Fixing support for pipeline installation
By designing a fixed support system that combines a frame plate and expansion joints, the problem of the difficulty in easily removing pipe installation supports in existing technologies has been solved, enabling convenient pre-embedding and removal of pipes in water conservancy projects and reducing construction costs.
Patent Information
- Application Number
- CN202520104810.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2035-01-16
AI Technical Summary
Existing pipeline installation supports make it difficult to facilitate the convenient removal and reuse of pipelines in water conservancy projects, leading to increased construction costs.
A fixed bracket including a frame plate, support rollers, moving wheels, telescopic components, and angle adjustment components was designed. The frame plate transports the pipes, and the telescopic components and clamping plates are used to fix and remove the pipes, adapting to the support requirements of different pre-buried pits.
It enables convenient pre-laying and removal of pipelines in water conservancy projects, reduces construction costs, and is suitable for pre-laying and installing multiple pipelines along long routes.
Smart Images

Figure CN223563622U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pipeline installation related technical field, concretely is a fixed support for pipeline installation. BACKGROUND
[0002] With the continuous development of society, the continuous progress of industry, water is the precious resource indispensable for human production and life, but its natural state does not completely meet the needs of human beings. Only by building water conservancy project, can control water flow, prevent flood disasters, and carry out water regulation and distribution to meet the needs of people's life and production on water resources, water conservancy project when carrying out pipeline installation, need to dig out the pre -buried pit first, then install the pipeline into the pre -buried pit.
[0003] The prior art patent with the announcement number CN212986415U discloses a fixed support for pipeline installation, including support plate, both sides of support plate symmetry weld have the support column, the upper end surface of support column is slidably provided with extrusion plate, the middle part of extrusion plate upper end surface is provided with through -hole, and the T-shaped rod is slidably inserted into the through -hole, the T-shaped rod includes horizontal part and vertical part, and the upper end surface of T-shaped rod vertical part is welded with upper clamp, the middle part of support plate upper end surface is welded with lower clamp, the both ends of upper clamp and lower clamp are inserted with connecting rod, the both ends of connecting rod are provided with threaded part, and the threaded part is screwedly connected with nut. The support fixes the pipeline through the upper clamp and the lower clamp, so that the pipeline is well fixed, and also can play a certain buffering and damping effect, and reduces the maintenance cost, but the following problems are still found during use, first, after the support fixes the pipeline, it is not convenient to withdraw the pipeline after the pipeline installation is completed, and in the pipeline burying work of water conservancy project, the pipeline needs to be fixed in the pre -buried pit first, and then the pipeline is pre -buried, and the support needs to be withdrawn after the pipeline is buried to be reused, and although the support and the pipeline are pre -buried together, it can avoid disassembly and assembly, but in the long -distance pipeline pre -buried work, it can greatly increase the construction cost, and it is not suitable for the pipeline fixing work of water conservancy project, therefore, the technical personnel in the art proposes a fixed support for pipeline installation to solve the problems in the above background. UTILITY MODEL CONTENTS
[0004] The utility model aims at providing a fixed support for pipeline installation to solve the problems in the above background.
[0005] In order to achieve the above -mentioned purpose, the utility model provides the following technical scheme:
[0006] The utility model provides a fixed support for pipeline installation, including frame board, the middle part of the bottom end of frame board is provided with a plurality of notches along its length direction, the support roller is installed in the notch, the action wheel is installed to both sides of the bottom end of frame board, the both sides of frame board are provided with side frame, the inner side wall of side frame is installed with third telescopic spare, third telescopic spare is transversely arranged, the mutual approach one end of third telescopic spare in both sides of frame board is connected with clamping plate, the outer side wall of top of frame board is installed with first telescopic spare, first telescopic spare is transversely arranged, the one end of first telescopic spare away from frame board is installed with angle adjusting assembly, the side of angle adjusting assembly is connected with the top of support plate, and the support plate is used for reinforcing and supporting the inner side wall of preburied pit, and the angle adjusting assembly is used for adjusting the use angle of support plate.
[0007] As a further scheme of the utility model: the angle adjusting assembly includes a first connecting plate, a second connecting plate, a third connecting plate and a second telescopic member, one end of the first connecting plate is rotatably connected with the end of the movable end of the first telescopic member, the other end of the first connecting plate is fixedly connected with the side wall of the support plate, one end of the second connecting plate is rotatably connected with the side of the movable end of the first telescopic member, the other end of the second connecting plate is rotatably connected with one end of the second telescopic member, the other end of the second telescopic member is rotatably connected with one end of the third connecting plate, and the other end of the third connecting plate is fixedly connected with the side wall of the support plate.
