Precast pile foundation connecting device of power collection line power transmission tower

By using precast concrete piles and connecting devices welded and bolted together in the transmission towers of power collection lines, the problems of long construction period and uneconomical operation were solved, achieving structural safety and economy while meeting the load-bearing requirements.

CN223535754UActive Publication Date: 2025-11-11HENNAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423165548.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-22
Publication Date
2025-11-11
Estimated Expiration
2034-12-22

AI Technical Summary

Technical Problem

In the existing technology, the connection method between the tower foot and the foundation of the power transmission line has the problems of long construction period, large amount of project and uneconomical. Traditional concrete cast-in-place piles are not suitable for the layout of precast concrete piles, resulting in redundant bearing capacity.

Method used

Precast concrete piles are used, and the tower feet are tightly connected to the precast piles through a connecting device. Welding and bolting are used to reduce the pile diameter to save costs, and a whole structure is formed by cross-welded support steel plates and reinforcing steel plates.

Benefits of technology

It achieves structural safety and economy, has a fast construction speed, reduces construction difficulty and cost, and meets load-bearing requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223535754U_ABST
    Figure CN223535754U_ABST
Patent Text Reader

Abstract

A current collection line power transmission tower precast pile foundation connecting device comprises a precast pile, the top of the precast pile is connected with a bottom plate, and the bottom plate is connected with a tower foot through a connecting device; the connecting device comprises supporting steel plates which are welded together in a crossed mode, reinforcing steel plates are welded to the two sides of the supporting steel plates, and a top plate is connected to the upper portions of the supporting steel plates and connected with tower feet of the current collection line power transmission tower. The precast pile is a concrete precast pile, and an end plate is welded to the top of the pile end of the precast pile. The bottom plate is connected with the upper reinforcing steel plate and the supporting steel plate into a whole through welding, and the lower portion of the bottom plate is connected with the end plate of the pile top of the precast pile through surrounding welding. The tower foot of the power transmission tower of the current collection line is tightly connected with the precast pile through the connecting device, the safety requirement of the structure is met, the strength of the structure is guaranteed through welding and bolt connection, construction is convenient, time and capital cost are saved, and good economical efficiency is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a connection device for precast pile foundation of power transmission tower. Background Technology

[0002] In actual engineering, the tower feet and foundations of power transmission line towers are generally connected by anchor bolts. In order to ensure the strength of the connection and the durability of the components, the bolt spacing and the outer concrete protective layer must meet certain size requirements. This requires that the concrete cast-in-place piles for embedding anchor bolts be large enough to meet the structural requirements. Foundations designed in this way often have redundant bearing capacity, and the construction period of cast-in-place piles is long and the amount of work is large, which does not meet the requirements of economy.

[0003] Precast concrete piles are widely used in various engineering structures due to their advantages such as high bearing capacity, good durability, simple construction process, and low cost. However, due to the hollow structure of cast-in-place concrete piles, it is not conducive to the installation of anchor bolts. Therefore, the foundations of power transmission line towers generally still use traditional cast-in-place concrete piles, rather than precast concrete piles which are more economical and safer. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a connection device for precast pile foundation of power transmission towers, which addresses the shortcomings of the existing technology.

[0005] The specific technical solution of this utility model is as follows:

[0006] A precast pile foundation connection device for a power transmission tower includes a precast pile, a base plate connected to the top of the precast pile, and the base plate connected to the tower foot through a connection device.

[0007] The connecting device includes support steel plates welded together in a cross shape, reinforcing steel plates welded on both sides of the support steel plates, and a top plate connected to the upper part of the support steel plates. The top plate is connected to the tower foot of the power transmission tower.

[0008] The precast piles are made of precast concrete, and an end plate is welded to the top of the pile end. The bottom plate is welded to the upper reinforcing steel plate and supporting steel plate to form a whole. The lower part of the bottom plate is connected to the end plate at the top of the precast pile by welding.

[0009] The beneficial effects of this utility model are as follows: This utility model uses a connecting device to tightly connect the tower foot of the power transmission tower and the precast pile together, which meets the structural safety requirements. The use of welding and bolt connection not only ensures the strength of the structure, but also facilitates construction, saves time and money, and has good economic benefits. Attached Figure Description

[0010] Figure 1A schematic diagram of the connection between the tower foot and the precast pile foundation of the power transmission tower.

[0011] Figure 2 This is a schematic diagram of the connection device;

[0012] Figure 3 This is a schematic diagram of a precast concrete pile. Detailed Implementation

[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0014] In the description of this utility model, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0015] like Figure 1 , Figure 2 , Figure 3 As shown, a precast pile foundation connection device for a power transmission tower includes a precast pile 1, a base plate 2 connected to the top of the precast pile 1, and the base plate 2 connected to the tower foot 4 through a connection device 3.

[0016] The connecting device 3 includes a support steel plate 31 welded together in a cross shape, a reinforcing steel plate 32 welded on both sides of the support steel plate 31, and a top plate 33 connected to the upper part of the support steel plate 31. The top plate 33 is connected to the tower foot 4 of the power transmission tower.

[0017] Precast pile 1 is a precast concrete pile, and an end plate 11 is welded to the top of the pile end. The bottom plate 2 is welded to the upper reinforcing steel plate 32 and supporting steel plate 31 to form a whole. The lower part of the bottom plate 2 is connected to the end plate 11 at the top of the precast pile 1 by perimeter welding. Figure 3 As shown. Anchor bolts are not arranged in precast pile 1. Under the condition of meeting the bearing capacity, piles with smaller diameters can be appropriately selected to save costs. The connection method of the node is welding and bolt connection, which makes on-site construction less difficult and faster.

[0018] In summary, the connecting device 3 tightly connects the tower foot of the power transmission tower and the precast pile 1 together, meeting the structural safety requirements. The use of welding and bolting connections ensures the structural strength, facilitates construction, saves time and money, and has good economic efficiency.

[0019] The above description is only a preferred embodiment of the present utility model. It should be noted that those skilled in the art can make several changes and improvements without departing from the overall concept of the present utility model, and these should also be considered within the protection scope of the present utility model.

Claims

1. A connection device for precast pile foundations of transmission towers for power collection lines, characterized in that: Includes precast piles (1), with a base plate (2) connected to the top of the precast piles (1), and the base plate (2) is connected to the tower foot (4) through a connecting device (3); The connecting device (3) includes a support steel plate (31) welded together in a cross shape, a reinforcing steel plate (32) welded on both sides of the support steel plate (31), a top plate (33) connected to the upper part of the support steel plate (31), and the top plate (33) connected to the tower foot (4) of the power transmission tower of the collection line.

2. The precast pile foundation connection device for a power transmission tower according to claim 1, characterized in that: The precast pile (1) is a precast concrete pile. The top of the pile end of the precast pile (1) is welded with an end plate (11). The bottom plate (2) is connected to the upper reinforcing steel plate (32) and the supporting steel plate (31) by welding. The lower part of the bottom plate (2) is connected to the end plate (11) at the top of the precast pile (1) by welding.