Novel concrete mixing plant
By dividing the concrete preparation process into two steps, first pre-fabricating cement fly ash mortar in a closed space and then transporting it to the terminal mixer, the problems of dust generation and large equipment scale are solved, and environmentally friendly and efficient concrete production is achieved.
Patent Information
- Application Number
- CN202520053505.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2035-01-10
AI Technical Summary
Existing concrete preparation methods suffer from poor dust suppression and require large-scale mixing plants, making it difficult to effectively address dust generation and equipment size issues.
The concrete preparation process is divided into two steps. First, cement fly ash mortar is precast in a closed space. Then, it is transported to the terminal mixer and mixed with weighed aggregate. Finally, the concrete preparation is completed in the terminal mixer. The cement fly ash precasting mechanism and the terminal concrete preparation mechanism are made of retractable and foldable structure.
It effectively suppresses dust and reduces the footprint of equipment, achieving environmentally friendly and efficient concrete production.
Smart Images

Figure CN223719828U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to concrete processing technical field relates to a novel concrete mixing station. BACKGROUND
[0002] The conventional concrete preparation method is to utilize the concrete production line or mixing station to input cement, fly ash, sand, fine sand and additive etc. in turn into the stirrer according to certain proportion and order to stir, and after reaching the suitable state, it is excluded to obtain the required concrete finally. The defect of this traditional preparation mode is that the dust cannot be inhibited well, and a relatively huge mixing station needs to be established, based on this, the utility model provides a kind of innovative concrete preparation device. SUMMARY
[0003] The technical problem to be solved by the utility model is the defect of background art, provide a kind of novel concrete mixing station, the mixing station will be the traditional concrete preparation into two steps, effectively solve the dust flying dust and the problem such as the large land occupation of concrete production line.
[0004] In order to solve the above technical problem, the technical scheme of the utility model is as follows: a kind of novel concrete mixing station, including cement fly ash prefabrication mechanism and terminal concrete preparation mechanism;The terminal concrete preparation mechanism includes aggregate weighing mechanism, aggregate conveying belt mechanism and terminal stirrer;The aggregate weighing mechanism is placed above the aggregate conveying belt mechanism, the aggregate conveying belt mechanism is used to convey aggregate, the aggregate conveying belt mechanism includes aggregate output belt mechanism, relay material groove and aggregate input belt mechanism in turn;The cement fly ash prefabrication mechanism is used to prepare cement fly ash mortar, and the prepared cement mortar is conveyed to the terminal stirrer by material conveying pipe.
[0005] Preferably, the material conveying pipe is provided with a material conveying pump.
[0006] As preferred, the aggregate weighing mechanism at least includes a first aggregate weighing device, a second aggregate weighing device and a third aggregate weighing device.
[0007] Preferably, the cement fly ash prefabrication mechanism and the terminal concrete preparation mechanism are both telescopic folding structures.
[0008] Preferably, the bottom of the cement fly ash prefabrication mechanism and the terminal concrete preparation mechanism is provided with a plurality of pads.
[0009] Compared with the prior art, the utility model has the beneficial effects that:
[0010] The utility model discloses a cement, fly ash in the concrete preparation process of easy dust is prefabricated in a closed space, then the prefabricated cement fly ash mortar is transported to the terminal stirrer, finally the aggregate of weighing is sent into the terminal stirrer and carries out the final preparation, and the traditional concrete preparation mode of one step is divided into two steps, because the cement fly ash prefabrication mechanism of the utility model can carry out dust removal and prefabricate cement fly ash mortar well, and cement and fly ash are the biggest source of dust, and the problem of dust in the concrete preparation process is solved through this link, therefore, the utility model effectively solves the problem such as dust in the concrete production process, is the innovative equipment of concrete production. BRIEF DESCRIPTION OF DRAWINGS
[0011] Figure 1 It is the overall perspective drawing of the novel concrete mixing station of the utility model;
[0012] Figure 2 It is the right view of Figure 1
[0013] Figure 3 It is the front view of the terminal concrete preparation mechanism 2 of the novel concrete mixing station of the utility model. DETAILED DESCRIPTION
[0014] The specific implementation of the utility model is further explained below in combination with the drawings. It needs to be explained here that the explanation of these implementation modes is used to help understanding the utility model, but does not constitute the limitation to the utility model. In addition, the technical features involved in each implementation of the utility model described below can be combined with each other as long as they do not conflict with each other.