[0008] As a further scheme of the utility model: a rough treatment layer is arranged on the side wall of the support plate away from the frame plate.
[0009] As a further scheme of the utility model: the clamping plate is detachably installed on the end of the third telescopic member, the shape and size of the clamping plate are matched with the shape and size of the periphery of the pipeline, and an elastic non-slip pad is arranged on the inner periphery wall of the clamping plate.
[0010] As a further scheme of the utility model: a control box is installed on the outer wall of the frame plate, the first telescopic member, the second telescopic member and the third telescopic member are all selected as electric telescopic rods, and the first telescopic member, the second telescopic member, the third telescopic member and the control box are all connected in circuit.
[0011] The utility model has the advantages of the following: the fixed support transports the pipeline through the frame plate, the outer side of the frame plate is provided with the supporting plate through the first telescopic part and the angle adjusting assembly, the angle of the supporting plate is adjusted, the supporting plate can support the inner side wall of different pre -buried pits, the pre -buried pit is prevented from collapsing, the pipeline is clamped through the cooperation of the third telescopic part and the clamping plate, then the pipeline is transported and fixed, when the pipeline is pre -buried, the clamping of the pipeline can be released, the pipeline is withdrawn from the frame plate through the supporting roller while burying the pipeline, when the pipeline is completely buried, the pipeline is separated from the frame plate, the frame plate can be repeatedly used in the pre -buried installation of the multiple pipelines of long route in water conservancy engineering. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 It is the whole internal structure schematic view of the utility model embodiment.
[0013] Figure 2 It is the structure schematic view of the clamping plate in the utility model embodiment.
[0014] Figure 3 It is Figure 1 The enlarged schematic view of A part in
[0015] In the drawing: 1, pre -buried pit;2, frame plate;3, first telescopic part;4, angle adjusting assembly;5, supporting plate;6, rough processing layer;7, first connecting plate;8, second connecting plate;9, third connecting plate;10, second telescopic part;11, control box;12, side frame;13, third telescopic part;14, clamping plate;15, elastic antiskid pad;16, pipeline;17, action wheel;18, notch;19, supporting roller. DETAILED DESCRIPTION
[0016] The technical scheme of the utility model will be explained further in detail in combination with specific implementation manners.
[0017] Embodiment one: please refer to Figures 1 to 3The utility model provides a fixed support for pipeline installation, including frame board 2, the bottom end middle part of frame board 2 is provided with several notches 18 along its length direction equidistance, support roller 19 is installed in the notch 18, the bottom end both sides of frame board 2 are installed with action wheel 17, the both sides middle part of frame board 2 is provided with side frame 12, the inner side wall of side frame 12 is installed with third telescopic part 13, third telescopic part 13 is transversely arranged, the end of mutual approach of third telescopic part 13 in the both sides of frame board 2 is connected with clamping plate 14, the top outer wall of frame board 2 is installed with first telescopic part 3, first telescopic part 3 is transversely arranged, the end of first telescopic part 3 away from frame board 2 is installed with angle adjusting assembly 4, the side of angle adjusting assembly 4 is connected with the top of support plate 5, and support plate 5 is used to reinforce and support the inner side wall of pre-buried pit 1, and angle adjusting assembly 4 is used to adjust the angle of use of support plate 5.
[0018] Please refer to Figure 1 、 Figure 3 , the angle adjusting assembly 4 includes first connecting plate 7, second connecting plate 8, third connecting plate 9 and second telescopic part 10, one end of first connecting plate 7 is rotatably connected with the end of the movable end of first telescopic part 3, the other end of first connecting plate 7 is fixedly connected with the side wall of support plate 5, one end of second connecting plate 8 is rotatably connected with the side of the movable end of first telescopic part 3, the other end of second connecting plate 8 is rotatably connected with one end of second telescopic part 10, the other end of second telescopic part 10 is rotatably connected with one end of third connecting plate 9, the other end of third connecting plate 9 is fixedly connected with the side wall of support plate 5, and the side outer wall of support plate 5 away from frame board 2 is provided with rough treatment layer 6, to ensure the support effect of the inner wall of pre-buried pit 1.
[0019] Example two: please refer to Figure 1 , on the basis of example one, the clamping plate 14 is detachably installed at the end of third telescopic part 13, the shape and size of clamping plate 14 are opposite to the shape and size of the periphery of pipeline 16, and elastic non-slip pad 15 is arranged on the inner circumferential wall of clamping plate 14.
[0020] Please refer to Figure 1 , the outer wall of frame board 2 is provided with control box 11, first telescopic part 3, second telescopic part 10 and third telescopic part 13 are all selected as electric telescopic rod, and first telescopic part 3, second telescopic part 10, third telescopic part 13 are all connected with control box 11 in circuit.
