Fiber-reinforced mounting cement board
Through the design of aluminum alloy hangers and hanger structures, fiber cement boards can be installed using only vertical keels, solving the problems of time-consuming, labor-intensive and high-cost installation in the existing technology, and achieving the effect of simplifying installation and reducing costs.
Patent Information
- Application Number
- CN202422860308.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-11-22
AI Technical Summary
Existing fiber cement panels require vertical and horizontal keels during installation, which makes the installation time-consuming and labor-intensive and increases costs.
The aluminum alloy hanger and bracket structure is adopted, and only the vertical keel needs to be installed. The aluminum alloy hanger and the fiber cement board are assembled into an integral plate, and the positioning and fine-tuning are achieved by using adjusting screws and limit screws, eliminating the need for horizontal keels.
It simplifies the installation process, reduces costs and improves installation efficiency, ensuring the positioning and sealing of the panels.
Smart Images

Figure CN223468925U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building material technical field especially relates to a fiber reinforced installation cement board. BACKGROUND
[0002] With the acceleration of urbanization, the development of the construction industry needs more environmentally friendly and sustainable building materials. As an environmentally friendly, high-strength and multifunctional material, fiber cement board is favored by the market, and its application in residential, commercial and industrial buildings is becoming more and more widespread.
[0003] The fiber cement board currently used in the installation of the wall surface usually needs to install a keel on the wall surface first, which mainly plays the role of supporting and fixing the fiber cement board. The keel usually includes vertical keel and horizontal keel. It is time-consuming and laborious to fix the keel. It is also more cumbersome to install the fiber cement board in the later period, and it increases the use cost. SUMMARY
[0004] The utility model provides a fiber reinforced installation cement board, which only needs vertical keel during installation, eliminates horizontal keel, greatly reduces cost, and is simple to install and easy to operate.
[0005] In a first aspect, the present disclosure provides a fiber reinforced installation cement board, which specifically comprises: a curtain wall keel;
[0006] One side of the curtain wall keel is provided with an aluminum alloy hanging seat through a mechanism screw; the top side of the aluminum alloy hanging seat is provided with an aluminum alloy hanging piece; one limiting screw is installed on the aluminum alloy hanging seat; one side of the aluminum alloy hanging piece is provided with a fiber cement board through a decorative rivet; sealing glue is also filled between adjacent fiber cement boards; and one adjusting screw is also screwed on the top of the aluminum alloy hanging piece.
[0007] In at least some embodiments, an opening groove is further provided on the annular raised plate on the top of the aluminum alloy hanging piece, and the adjusting screw can pass through the opening groove on the annular raised plate and be screwed into the vertical threaded hole on the top of the aluminum alloy hanging seat.
[0008] In at least some embodiments, the aluminum alloy hanging piece is pre-installed on the rear side outer wall of the fiber cement board through the decorative rivet, and four or six aluminum alloy hanging pieces are installed on each fiber cement board.
[0009] In at least some embodiments, a cylindrical raised strip is provided on the outer wall of each of the two side edges of the fiber cement board, and the sealing glue is applied in front of the cylindrical raised strip.
[0010] In at least some embodiments, an annular raised plate is provided on one side of the top of the aluminum alloy hanging piece, and the annular raised plate can be installed on the top of the aluminum alloy hanging seat.
[0011] In at least some embodiments, the mechanism screw, the limiting screw, the decorative rivet and the adjusting screw are all made of stainless steel, and the front side of the decorative rivet is arc-shaped.
[0012] In at least some embodiments, the aluminum alloy hanging seat is provided with a horizontal threaded hole, and the limiting screw is screwed into the horizontal threaded hole of the aluminum alloy hanging seat.
[0013] The utility model provides a kind of fiber reinforced installation cement board, with following beneficial effects:
[0014] The fiber cement board in the utility model is assembled into an integral plate by decorative rivet and aluminum alloy hanging piece, four or six aluminum alloy hanging pieces are provided on each fiber cement board, then the integral plate is hung on the aluminum alloy hanging seat fixed in front of curtain wall keel, and the horizontal is adjusted by adjusting screw to meet installation requirements, only vertical keel is needed during installation, transverse keel is saved, cost is greatly reduced, and installation is simple and easy to operate. BRIEF DESCRIPTION OF DRAWINGS
[0015] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the drawings of the embodiments will be briefly introduced below.
[0016] The drawings described below only relate to some embodiments of the utility model, and are not limited to the utility model.
