Condensation, adsorption and RTO furnace integrated waste gas treatment device
The waste gas treatment device, which integrates condensation, adsorption, and RTO furnace, solves the purification problem of complex VOCs waste gas in the petrochemical industry by utilizing a dual-channel oil-gas cooling structure and multi-stage condensation treatment, achieving rapid and effective purification and emission of waste gas.
Patent Information
- Application Number
- CN202520033758.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2035-01-08
AI Technical Summary
Existing technologies are insufficient to effectively treat the complex VOCs waste gas from the petrochemical industry, especially waste gas with complex composition, high concentration, and high flammability and explosiveness.
The waste gas treatment device, which integrates condensation, adsorption, and RTO furnace, achieves stable operation and rapid purification of waste gas through a dual-channel oil-gas cooling structure, condensation unit, combustion chamber, and multi-stage condensation treatment, combined with a heat storage chamber and chimney system.
It achieves rapid and effective purification of complex VOCs waste gas, ensuring that the waste gas is fully oxidized and sulfur compounds are removed at the set temperature, thus achieving a highly efficient waste gas treatment effect.
Smart Images

Figure CN223668920U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to waste gas treatment technical field, concretely is a kind of condensation and adsorption and RTO furnace integrated waste gas treatment device. BACKGROUND
[0002] With the increasingly strict VOCs emission policy of the competent department, the improvement of standard, the treatment technology is various, and the treatment effect is uneven, from early biological method technology, low-temperature plasma photochemical technology, activated carbon adsorption technology, to later direct combustion oxidizing furnace (TO), regenerative thermal oxidizing furnace (RTO), regenerative catalytic thermal oxidizing furnace (RCO), zeolite runner concentration, compression condensation technology etc.;Then the combination process of above technology, such as: activated carbon adsorption+concentration recovery technology, activated carbon adsorption+catalytic combustion technology, zeolite runner concentration+catalytic combustion technology, zeolite runner concentration+regenerative combustion technology etc.,Petrochemical industry because of complex waste gas composition, high concentration, flammable and explosive and become the difficulty of VOCs treatment, and many VOCs treatment enterprises hesitate. INVENTION CONTENTS
[0003] (I) technical problem solved
[0004] In view of the deficiency of prior art, the utility model provides a kind of condensation and adsorption and RTO furnace integrated waste gas treatment device, solve the problem of complex waste gas composition and not easy to handle.
[0005] (II) technical scheme
[0006] To achieve the above object, the utility model provides the following technical scheme: a kind of condensation and adsorption and RTO furnace integrated waste gas treatment device, including oil-gas loading and unloading area, oil-gas storage tank area, combustion chamber and chimney, the oil-gas loading and unloading area and oil-gas storage tank area are communicated by oil-gas communication pipe and two groups of oil-gas recovery system respectively, two groups of the oil-gas recovery system are communicated with explosion-proof induced draft fan, first regenerative chamber, second regenerative chamber and third regenerative chamber by oil-gas communication pipe, and first regenerative chamber, second regenerative chamber and third regenerative chamber are all set in the bottom of combustion chamber, the combustion chamber is communicated with combustion air fan, and the top of combustion chamber is provided with explosion vent, the combustion chamber, first regenerative chamber, second regenerative chamber and third regenerative chamber are all communicated by oil-gas communication pipe and chimney.
[0007] Preferably, the oil-gas recovery system is provided with a condensing unit.
[0008] Preferably, air communication port, three sets of emergency discharge ports and four sets of fire arresters are arranged on the oil-gas communication pipe.
[0009] (III) beneficial effects
[0010] Compared with the prior art, the waste gas treatment device integrated with condensation, adsorption and RTO furnace has the following beneficial effects:
[0011] The waste gas treatment device integrated with condensation, adsorption and RTO furnace has the following beneficial effects: BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 The utility model structure schematic diagram.
[0013] In the drawing: 1, combustion chamber;2, chimney;3, second regenerator;4, third regenerator;5, first regenerator;6, explosion -proof induced draft fan;7, air communication mouth;8, oil gas recovery system;9, fire arrester;10, oil gas loading and unloading area;11, oil gas storage tank area;12, emergency discharge port;13, explosion vent;14, combustion air fan. DETAILED DESCRIPTION
[0014] The technical scheme in the embodiments of the utility model will be described clearly and completely below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0015] Please refer to Figure 1The utility model provides a technical scheme: a kind of condensation and adsorption and RTO furnace integrated waste gas treatment device, including oil-gas loading and unloading area 10, oil-gas storage tank area 11, combustion chamber 1 and chimney 2, oil-gas loading and unloading area 10 and oil-gas storage tank area 11 are communicated respectively by oil-gas communication pipe and two groups of oil-gas recovery system 8, two groups of oil-gas recovery system 8 are double-channel oil-gas cooling structure, condensing unit is provided in oil-gas recovery system 8, two groups of oil-gas recovery system 8 are communicated with explosion-proof induced draft fan 6, first regenerator 5, second regenerator 3 and third regenerator 4 respectively by oil-gas communication pipe, and first regenerator 5, second regenerator 3 and third regenerator 4 are all arranged at the bottom of combustion chamber 1, combustion chamber 1 is communicated with combustion air fan 14, and the top of combustion chamber 1 is provided with explosion vent 13, combustion chamber 1, first regenerator 5, second regenerator 3 and third regenerator 4 are all communicated by oil-gas communication pipe and chimney 2, air communication port, pressure sensor, three sets of emergency discharge port 12 and four groups of fire arrester 9 are provided on oil-gas communication pipe, by double-channel oil-gas cooling structure, the device can be stably operated, simultaneously by setting condensing unit, material in waste gas is separated quickly, by setting combustion chamber 1, it can guarantee that waste gas can reach the set oxidation temperature, simultaneously guarantee that there is sufficient residence time and makes VOC in waste gas fully oxidize, thus purified waste gas enters cooling tower and lye washing tower to remove sulfur compound again, can be discharged into atmosphere by chimney 2, so that the waste gas with complex composition can be conveniently and quickly purified.
