Vegetation vertical laying structure for mine restoration

By designing a vertical vegetation structure on the mine slope and using the main frame and cultivation chamber to fix the seedlings, the problem of difficult greening of the mine slope was solved, and the stability and ecological restoration of the slope were achieved.

CN223639777UActive Publication Date: 2025-12-09HEBEI SHENGJING AGRICULTURAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520030454.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-07
Publication Date
2025-12-09
Estimated Expiration
2035-01-07

AI Technical Summary

Technical Problem

The steep slopes of mines are mostly composed of rock layers, making it difficult for plants to grow. Existing technologies are insufficient for effective greening, resulting in high risks of soil erosion and geological disasters.

Method used

Design a vertical vegetation laying structure for mine restoration, including a main frame, partitions, cultivation chambers and positioning components. The main frame is fixed to the rock slope by the positioning components, and the cultivation chambers are fixed inside the main frame by the connecting components. The vegetation seedlings grow in the cultivation chambers to stabilize the soil and protect them.

Benefits of technology

It has achieved effective greening of rocky slopes, prevented soil erosion, enhanced slope stability, and reduced the risk of geological disasters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223639777U_ABST
    Figure CN223639777U_ABST
Patent Text Reader

Abstract

The utility model relates to a vertical laying vegetation structure for mine restoration, and belongs to the technical field of ecological restoration, the vertical laying vegetation structure for mine restoration is relatively simple in overall structure, and soil is conveniently added to a rock slope for vegetation cultivation, so that the effect of soil fixation on the rock slope is achieved through the vegetation grown by the vertical laying vegetation structure, soil loss of the steep slope is avoided, the slope is effectively greened, and the service life of the slope is prolonged. The device comprises a main frame; the multiple partition plates are fixedly connected into the main frame; the multiple culture bins are detachably connected into the main frame through connecting assemblies, and water seepage holes are formed in the bottoms of the multiple culture bins; the positioning assembly is arranged on the outer wall of the main frame and used for fixedly installing the main frame at the using position, the connecting assembly comprises a plurality of installing blocks, the installing blocks are correspondingly arranged on the culture bin, installing rings are arranged in the installing blocks, and installing bolts are rotationally arranged in the installing rings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of ecological restoration technology, and in particular to a vertical vegetation laying structure for mine restoration. Background Technology

[0002] As is well known, mining causes significant damage to the ecological environment, often resulting in numerous rock slopes on the mining hillsides. These slopes lack vegetation cover, leading to severe weathering and massive soil erosion. Furthermore, the rock slopes have extremely poor structural stability, making them highly susceptible to geological disasters such as landslides and mudslides. This not only exacerbates the damage to the ecological environment but also poses a significant threat to the safety of residents in the surrounding area. Therefore, it is necessary to carry out ecological restoration of the mined areas.

[0003] Currently, existing methods for ecological restoration generally involve planting vegetation to restore the mine's ecology, beautify the environment, and prevent soil erosion and landslides. However, the applicant has found that because the slopes of mines are steep and mostly composed of rock layers, it is difficult to support plant growth. It is also necessary to add soil to the slope surface, but steep slopes are prone to soil erosion, making it difficult to effectively green the slopes.

[0004] Therefore, in response to the aforementioned technologies, we propose a vertical vegetation laying structure for mine restoration. Utility Model Content

[0005] The purpose of this invention is to provide a vertical vegetation laying structure for mine restoration, so as to solve the problems mentioned in the background art.

[0006] To achieve the above objectives, this utility model provides the following technical solution:

[0007] A vertical vegetation structure for mine restoration includes:

[0008] Main framework;

[0009] Multiple partitions, the multiple partitions being fixedly connected within the main frame;

[0010] Multiple culture chambers are detachably connected to the main frame via connecting components, and each culture chamber has a drainage hole at its bottom.

[0011] A positioning component is disposed on the outer wall of the main frame and is used to fix the main frame in the usage position.

[0012] As a further embodiment of this utility model: the connecting component includes multiple mounting blocks, each of which is correspondingly disposed on the culture chamber. Each mounting block has a mounting ring inside it, and a mounting bolt is rotatably disposed inside the mounting ring. The mounting bolt is threadedly connected to the main frame and the partition through mounting holes.

[0013] As a further improvement of this utility model: the positioning component includes two positioning seats, which are respectively disposed on the outer wall of the main frame. A constraint ring is provided in the positioning seat, and a positioning stake is vertically slidably connected in the constraint ring.

[0014] As a further improvement of this utility model, a positioning disc is fixedly connected to multiple positioning stakes.

[0015] As a further improvement of this utility model: two strip handles are fixedly connected to the culture chamber, and the outer surface of the strip handles is fitted with an anti-slip rubber sleeve.

[0016] Compared with the prior art, the beneficial effects of this utility model are:

[0017] By setting up positioning components, the main frame is fixedly installed at the intended location on the rock slope through the cooperation of positioning seats, constraint rings, and positioning piles. Then, by setting up connecting components, the cultivation chamber is fixedly installed inside the main frame through the cooperation of mounting bolts, mounting blocks, and mounting rings. Plant seedlings carrying soil are then transplanted into the cultivation chamber. Through the growth of the plant seedlings, the purpose of soil stabilization and protection of the rock slope is achieved. Its overall structure is relatively simple, making it easy to add soil to the rock slope to cultivate vegetation. The growing vegetation plays a role in stabilizing the rock slope, preventing soil erosion on steep slopes, and effectively greening the slope. It has good practicality. Attached Figure Description

[0018] Figure 1 This is a three-dimensional structural schematic diagram of the overall main view of this utility model;

[0019] Figure 2 This is a three-dimensional structural schematic diagram of a partial cross-section of the overall main view of this utility model;

[0020] Figure 3 This utility model Figure 2 A magnified schematic diagram of the partial structure at point A in the middle;

[0021] Figure 4 This is a schematic diagram of the overall front view of the present invention.

