support plate (704) is fixedly connected to the upper end of the support rod (703), a trapezoidal rotation cutting groove (705) is provided on the surface of the support plate (704), a second groove (706) is provided on the lower surface of the support plate (704), and the trapezoidal rotation cutting groove (705) is connected to the second groove (706).
4. The prefabricated formwork column installation construction structure according to claim 3, characterized in that: The cross section of the first groove (702) is semicircular, and when the two first grooves (702) are combined, a full circle is formed, and the cross section of the full circle is the same as the cross section of the steel bar (2).
5. The prefabricated formwork column installation construction structure according to claim 3, characterized in that: The cross section of the second groove (706) is semicircular, and the cross section of the two second grooves (706) combined is a full circle, and the cross section of the full circle is slightly larger than the cross section of the internal threaded tube (6).
6. The prefabricated formwork column installation construction structure according to claim 3, characterized in that: The cross-sectional centers of the first groove (702), the second groove (706) and the trapezoidal rotation cutting groove (705) are in the same vertical direction.