Structure applied to double-curved-surface mooring side door
The hyperbolic mooring porthole design, which pre-cuts the porthole installation opening on the curved structure and assembles it as a whole by hoisting, solves the problems of welding deformation and construction difficulty during the installation of the curved porthole, and achieves efficient, beautiful installation effects and good sealing.
Patent Information
- Application Number
- CN202422712896.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-10-21
- Estimated Expiration
- 2034-11-07
AI Technical Summary
The existing technology has the problems of large welding deformation, high difficulty in correction, high cost and poor appearance when installing a curved structure gangway.
A hyperbolic mooring porthole design consisting of a door frame structure, outer panels, door panels and tie rod cylinders is adopted. By pre-cutting the porthole installation opening on the curved structure and hoisting and assembling the entire structure on site, welding deformation and construction difficulty are reduced. Sealing rubber and reinforced brackets are used to improve connection strength and sealing.
It achieves efficient installation of curved side doors, reduces welding deformation and construction difficulty, ensures installation quality and beautiful appearance, and improves sealing and comfort of use.
Smart Images

Figure CN223457070U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of ship, especially a kind of applied to double-curved surface mooring side door structure. BACKGROUND
[0002] Mooring side door is mainly used as the passageway for personnel access when ship is berthed in port unloading wharf, which is particularly important in loading and unloading cargo, passenger boarding and disembarking, etc., to avoid the risk of falling directly into the water from the side of the ship. A side door is usually installed on the side of the ship to allow personnel to enter or exit the ship through the door.
[0003] The common installation method is to select a design reference point on the design model and establish a design coordinate system according to the reference point; select the opening position of the side door on the design model to obtain the design coordinates of the opening point, and calculate the actual coordinates of the actual opening point on the corresponding position of the ship body through coordinate transformation. The installation position of the side door on the ship is determined according to the actual coordinates, and then the structure is modified on site before installation.
[0004] The common side door installation structure is a plane structure, which can be pre-drilled through cutting program during the ship body structure cutting stage, and then slightly modified after the segments are closed to install. This installation method is commonly used for installing plane structure side doors.
[0005] However, the side doors on the sides of the current SOV wind power operation mother ship and PSV platform support ship are generally common on curved structures. If the current plane structure side door installation method is used for installing curved side doors, the traditional installation method needs to be continuously modified due to the stress influence and deformation after heat welding during the welding process, which requires high process requirements during installation. Once the deformation is corrected, the difficulty is dramatically increased and the ship body structure is affected, and the structure is severely deformed after too much correction, which affects the appearance of the ship body structure and consumes time and labor. SUMMARY
[0006] The technical problem to be solved by the utility model is to provide a double-curved surface mooring side door structure.
[0007] To solve the above technical problems, the technical scheme of the utility model is as follows: a double-curved surface mooring side door structure, the bow of the ship is a curved structure, and a side door installation opening is formed on the curved structure, and the innovation point is that it comprises
[0008] a door frame structure, comprising a frame body, the frame body has a first channel in the center, and the frame body is installed inside the side door installation opening;
[0009] an outer plate, the outer plate is installed on the inner wall of the side door installation opening of the frame body, and a second channel is formed in the middle and communicated with the first channel.
[0010] A door plate is arranged outside the outer plate and is hinged with the door frame structure, and a pull rod oil cylinder is further arranged between the door plate and the door frame structure.
[0011] Further, sealing rubber is arranged between the outer plate and the inner wall of the side door mounting port.
[0012] Further, a handrail structure is further arranged on the door plate.
[0013] Further, an alignment groove is arranged on the top of the frame body, and the alignment groove is filled with sealing rubber.
[0014] Further, a plurality of uniformly distributed reinforcing knees are arranged on the top and bottom of the frame body.
[0015] Further, T-beams are arranged at the top and bottom edges of the frame body.
[0016] Further, the frame body comprises a bottom plate arranged horizontally and fixed on the deck of the ship.
[0017] Further, a containing groove for clamping the door plate is arranged on the frame body at the periphery of the first channel.
[0018] The utility model has the advantages that:
[0019] 1. The structure can reduce the difficulty of on-site construction, control stress concentration and welding deformation, avoid large deformation caused by stress concentration during installation, reduce installation difficulty and modification amount, improve the first success rate of curved surface installation, save cost, ensure installation quality, meet the efficient installation of side doors of curved surface structure, reduce welding deformation, modification amount and on-site construction difficulty.
[0020] 2. The structure is cut after the curved surface structure is formed, and the equipment manufacturer assembles the side door according to the size of the side door, and the whole is hoisted and formed once on site, which greatly saves the on-site construction difficulty and workload, and the welding seam amount is small, the deformation amount is small, the appearance is beautiful, and the first installation success rate is ensured.
[0021] 3. Sealing rubber is arranged between the outer plate and the inner wall of the side door mounting port, the connection sealing property between the outer plate and the side door mounting port is ensured, and the sealing rubber is filled in the alignment groove of the outer plate, so that the sealing property is further improved.
[0022] 4. The handrail structure is further arranged on the door plate, the use feeling of the customer is improved, and stable support can be provided for the customer during walking.
[0023] 5. The reinforcing knee plate and T-beam mounted on the frame body are used for improving the connecting strength between the frame body and the ship side. BRIEF DESCRIPTION OF DRAWINGS
[0024] Figure 1 Structure diagram of the utility model after installation Figure One .
[0025] Figure 2 Structure diagram of the utility model after installation Figure Two .