[0022] In the diagram: 1. Main frame; 2. Partition; 3. Culture chamber; 4. Drainage hole; 5. Mounting block; 6. Mounting ring; 7. Mounting bolt; 8. Positioning seat; 9. Constraint ring; 10. Positioning stake; 11. Positioning plate; 12. Strip handle; 13. Anti-slip rubber sleeve. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0024] The present application will be further described in detail below with reference to the accompanying drawings.

[0025] Please see Figures 1-4 In this embodiment of the utility model, a vertical vegetation laying structure for mine restoration includes:

[0026] Main frame 1;

[0027] Multiple partitions 2 are fixedly connected within the main frame 1;

[0028] Multiple culture chambers 3 are detachably connected to the main frame 1 via connecting components, and each culture chamber 3 has a drainage hole 4 at its bottom.

[0029] A positioning component is disposed on the outer wall of the main frame 1 and is used to fix the main frame 1 in the usage position.

[0030] This mine restoration vertical vegetation structure can be used to fix the main frame 1 to the location on the rock slope by setting a positioning component. Then, by setting a connecting component, the cultivation chamber 3 is fixedly installed in the main frame 1. Then, the vegetation seedlings carrying soil are transplanted into the cultivation chamber 3. Thus, the growth of the vegetation seedlings can play a role in soil stabilization and protection of the rock slope.

[0031] exist Figure 1-3 In the middle: the connecting component includes multiple mounting blocks 5, each of which is correspondingly set on the culture chamber 3. Each mounting block 5 is provided with a mounting ring 6, and a mounting bolt 7 is rotatably set in the mounting ring 6. The mounting bolt 7 is threadedly connected to the main frame 1 and the partition plate 2 through mounting holes.

[0032] The mine restoration uses a vertical vegetation structure. With this structure, after the cultivation chamber 3 is placed inside the main frame 1, the cultivation chamber 3 can be fixedly installed inside the main frame 1 by rotating the mounting bolts 7. With the cooperation of the mounting bolts 7, mounting rings 6 and mounting blocks 5, the cultivation chamber 3 can be fixedly installed inside the main frame 1.

[0033] exist Figure 1-4In the middle: the positioning component includes two positioning seats 8, which are respectively set on the outer wall of the main frame 1. A constraint ring 9 is opened in the positioning seat 8, and a positioning post 10 is vertically slidably connected in the constraint ring 9. A positioning plate 11 is fixedly connected to multiple positioning posts 10. Two strip handles 12 are fixedly connected to the culture chamber 3, and the outside of the strip handles 12 is fixedly covered with anti-slip rubber sleeves 1313.

[0034] The mine restoration uses a vertically laid vegetation structure. With this structure, after the main frame 1 is placed in the use position, the positioning plate 11 can be pressed down to make the positioning plate 11 move its positioning column within the constraint ring 9, thereby embedding the positioning pile 10 into the soil and achieving the purpose of fixing and limiting the main frame 1.

[0035] The implementation principle of a vertical vegetation structure for mine restoration according to an embodiment of this application is as follows: First, the main frame 1 is fixedly installed at the location of use on the rock slope by the cooperation of positioning seat 8, constraint ring 9 and positioning pile 10. Then, the cultivation chamber 3 is fixedly installed in the main frame 1 by the cooperation of installation bolt 7, installation block 5 and installation ring 6. Then, the vegetation seedlings carrying soil are transplanted into the cultivation chamber 3. Thus, the growth of the vegetation seedlings in the cultivation chamber 3 plays a role in soil stabilization and protection of the rock slope, avoiding soil loss on steep slopes, and effectively greening the slope.

[0036] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A vertically laid vegetation structure for mine restoration, characterized in that, include: Main frame (1); Multiple partitions (2) are fixedly connected within the main frame (1); Multiple culture chambers (3) are detachably connected to the main frame (1) via connecting components, and each culture chamber (3) has a drainage hole (4) at its bottom. A positioning component is disposed on the outer wall of the main frame (1) and is used to fix the main frame (1) in the use position.

2. The vertical vegetation structure for mine restoration according to claim 1, characterized in that: The connecting assembly includes multiple mounting blocks (5), each of which is correspondingly disposed on the culture chamber (3). Each mounting block (5) has a mounting ring (6) inside it, and a mounting bolt (7) is rotatably disposed inside the mounting ring (6). The mounting bolt (7) is threadedly connected to the main frame (1) and the partition plate (2) through mounting holes.

3. The vertical vegetation structure for mine restoration according to claim 1, characterized in that: The positioning component includes two positioning seats (8), which are respectively disposed on the outer wall of the main frame (1). A constraint ring (9) is provided in the positioning seat (8), and a positioning pile (10) is vertically slidably connected in the constraint ring (9).

4. The vertical vegetation structure for mine restoration according to claim 3, characterized in that: Positioning discs (11) are fixedly connected to multiple positioning stakes (10).

5. The vertical vegetation structure for mine restoration according to claim 1, characterized in that: The culture chamber (3) is fixedly connected to two strip handles (12), and the outer surface of the strip handles (12) is fitted with anti-slip rubber sleeves (13).