Scaffold for decoration

By designing a multi-layer structure and a quick fixing mechanism, the problems of climbing safety and height adjustment of scaffolding used for decoration are solved, safe climbing and flexible construction are achieved, and construction safety and efficiency are improved.

CN223386941UActive Publication Date: 2025-09-26ANHUI JINGZHE GLASS TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423096705.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-09-26
Estimated Expiration
2034-12-16

AI Technical Summary

Technical Problem

Existing scaffolding for decoration lacks safety protection during climbing, resulting in a high risk of falling. It is also inconvenient to set up and adjust the height, affecting construction safety and efficiency.

Method used

A multi-layer structure including a fixed frame, a support frame and a protective frame was designed. The scaffolding can be quickly stacked and fixed through support columns and fixed knobs, providing a safe climbing path. The working platform area can be adjusted through a flip plate to adapt to different height requirements.

Benefits of technology

It provides a safe and reliable climbing path, reduces the risk of falling, improves the versatility and construction efficiency of the scaffolding, adapts to the height requirements of different decoration areas, and ensures construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223386941U_ABST
    Figure CN223386941U_ABST
Patent Text Reader

Abstract

The utility model discloses a scaffold for decoration, and belongs to the technical field of scaffolds. The scaffold for decoration comprises a fixing frame, first supporting columns are fixedly connected to the four corners of the lower end of the fixing frame, a supporting mechanism for a worker to stand is arranged above the fixing frame, and a protective frame is arranged above the supporting mechanism; the supporting mechanism comprises a supporting frame located above the fixing frame, a plurality of scaffolds are stacked, and a worker climbs into the supporting frame through a plurality of standing plates on one side between the fixing frame and the supporting frame and then can stand on a standing plate and a turnover plate on one side in the supporting frame. And then the user climbs into the supporting frame of the other group by means of the climbing plate in the other group of scaffold, and the user can safely and quickly climb to the standing plate of the uppermost scaffold by repeating the operation. Through the gradual climbing design, a safe and reliable climbing path is provided for workers, the falling risk possibly caused by direct climbing to the high position is reduced, and the safety of the workers is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of scaffolding, and more specifically, to a scaffolding for decoration. Background Art

[0002] Decoration scaffolding is a temporary facility that provides workers with a stable working platform during building decoration construction. It can be built in different heights and shapes according to construction needs, making it convenient for workers to carry out high-altitude operations such as wall painting, ceiling installation, door and window installation, etc., which can effectively ensure construction safety and improve work efficiency.

[0003] Often, when workers are climbing higher scaffolds, they often rely on simple climbing tools or simply scale the scaffold poles with their bare hands. This method of direct climbing, lacking adequate safety protection and a stable foothold, can easily lead to workers slipping and falling.

[0004] In view of this, the present application proposes a decoration hand scaffold. Utility Model Content

[0005] The purpose of this application is to provide a decoration hand-foot stand, which solves the technical problems in the above-mentioned background technology.

[0006] The technical solution of the present application provides a scaffold for decoration, comprising a fixed frame, wherein the four corners of the lower end of the fixed frame are fixedly connected to a first support column, a support mechanism for workers to stand is provided above the fixed frame, and a protective frame is provided above the support mechanism; the support mechanism comprises a support frame located above the fixed frame, a first strap is fixedly connected to the rear of one side of the inner wall of the support frame, a second strap is fixedly connected to the front of one side of the inner wall of the fixed frame, a pair of connecting strips are fixedly connected between the first strap and the second strap, a plurality of climbing boards are fixedly connected between the two connecting strips, and a standing board is fixedly connected to the other side of the inner wall of the support frame.

[0007] Optionally, insertion holes are provided at the four corners of the upper end surface of the support frame, and fixed knobs are connected to the four corners of the outer wall of the support frame through threaded rotation.

[0008] Optionally, a flip plate is hinged on one side of the standing plate, and an outer wall of the flip plate is clearance-fitted with one side of an inner wall of the support frame.

[0009] Optionally, a handle is fixedly connected to the upper end surface of the flip plate, and a support plate is fixedly connected to the front of one side of the inner wall of the support frame.

[0010] Optionally, support rods are fixedly connected to the four corners of the upper end of the fixed frame, a reinforcement frame is fixedly connected between two of the support rods, and the upper ends of the support rods are fixedly connected to the support frame.

[0011] Optionally, second support columns are fixedly connected to the four corners of the lower end surface of the protective frame, and the first support column and the second support column both correspond to the sockets.