[0021] Working principle: in use, place the pipeline 16 on the supporting roller 19, so that the end of the pipeline 16 is exposed outside the frame plate 2, move the frame plate 2 in the pre-buried pit 1 through the action wheel 17, pull the frame plate 2 through the structure such as a rope, drive the pipeline 16 to move to the pre-buried site after the frame plate 2, drive the supporting plate 5 to rotate around the first connecting plate 7 as the rotating center through the extension or shortening of the second telescopic piece 10, adjust the angle of the supporting plate 5 to be parallel to the inner wall of the pre-buried pit 1, drive the supporting plate 5 to move through the first telescopic piece 3, so that the supporting plate 5 can support the inner wall of the pre-buried pit 1, ensure that the pre-buried pit 1 will not collapse when burying the pipeline, fill the soil to fill the part of the pipeline 16 exposed, then contact the clamping of the pipeline 16 and the support of the inner wall of the pre-buried pit 1, move the frame plate 2 a distance, the pipeline 16 remains stationary and moves relative to the frame plate 2 through the supporting roller 19, fix the pipeline 16 through the part of the pipeline 16 buried, so that the frame plate 2 successfully moves, then the pipeline 16 will extend a part compared to the frame plate 2, and then repeat the clamping of the pipeline 16 and the support of the inner wall of the pre-buried pit 1, then fill the part of the pipeline 16 that is newly exposed, until the whole pipeline 16 is buried, and the frame plate 2 is also separated from the pipeline 16.
[0022] It is apparent for those skilled in the art that the present application is not limited to the details of the foregoing exemplary embodiments, and the present application can be implemented in other concrete forms without departing from the spirit or essential characteristics of the present application. Therefore, the embodiments should be considered in all aspects as illustrative and not restrictive, and the scope of the present application is defined by the appended claims rather than the foregoing description, and it is intended to encompass all changes falling within the meaning and range of equivalents of the elements of the claims. Any reference signs in the claims should not be deemed to limit the claims involved.
[0023] In addition, it should be understood that although the present specification is described in terms of embodiments, not every embodiment contains only one independent technical solution, and the description of the specification is only for the sake of clarity, and those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can be combined appropriately to form other embodiments that those skilled in the art can understand.
Claims
1. A pipe installation fixing bracket, comprising a frame plate, characterized in that, The frame plate has several slots evenly spaced along its length at the bottom center, and support rollers are installed in the slots. Wheels are installed on both sides of the bottom of the frame plate. Side frames are provided at the center of both sides of the frame plate. A third telescopic member is installed on the inner wall of each side frame. The third telescopic member is horizontally oriented. Clamping plates are connected to the adjacent ends of the third telescopic members on both sides of the frame plate. A first telescopic member is installed on the top outer wall of the frame plate. The first telescopic member is horizontally oriented, and an angle adjustment component is installed at the end of the first telescopic member furthest from the frame plate. The side of the angle adjustment component is connected to the top of a support plate. The support plate is used to reinforce the inner wall of the pre-buried pit, and the angle adjustment component is used to adjust the operating angle of the support plate.
2. The pipe installation fixing bracket according to claim 1, characterized in that, The angle adjustment assembly includes a first connecting plate, a second connecting plate, a third connecting plate, and a second telescopic member. One end of the first connecting plate is rotatably connected to the movable end of the first telescopic member, and the other end of the first connecting plate is fixedly connected to the side wall of the support plate. One end of the second connecting plate is rotatably connected to the side of the movable end of the first telescopic member, and the other end of the second connecting plate is rotatably connected to one end of the second telescopic member. The other end of the second telescopic member is rotatably connected to one end of the third connecting plate, and the other end of the third connecting plate is fixedly connected to the side wall of the support plate.
3. A pipe installation fixing bracket according to claim 2, characterized in that, The outer wall of the support plate on the side away from the frame plate is provided with a roughened layer.
4. A pipe installation fixing bracket according to claim 1, characterized in that, The clamping plate is detachably installed at the end of the third telescopic member. The shape and size of the clamping plate are aligned with the outer shape and size of the pipe. An elastic anti-slip pad is provided on the inner wall of the clamping plate.
5. A pipe installation fixing bracket according to claim 2, characterized in that, A control box is installed on the outer wall of the frame plate. The first telescopic member, the second telescopic member, and the third telescopic member are all electric telescopic rods. The first telescopic member, the second telescopic member, and the third telescopic member are all connected to the control box by wiring.
Citation Information
Patent Citations
Fixing support for pipeline installation
CN212986415U