[0026] Figure 3 Structure diagram of part of the utility model Figure One .
[0027] Figure 4 Structure diagram of part of the utility model Figure Two . DETAILED DESCRIPTION
[0028] In order to further illustrate the technical means and effects adopted by the utility model to achieve the predetermined utility model purposes, the specific embodiments, structures, features and effects of the utility model are described in detail as follows in combination with the drawings and preferred embodiments.
[0029] As shown in Figure 1 A kind of be applied to double curved surface mooring door structure, it is applied to Shanghai electric operation and maintenance ship, its 100P mooring door is located at the curved structure 2 position of ship bow, to guarantee first installation success rate, after the curved structure 2 is formed, the cutting of door installation opening is carried out to door installation position, it is assembled in advance by equipment manufacturer in combination with door shape size, overall hoisting is formed once in situ, which greatly saves the construction difficulty and workload in situ. Welding seam quantity is less, deformation amount is small, appearance is beautiful.
[0030] A kind of be applied to double curved surface mooring door structure, including a door frame structure 1, a outer plate 3, a door plate 4.
[0031] Door frame structure 1, including a frame body 11, frame body 11 central first passage, frame body is installed in door installation opening inside.
[0032] Frame body 11 is by top plate, bottom plate 12, a plurality of vertical plate and side plate fixed one frame structure, and the first passage in the middle of this frame structure is rectangle, the bottom plate 12 is horizontally arranged, its width is greater than top plate, and is installed and fixed on the deck of ship.
[0033] First passage is set up in the middle of side plate, and rectangular accommodating slot for accommodating door plate 4 clamping is also set up on the side plate at the circumferential side of first passage.
[0034] The outer plate 3 is installed on the inboard wall of the frame body's scuttle mounting port, a second channel is formed in the middle of the outer plate 3 and is communicated with the first channel, and the first sealing rubber 5 is arranged between the outer plate 3 and the inboard wall of the scuttle mounting port, so as to ensure the sealing connection between the outer plate 3 and the scuttle mounting port.
[0035] The door plate 4 is arranged outside the outer plate 3 and is hinged to the door frame structure 1, and the pull rod oil cylinder 6 is further arranged between the door plate 4 and the door frame structure 1.
[0036] The handrail structure 7 is arranged on both sides of the door plate 4, so as to improve the use feeling of customers and provide stable support for customers during walking.
[0037] The alignment groove is further arranged on the top of the frame body 11, and the second sealing rubber 8 is filled in the alignment groove, so as to further improve the sealing performance.
[0038] The vertical T-beam 13 is arranged on both sides of the top edge of the frame body 11, and the three vertical reinforcing knee plates 14 are uniformly arranged between the two T-beams 13.
[0039] The vertical T-beam 13 is arranged on both sides of the bottom edge of the frame body 11, and the three vertical reinforcing knee plates 14 are uniformly arranged between the two T-beams 13.
[0040] The reinforcing knee plate 14 and the T-beam 13 can be used to improve the connection strength between the frame body 11 and the ship side.
[0041] Working principle of the patent:
[0042] First, the whole structure is assembled, then the lifting eye plate is installed for overall lifting, and then overall welding is arranged, and after the welding is completed, the scuttle is opened to check whether it is not interfered, and then the installation is completed.
[0043] The above is only a preferred embodiment of the present application, and does not limit the present application in any form. Although the present application has been disclosed as above, it is not intended to limit the present application. Any person skilled in the art can make some changes or modifications to the above disclosed technical content to obtain equivalent embodiments, but as long as the changes or modifications do not deviate from the technical solution of the present application, any modification, equivalent change and modification of the above embodiments according to the technical essence of the present application are still within the scope of the technical solution of the present application.
Claims
1. A double-curved surface mooring door structure applied to a ship bow, the bow being a curved surface structure, a door mounting opening being formed on the curved surface structure, characterized in that: Comprising A door frame structure, comprising a frame body, the frame body having a first channel in the center, the frame body being installed inside the door installation opening; An outer plate, the outer plate being installed on the inner wall of the door installation opening of the frame body, and a second channel being formed in the middle of the outer plate and being in communication with the first channel; A door plate, the door plate being arranged outside the outer plate, and being hinged with the door frame structure, and a pull rod oil cylinder being further arranged between the door plate and the door frame structure.
2. A mooring door structure for application to a double curved surface as claimed in claim 1, characterized in that: A sealing rubber is arranged between the outer plate and the inner wall of the door installation opening.
3. A mooring door structure for application to a double curved surface as claimed in claim 1, characterized in that: A handrail structure is further installed on the door plate.
4. A mooring door structure for application to a double curved surface as claimed in claim 1, characterized in that: An alignment groove is further arranged on the top of the frame body, and the alignment groove is filled with a sealing rubber.
5. A mooring door structure for a double curved surface as claimed in claim 1, wherein: A plurality of reinforcing knee plates are uniformly arranged on the top and the bottom of the frame body.
6. A mooring door structure for application to a double curved surface as claimed in claim 5, characterized in that: T-beams are arranged at the edge positions of the top and the bottom of the frame body.
7. A mooring door structure for a double curved surface as claimed in claim 1, wherein: The frame body comprises a bottom plate, the bottom plate being horizontally arranged and being fixedly installed on the deck of the ship.
8. A mooring door structure for a double curved surface as claimed in claim 1, wherein: An accommodating groove is further formed in the circumferential side of the first channel of the frame body, and the door plate is clamped in the accommodating groove.