[0015] As Figures 1 to 3 As shown, the utility model discloses a novel concrete mixing station, and specifically it includes cement fly ash prefabrication mechanism 1 and terminal concrete preparation mechanism 2;Among the utility model of cement fly ash prefabrication mechanism 1 with the invention patent of prior application, application number is: 2024118560853, name is: a multifunctional powder storage and slurry prefabrication device completely identical, the device has the function of preparing cement fly ash mortar, and can remove the dust generated, and the structure and function refer to the application text, so here no more, the utility model's terminal concrete preparation mechanism 2 includes aggregate weighing mechanism 21, aggregate conveyor belt mechanism 22 and terminal mixer 23;Aggregate weighing mechanism 21 according to the patent of prior application, its announcement number CN220179730U, name is: a batching system.The utility model, aggregate weighing mechanism 21 includes at least one first aggregate weighing device 211, two second aggregate weighing devices 212 and three third aggregate weighing devices 213, and three different levels of aggregates can be weighed by setting three aggregate weighing devices.Aggregate weighing mechanism 21 is placed above aggregate conveyor belt mechanism 22, aggregate conveyor belt mechanism 22 is used to convey aggregate, and aggregate conveyor belt mechanism 22 includes aggregate output belt mechanism 221, relay chute 222 and aggregate input belt mechanism 223 in turn.Aggregate weighing mechanism 1 is used to prepare cement fly ash mortar, and the prepared cement mortar is conveyed to terminal mixer 23 through feed pipe 3, and a feed pump is arranged on feed pipe 3, and the feed pump is used to extract materials from cement fly ash prefabrication mechanism 1 to terminal mixer 23.In order to facilitate the placement of the entire equipment, the bottom of cement fly ash prefabrication mechanism 1 and terminal concrete preparation mechanism 2 is provided with several pads 4.
[0016] Of course, in order to facilitate handling and disassembly, cement fly ash prefabrication mechanism 1 and terminal concrete preparation mechanism 2 are both telescopic folding structures, and such disassembly structure can be realized according to the structure of the prior application, so here no more.
[0017] The utility model specifically works as follows: the mixing station of the utility model prepares concrete in two steps, first step: prefabrication of cement fly ash mortar, using cement fly ash prefabrication mechanism 1, after prefabricating cement fly ash mortar in cement fly ash prefabrication mechanism 1, using feed pump and feed pipe 3 to input cement fly ash mortar into terminal mixer 23;Second step: terminal preparation, start terminal mixer 23, under the condition that terminal mixer 23 is continuously stirred, weigh aggregate, after weighing aggregate, use aggregate conveyor belt mechanism 22 to input it into terminal mixer 23, and the prepared concrete can be obtained after stirring in terminal mixer 23 for a certain time.
[0018] The embodiments of the present application are described in detail in combination with the drawings, but the present application is not limited to the described embodiments. For those skilled in the art, various changes, modifications, replacements and variations of the embodiments can be made without departing from the principles and spirits of the present application, and still fall within the protection scope of the present application.
Claims
1. A new type of concrete mixing plant, characterized in that, The cement fly ash pre-preparation mechanism (1) and the terminal concrete preparation mechanism (2) are included; the terminal concrete preparation mechanism (2) includes the aggregate weighing mechanism (21), the aggregate conveying belt mechanism (22) and the terminal mixer (23); the aggregate weighing mechanism (21) is arranged above the aggregate conveying belt mechanism (22), the aggregate conveying belt mechanism (22) is used for conveying aggregate, and the aggregate conveying belt mechanism (22) includes the aggregate output belt mechanism (221), the transfer chute (222) and the aggregate input belt mechanism (223) in turn; the cement fly ash pre-preparation mechanism (1) is used for preparing cement fly ash mortar, and the prepared cement fly ash mortar is conveyed into the terminal mixer (23) through the conveying pipe (3).
2. The new concrete mixing plant according to claim 1, characterized in that The conveying pipe (3) is provided with a conveying pump.
3. The new concrete mixing plant according to claim 2, characterized in that The aggregate weighing mechanism (21) at least includes the first-stage aggregate weighing device (211), the second-stage aggregate weighing device (212) and the third-stage aggregate weighing device (213).
4. A new concrete mixing plant according to any one of claims 1 to 3, characterised in that, The cement fly ash pre-preparation mechanism (1) and the terminal concrete preparation mechanism (2) are both telescopic folding structures.
5. A new concrete mixing plant according to any one of claims 1 to 3, characterised in that, The bottom of the cement fly ash pre-preparation mechanism (1) and the terminal concrete preparation mechanism (2) is provided with a plurality of cushion blocks (4).