[0017] In the drawings:
[0018] Figure 1 A side view schematic diagram of the overall structure after installation of the present application is shown;
[0019] Figure 2 A top view schematic diagram of the overall structure after installation of the present application is shown;
[0020] Figure 3 A top view schematic diagram of the connection between aluminum alloy hanging seat and aluminum alloy hanging piece in the present application is shown;
[0021] Figure 4 A top view schematic diagram of the assembly between aluminum alloy hanging piece and fiber cement board in the present application is shown;
[0022] Figure 5 A partial side view schematic diagram after installation of the present application is shown;
[0023] LIST OF REFERENCE NUMERALS
[0024] 1, curtain wall keel; 2, mechanism screw; 3, aluminum alloy hanging seat; 4, aluminum alloy hanging piece; 5, limiting screw; 6, decorative rivet; 7, fiber cement board; 8, sealant; 9, adjusting screw. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme of the embodiments of the utility model will be described clearly and completely below in combination with the drawings of the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all the embodiments. Based on the described embodiments of the utility model, all other embodiments obtained by those of ordinary skill in the art without creative labor fall within the scope of protection of the utility model.
[0026] Embodiment one: please refer to Figures 1 to 5
[0027] The utility model provides a kind of fiber reinforced installation cement board, comprising: curtain wall skeleton 1;
[0028] Curtain wall skeleton 1 side is equipped with aluminium alloy hanging seat 3 by mechanism screw 2, curtain wall skeleton 1 is used to support aluminium alloy hanging seat 3, mechanism screw 2 is used to fasten curtain wall skeleton 1 and aluminium alloy hanging seat 3, aluminium alloy hanging seat 3 is used to support aluminium alloy hanging piece 4;Aluminium alloy hanging seat 3 top side is equipped with aluminium alloy hanging piece 4, aluminium alloy hanging piece 4 is used to support fiber cement board 7;Aluminium alloy hanging seat 3 is equipped with one limit screw 5, when installing, the annular protruding plate of aluminium alloy hanging piece 4 top side on the back of fiber cement board 7 is placed on aluminium alloy hanging seat 3 top, limit screw 5 can limit aluminium alloy hanging piece 4 at this time, to position the height of fiber cement board 7;One side of aluminium alloy hanging piece 4 is equipped with fiber cement board 7 by decorative rivet 6, the thickness of fiber cement board 7 is 12mm, it can play the role of fire prevention, waterproof, sound insulation and heat insulation after installation, decorative rivet 6 is used to fasten aluminium alloy hanging piece 4 and fiber cement board 7;Sealant 8 is also filled between adjacent fiber cement board 7, after fiber cement board 7 is installed, sealant 8 can be applied in the gap between fiber cement board 7, to ensure that the overall surface is sealed;Aluminium alloy hanging piece 4 top is also screwed with one adjusting screw 9, when installing, adjusting screw 9 can be passed through the opening slot on the annular protruding plate on aluminium alloy hanging piece 4 top side and screwed into the vertical screw hole on aluminium alloy hanging seat 3 top, so that aluminium alloy hanging piece 4 can be fixed in front of aluminium alloy hanging seat 3, and when tightening adjusting screw 9, fiber cement board 7 can also be fine-tuned, so that the edge position of fiber cement board 7 is tightly attached to the cylindrical protruding strip on another fiber cement board 7.
[0029] In the embodiments of the present disclosure, as Figures 1 to 5 As shown in the drawings, the top of the aluminum alloy hanging piece 4 is provided with an annular raised plate, and the adjusting screw 9 can pass through the opening slot on the annular raised plate and be screwed into the vertical threaded hole at the top of the aluminum alloy hanging seat 3. During installation, the adjusting screw 9 can pass through the opening slot on the annular raised plate at the top of the aluminum alloy hanging piece 4 on one side and be screwed into the vertical threaded hole at the top of the aluminum alloy hanging seat 3, so that the aluminum alloy hanging piece 4 can be fixed in front of the aluminum alloy hanging seat 3, and the fiber cement board 7 can be fine-tuned when the adjusting screw 9 is tightened, so that the edge position of the fiber cement board 7 is tightly attached to the cylindrical raised strip on the other fiber cement board 7.
[0030] As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed. Figure 1 、 Figure 2 and Figure 4 As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed.
[0031] As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed. Figure 1 、 Figure 2 and Figure 4 As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed.
[0032] As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed. Figures 1 to 5 As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed.
[0033] Figures 1 to 3 As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed.