[0012] One or more technical solutions provided in the technical solution of this application have at least the following technical effects or advantages:

[0013] 1. This application stacks multiple scaffolds. Workers climb into the support frame using multiple standing boards on one side between the fixed frame and the support frame. They then stand on the standing board and flip board on one side of the support frame. Using the climbing boards inside another set of scaffolds above, they climb into the support frame of another set. Repeating this process allows them to safely and quickly reach the standing board of the top scaffold. The step-by-step climbing design provides workers with a safe and reliable climbing path, reducing the risk of falling caused by direct climbing, and ensuring personnel safety.

[0014] 2. This application achieves stacking and securing by inserting the four first support columns at the bottom of one set of scaffolding into the sockets of the upper support frame of another set of scaffolding and tightening the fixing knobs at the four corners of the support frame's outer wall. This design allows multiple sets of scaffolding to be stacked quickly and stably, facilitating flexible adjustment of the overall height of the scaffolding according to the height of the renovation area, adapting to different work scenarios, and improving the versatility and practicality of the scaffolding. When constructing a higher work platform, there is no need for complex connecting structures or additional fixing devices, saving construction time and labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall structure of the decoration scaffolding disclosed in the embodiment of the present application;

[0016] Figure 2 This is a structural expansion diagram of the decoration scaffolding disclosed in an embodiment of the present application;

[0017] Figure 3 This is a schematic diagram of the internal structure of the decoration support frame disclosed in the embodiment of the present application;

[0018] Explanation of the numbers in the figure: 1. Fixed frame; 2. First support column; 3. Bracket rod; 4. Reinforcement frame; 5. Support frame; 6. Protective frame; 7. Second support column; 8. Socket; 9. Fixed knob; 10. First strap; 11. Second strap; 12. Connecting bar; 13. Climbing board; 14. Standing board; 15. Flip board; 16. Handle; 17. Support board. DETAILED DESCRIPTION

[0019] The present application is further described in detail below with reference to the accompanying drawings.

[0020] Reference Figure 1-Figure 3The embodiment of the present application provides a decoration hand-foot scaffold, comprising a fixed frame 1, wherein the four corners of the lower end of the fixed frame 1 are fixedly connected to a first support column 2, a support mechanism for a worker to stand is provided above the fixed frame 1, and a protective frame 6 is provided above the support mechanism; the support mechanism comprises a support frame 5 located above the fixed frame 1, a first strap 10 is fixedly connected to the rear of one side of the inner wall of the support frame 5, a second strap 11 is fixedly connected to the front of one side of the inner wall of the fixed frame 1, and a pair of connecting rods are fixedly connected between the first strap 10 and the second strap 11. The connecting bars 12 are fixedly connected with a plurality of climbing boards 13 between the two connecting bars 12, and a standing board 14 is fixedly connected to the other side of the inner wall of the support frame 5. When multiple scaffolds are stacked, workers climb into the support frame 5 through the multiple standing boards 14 on one side between the fixed frame 1 and the support frame 5, and then stand on the standing board 14 on one side inside the support frame 5. Then, with the help of the climbing boards 13 inside another set of scaffolds above, they climb into the support frame 5 of another set. Repeating the operation can safely and quickly climb to the standing board 14 of the topmost scaffold. The step-by-step climbing design provides workers with a safe and reliable climbing path, reduces the risk of falling caused by directly climbing high places, and ensures the safety of personnel.

[0021] The four corners of the upper end surface of the support frame 5 are provided with sockets 8, and the four corners of the outer wall of the support frame 5 are connected to the four screw threads with fixed knobs 9. The stacking and fixing of the scaffolding is completed by inserting the four first support columns 2 at the bottom of one set of scaffolding into the sockets 8 of the support frame 5 on the upper side of another set of scaffolding and tightening the fixed knobs 9 at the four corners of the outer wall of the support frame 5. This design allows multiple sets of scaffolding to be stacked quickly and stably, and the overall height of the scaffolding can be flexibly adjusted according to the height of the decoration area, adapting to different work scenarios, and improving the versatility and practicality of the scaffolding.

[0022] A flip plate 15 is hinged to one side of the standing board 14, and the outer wall of the flip plate 15 is loosely fitted with one side of the inner wall of the support frame 5. A handle 16 is fixedly connected to the upper end face of the flip plate 15, and a support plate 17 is fixedly connected to the front of one side of the inner wall of the support frame 5. When work is required, the handle 16 is used to flip the flip plate 15 from the standing board 14 to be level with the standing board 14. At the same time, the flip plate 15 is placed on the first strap 10 and the support plate 17, so that the flip plate 15 covers the vacant position on one side of the support frame 5, facilitating safe operation for workers. The flip plate 15's reversible design increases the area of ​​the work platform, providing workers with more spacious operating space within the support frame 5, and allows the layout of the work platform to be flexibly adjusted according to actual work needs, thereby improving work efficiency. When not needed, it can be flipped and folded away without affecting normal climbing and passage.

