Bridge wet joint template structure

By combining the monolithic template structure with water-stop bolts, hanging rods, and other components, the problem of low installation efficiency and easy grout leakage in traditional bridge wet joint templates has been solved, achieving a construction effect that is both efficient and less prone to grout leakage.

CN223723619UActive Publication Date: 2025-12-26CHINA RAILWAY SIXTH GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520226593.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-13
Publication Date
2025-12-26
Estimated Expiration
2035-02-13

AI Technical Summary

Technical Problem

Traditional bridge wet joint formwork suffers from low installation efficiency and is prone to grout leakage.

Method used

The use of a single-piece template structure, combined with a combination of water-stop screws, hanging rods, mountain-shaped clips, and limit nuts, ensures the template is fixed and prevents grout leakage.

Benefits of technology

It improved construction efficiency, prevented grout leakage, and enhanced construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223723619U_ABST
    Figure CN223723619U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of bridge construction, and particularly relates to a bridge wet joint formwork structure. Comprising a formwork body, the formwork body is installed at the bottom of a wet joint between two split beams, four water stop screws are fixedly installed on the upper surface of the formwork body and distributed in a rectangular shape, two sets of mutually-horizontal hanging sticks are transversely placed on the tops of the two split beams, each set of hanging sticks comprises two mutually-horizontal hanging sticks, and the two sets of hanging sticks are arranged on the upper surface of the formwork body. The upper portions of the four water stop screws are sleeved with mountain-shaped clamps respectively, the portions, located at the top ends of the mountain-shaped clamps, of the water stop screws are in threaded connection with limiting nuts used for limiting the mountain-shaped clamps, and the mountain-shaped clamps are erected on the corresponding set of hanging rods respectively. According to the utility model, the whole template is used as the wet joint bottom template, so that splicing is not needed, the construction efficiency is improved, and the slurry leakage phenomenon is not easy to occur.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to bridge construction technical field, concretely relates to a bridge wet joint formwork structure. BACKGROUND

[0002] Wet joint refers to prestressed concrete beam body block prefabrication, when adopting cantilever assembly into large span continuous beam, the beam body adopts cast-in-situ concrete to connect the beam block into whole joint. Bridge wet joint is used for connecting T beam and box girder piece. Bridge wet joint is located in the transverse connection of T beam box girder, and it is usually adopted that hoop circle is in the middle and longitudinal reinforcement is passed to make the bridge deck form whole, then the same mark concrete as the beam body is poured.

[0003] In the traditional bridge construction, the formwork installation of wet joint usually adopts the way of block hoisting, and the efficiency is low and the wet joint is easy to leak. Therefore, it is urgent to design a bridge wet joint formwork structure with high construction efficiency and not easy to leak. UTILITY MODEL CONTENT

[0004] In view of the problems existing in the prior art, a bridge wet joint formwork structure is disclosed in the utility model, and the following technical scheme is specifically disclosed.

[0005] A bridge wet joint formwork structure, which comprises a formwork, the formwork is installed at the bottom of the wet joint between two split girders, the upper surface of the formwork is fixedly provided with four water stop screws, the four water stop screws are distributed in a rectangular shape, the top of the two split girders is horizontally provided with two groups of lifting poles, each group of lifting poles comprises two horizontal lifting poles, the upper part of the four water stop screws is respectively provided with a mountain-shaped clamp, the water stop screw is threadedly connected with a limiting nut for limiting the mountain-shaped clamp at the top end of the mountain-shaped clamp, and the mountain-shaped clamp is arranged on the corresponding group of lifting poles.

[0006] Further, the bottom end of the water stop screw penetrates the formwork and is fixedly connected with a water stop plate, and the water stop screw and the formwork are threadedly connected.

[0007] Further, the lifting pole is a reinforcing steel bar, and the two ends of the lifting pole are arranged on the top of the two split girders.

[0008] Further, a square fender is arranged between the lifting pole and the top of the split girder.

[0009] Further, the upper surface of the formwork is fixedly provided with a lifting ring, and the lifting ring is a steel wire rope with both ends fixed on the formwork.