[0034] As shown in the drawings, the aluminum alloy hanging piece 4 is pre-installed on the rear outer wall of the fiber cement board 7 by the decorative rivet 6, and four or six aluminum alloy hanging pieces 4 are installed on each fiber cement board 7. During installation, the annular raised plate at the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, so that the position of the fiber cement board 7 is fixed. Figures 1 to 5 As shown, the mechanism screw 2, the limiting screw 5, the decorative rivet 6 and the adjusting screw 9 are all made of stainless steel, the front side of the decorative rivet 6 is arc-shaped, the mechanism screw 2, the limiting screw 5, the decorative rivet 6 and the adjusting screw 9 made of stainless steel will not rust and corrode, thereby ensuring the overall service life and installation strength, and the arc-shaped front side of the decorative rivet 6 can ensure the aesthetic effect.
[0035] The working principle of the embodiment is as follows: the fiber cement board 7 is first produced and processed according to requirements during production, the curtain wall keel 1 is first fixed on the wall surface through the expansion screw during installation, the aluminum alloy hanging piece 4 is then installed on the back of the fiber cement board 7 through the decorative rivet 6, and the aluminum alloy hanging seat 3 is then installed in front of the curtain wall keel 1 through the mechanism screw 2, at this time, the annular protruding plate on one side of the top of the aluminum alloy hanging piece 4 on the back of the fiber cement board 7 can be placed on the top of the aluminum alloy hanging seat 3, at this time, the limiting screw 5 can limit the aluminum alloy hanging piece 4, thereby positioning the height of the fiber cement board 7, then the adjusting screw 9 can be inserted into the vertical threaded hole at the top of the aluminum alloy hanging seat 3 through the opening slot on the annular protruding plate on one side of the top of the aluminum alloy hanging piece 4, thus the aluminum alloy hanging piece 4 can be fixed in front of the aluminum alloy hanging seat 3, and the fiber cement board 7 can be fine-tuned when the adjusting screw 9 is tightened, so that the edge position of the fiber cement board 7 is tightly attached to the cylindrical protruding strip on the other fiber cement board 7, finally, the sealant 8 can be applied in the gap between the fiber cement boards 7, thereby ensuring the sealing of the overall outer surface.
[0036] In this paper, the following points need to be noted:
[0037] 1. The drawings of the embodiments of the present disclosure only relate to the structures involved in the embodiments of the present disclosure, and other structures can refer to the general design.
[0038] 2. In the case of no conflict, the embodiments of the present disclosure and the features in the embodiments can be combined to obtain new embodiments.
[0039] The above is only a specific implementation of the present disclosure, but the protection scope of the present disclosure is not limited thereto, any person skilled in the art can easily think of changes or replacements within the technical range disclosed by the present disclosure, which should be covered within the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be subject to the protection scope of the claims.
Claims
1. A fiber-reinforced cementitious panel comprising: Curtain wall keel (1);It is characterized in that: One side of the curtain wall keel (1) is provided with an aluminum alloy hanging seat (3) through a mechanism screw (2);The aluminum alloy hanging seat (3) is provided with an aluminum alloy hanging piece (4) on one side of the top;A limiting screw (5) is installed on the aluminum alloy hanging seat (3);The aluminum alloy hanging piece (4) is provided with a fiber cement board (7) on one side through a decorative rivet (6);Adjacent fiber cement boards (7) are also filled with sealant (8);An adjusting screw (9) is also screwed on the top of the aluminum alloy hanging piece (4).
2. The fiber-reinforced installation cement board according to claim 1, wherein, The aluminum alloy hanging piece (4) is pre-installed on the rear side outer wall of the fiber cement board (7) through the decorative rivet (6), and four or six aluminum alloy hanging pieces (4) are installed on each fiber cement board (7).
3. The fiber-reinforced installation cement board according to claim 1, wherein, The top side of the aluminum alloy hanging piece (4) is provided with a ring-shaped raised plate, and the ring-shaped raised plate can be installed on the top of the aluminum alloy hanging seat (3).
4. The fiber-reinforced installation cement board according to claim 1, wherein, A horizontal threaded hole is provided on the aluminum alloy hanging seat (3), and the limiting screw (5) is screwed into the horizontal threaded hole on the aluminum alloy hanging seat (3).
5. The fiber-reinforced installation cement board according to claim 1, wherein, An opening slot is also provided on the ring-shaped raised plate on the top of the aluminum alloy hanging piece (4), and the adjusting screw (9) can pass through the opening slot on the ring-shaped raised plate and be screwed into the vertical threaded hole on the top of the aluminum alloy hanging seat (3).
6. The fiber-reinforced installation cement board according to claim 1, wherein, A cylindrical raised strip is provided on one side edge outer wall of the fiber cement board (7), and the sealant (8) is applied in front of the cylindrical raised strip.
7. The fiber-reinforced installation cement board according to claim 1, wherein, The mechanism screw (2), the limiting screw (5), the decorative rivet (6) and the adjusting screw (9) are all stainless steel structures, and the front side of the decorative rivet (6) is an arc surface.