[0016] The oil gas is sent into the condensing unit of the oil gas recovery system 8 along the main oil gas pipeline via the explosion-proof induced draft fan 6 (a Roots induced draft fan capable of keeping the outlet pressure head constant, the actual position is determined by the process), the explosion-proof induced draft fan 6 and the pressure sensor installed on the main oil gas pipeline are interlocked, and the explosion-proof induced draft fan 6 is automatically operated in variable frequency according to the size of the exhaust amount; when the pipeline pressure reaches 500 Pa (the value can be adjusted according to the site condition), the explosion-proof induced draft fan 6 is started at low frequency, if the pressure continuously rises, the frequency is continuously increased, on the contrary, when the exhaust amount decreases, the pipeline pressure decreases, and the frequency of the explosion-proof induced draft fan 6 is also reduced accordingly until the explosion-proof induced draft fan 6 is stopped; the oil gas enters the back heat exchange with the low-temperature gas after condensation treatment, the initial cooling is realized by using the waste heat, then the oil gas enters the condensing unit for multi-stage gradient condensation: first, the oil gas is cooled to 3-5 ℃ (which can be adjusted according to different materials) in the first cold box, and part of the material and water are condensed out, then the oil gas is cooled to-20 to-30 ℃ in the second cold box, and part of the material is separated out, then the oil gas is cooled to-65 to-75 ℃ in the third cold box, and part of the material is further separated out, at this time, most of the material is separated out, then the waste gas enters the combustion chamber 1, the waste gas is burned in the combustion chamber 1, becomes the purified high-temperature gas, and leaves the combustion chamber 1, enters the second regenerative chamber 3 (which has been cooled in the previous cycle), is discharged after heat release and cooling, and the second regenerative chamber 3 is heated after absorbing a large amount of heat (used for heating the waste gas in the next cycle), the purified waste gas enters the cooling tower and the caustic soda washing tower to remove sulfur compounds, is discharged into the atmosphere through the chimney 2, and the combustion-supporting fan 14 blows the third regenerative chamber 4, after the cycle is completed, the inlet valve and the outlet valve are switched once, the next cycle is entered, the waste gas enters the second regenerative chamber 3, and the third regenerative chamber 4 is discharged, after the switching, the first regenerative chamber 5 is purged, and the alternation is realized.
[0017] Although the embodiments of the present application have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and modifications can be made to the embodiments without departing from the principles and spirits of the present application, the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A waste gas treatment device integrating condensation and adsorption and RTO furnace, comprising an oil gas loading and unloading area (10), an oil gas storage tank area (11), a combustion chamber (1) and a chimney (2), characterized in that: The oil and gas loading and unloading area (10) and the oil and gas storage tank area (11) are communicated through oil and gas communication pipes and two groups of oil and gas recovery systems (8), the two groups of oil and gas recovery systems (8) are communicated with the explosion-proof induced draft fan (6), the first regenerative chamber (5), the second regenerative chamber (3) and the third regenerative chamber (4) through oil and gas communication pipes, and the first regenerative chamber (5), the second regenerative chamber (3) and the third regenerative chamber (4) are all arranged at the bottom of the combustion chamber (1), the combustion chamber (1) is communicated with the combustion air fan (14), and the top of the combustion chamber (1) is provided with an explosion vent (13), and the combustion chamber (1), the first regenerative chamber (5), the second regenerative chamber (3) and the third regenerative chamber (4) are all communicated through oil and gas communication pipes and the chimney (2).
2. The waste gas treatment device integrated with condensation, adsorption and RTO furnace according to claim 1, characterized in that: The oil and gas recovery system (8) is provided with a condensing unit.
3. The waste gas treatment device integrated with condensation, adsorption and RTO furnace according to claim 1, characterized in that: Air communication openings, three groups of emergency discharge openings (12) and four groups of flame arresters (9) are arranged on the oil and gas communication pipe.