[0010] Compared with the prior art, the utility model has the advantages that:

[0011] The utility model discloses use whole template as wet joint bottom template, thereby need not splicing, not only improved construction efficiency, but also not easy to have the phenomenon of leaking paste. BRIEF DESCRIPTION OF DRAWINGS

[0012] Fig. 1 It is the structure diagram of the template and the water stop screw in the utility model.

[0013] Fig. 2 It is the top view of the utility model.

[0014] Fig. 3 It is the structure diagram of the mountain type card in the utility model.

[0015] 1-template, 2-water stop screw, 3-sling ring, 4-sling stick, 5-mountain type card, 6-water stop plate, 7-limiting nut. DETAILED DESCRIPTION

[0016] The technical scheme in the embodiments of the utility model will be apparently and completely described below with reference to the drawings in the embodiments of the utility model, and apparently, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without making creative efforts belong to the range of protection of the utility model.

[0017] REFERENCE Figs. 1-3 , a kind of bridge wet joint template structure, including template 1, template 1 is installed in the bottom of wet joint between two split beams, and its upper surface is in contact with the bottom surface of split beam, the upper surface of template 1 is fixedly installed with four water stop screws 2, four water stop screws 2 are distributed in rectangle, the top of two split beams is placed with two groups of mutually horizontal sling stick, each group of sling stick includes two mutually horizontal sling sticks 4, the upper part of four water stop screws 2 is respectively sleeved with mountain type card 5, water stop screw 2 is threadedly connected with the limiting nut 7 for limiting mountain type card 5 on the top end of mountain type card 5, mountain type card 5 is respectively erected on corresponding sling stick, so as to utilize sling stick 4, mountain type card 5 and water stop screw 2 to fix template 1.

[0018] In the embodiment, the bottom end of water stop screw 2 penetrates template 1 and is fixedly connected with water stop plate 6, so as to avoid leaking paste, water stop screw 2 is threadedly connected with template 1.

[0019] In the embodiment, sling stick 4 is reinforcing bar, and the two ends of sling stick 4 are placed on the top of two split beams respectively.

[0020] In the embodiment, square fender is arranged between sling stick 4 and the top of split beam, so as to avoid that sling stick 4 causes damage to split beam and improve the stability of sling stick 4.

[0021] In the embodiment, the upper surface of the template 1 is fixedly provided with a lifting ring 3, and the lifting ring 3 is a steel wire rope with both ends fixed on the template 1, so as to facilitate hoisting the template 1 to the wet joint.

[0022] The utility model uses the whole template as the wet joint bottom template, so that the template does not need to be spliced, which not only improves the construction efficiency, but also avoids the phenomenon of slurry leakage.

[0023] The above is only the preferred embodiment of the utility model, and does not limit the technical range of the utility model, so any slight modification, equivalent change and modification of the above embodiment according to the technical essence of the utility model still belong to the range of the technical scheme of the utility model.

Claims

1. A bridge wet joint formwork structure, characterized by, The utility model provides a template, the template is installed the bottom of wet joint between two split body beams, the upper surface of template is fixedly installed with four water stop screw, four water stop screw is rectangular distribution, the top of two split body beams is placed with two groups of mutually horizontal hanger pole, each group of hanger pole includes two mutually horizontal hanger pole, the upper portion of four water stop screw is respectively set with mountain type card, the top end of water stop screw is threadedly connected with the limiting nut for limiting mountain type card, mountain type card is respectively erected on corresponding group of hanger pole.

2. A bridge wet joint formwork structure according to claim 1, wherein, The bottom end of the water stop screw penetrates the template and is fixedly connected with a water stop plate.

3. A bridge wet joint formwork structure according to claim 1, wherein, The hanger pole is a steel bar, and the two ends of the hanger pole are respectively placed on the top of the two split body beams.

4. A bridge wet-joint formwork structure according to claim 3, wherein, A square fender is arranged between the hanger pole and the top of the split body beam.

5. A bridge wet-cast joint form structure according to claim 1, wherein, A lifting ring is fixedly installed on the upper surface of the template, and the lifting ring is a steel wire rope with both ends fixed on the template.