[0023] The four corners of the upper end of the fixed frame 1 are fixedly connected to support rods 3, and a reinforcement frame 4 is fixedly connected between the two support rods 3. The upper ends of the support rods 3 are fixedly connected to the support frame 5. The four corners of the lower end surface of the protective frame 6 are fixedly connected to second support columns 7. The first support columns 2 and the second support columns 7 correspond to the sockets 8. Insert the second support columns 7 at the four corners of the lower end of the protective frame 6 into the sockets 8 of the uppermost support frame 5 and tighten the fixing knob 9 to complete the fixation. The protective frame 6 plays a protective role at the highest point, preventing workers from accidentally falling while working at the top, further enhancing the safety of the entire scaffolding system.

[0024] Working principle: According to the height of the area to be decorated, the staff takes multiple scaffoldings, inserts the four first support columns 2 at the bottom of one group of scaffoldings into the sockets 8 of the support frame 5 on another group of scaffoldings, and after completing the stacking, tightens the fixing knobs 9 at the four corners of the outer wall of the support frame 5 to fix the first support columns 2 to the support frame 5. After completing the stacking and fixing of multiple groups, install the protective frame 6 on the top support frame 5, insert the second support columns 7 at the four corners of the lower end of the protective frame 6 into the sockets 8 of the top support frame 5, and tighten the fixing knobs 9 to complete the fixation.

[0025] When a worker needs to stand on the standing board 14 on the top scaffolding, they first enter the fixed frame 1, then climb into the support frame 5 through the multiple standing boards 14 on one side between the fixed frame 1 and the support frame 5. They can then stand on the standing board 14 and the flip board 15 on one side of the support frame 5. They climb into the support frame 5 of another set of scaffolding using the climbing board 13 inside the other set of scaffolding above. Repeating the above steps allows them to safely and quickly climb to the standing board 14 of the top scaffolding. When work is needed, the flip board 15 is flipped from the standing board 14 to be level with the standing board 14. At the same time, the flip board 15 is placed on the first scaffolding board 10 and the support board 17, so that the flip board 15 covers the vacant space on one side of the support frame 5, making it easier for the worker to operate safely. After completing the work, the worker flips open the flip board 15 and then walks down the scaffolding using the climbing board 13.

[0026] The above is only a preferred specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the present invention can make equivalent replacements or changes based on the technical solution and utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A decoration scaffold, comprising a fixing frame (1), characterized in that: The four corners of the lower end of the fixed frame (1) are fixedly connected to first support columns (2), a support mechanism for staff to stand on is provided above the fixed frame (1), and a protective frame (6) is provided above the support mechanism; The support mechanism comprises a support frame (5) located above the fixed frame (1); a first strap (10) is fixedly connected to the rear of one side of the inner wall of the support frame (5); a second strap (11) is fixedly connected to the front of one side of the inner wall of the fixed frame (1); a pair of connecting bars (12) are fixedly connected between the first strap (10) and the second strap (11); a plurality of climbing boards (13) are fixedly connected between two of the connecting bars (12); and a standing board (14) is fixedly connected to the other side of the inner wall of the support frame (5).

2. The decoration scaffold according to claim 1, characterized in that: Insertion holes (8) are provided at the four corners of the upper end surface of the support frame (5), and fixed knobs (9) are connected to the four corners of the outer wall of the support frame (5) through threaded rotation.

3. The decoration scaffold according to claim 1, characterized in that: A flip plate (15) is hinged on one side of the standing plate (14), and an outer wall of the flip plate (15) is clearance-fitted with one side of an inner wall of the support frame (5).

4. The decoration scaffold according to claim 3, characterized in that: A handle (16) is fixedly connected to the upper end surface of the flip plate (15), and a support plate (17) is fixedly connected to the front of one side of the inner wall of the support frame (5).

5. The decoration scaffolding according to claim 1, characterized in that: The four corners of the upper end of the fixed frame (1) are fixedly connected to support rods (3), a reinforcement frame (4) is fixedly connected between two of the support rods (3), and the upper ends of the support rods (3) are fixedly connected to the support frame (5).

6. The decoration scaffold according to claim 2, characterized in that: Second support columns (7) are fixedly connected to the four corners of the lower end surface of the protection frame (6), and the first support column (2) and the second support column (7) both correspond to the sockets (8).