Suspension type steel truss structure construction platform

By installing protective rods and hoisting components on the suspended steel truss structure construction platform, the problems of lack of safety protection and inconvenience in material handling on the construction platform were solved, achieving both safety and flexible adjustment.

CN223724126UActive Publication Date: 2025-12-26YUNXIA CONSTR GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520248155.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-17
Publication Date
2025-12-26
Estimated Expiration
2035-02-17

AI Technical Summary

Technical Problem

The existing suspended steel truss construction platform lacks safety protection components, which cannot effectively protect construction personnel. Furthermore, the platform lacks labor-saving lifting devices, making material handling inconvenient and preventing the adjustment of construction height according to needs.

Method used

A suspended steel truss construction platform was designed, which is assembled with three sets of vertical support components and locking components to build a climbing ladder. Guard rods and hoisting components are installed on the horizontal frame. The position of the horizontal frame can be adjusted through multiple bolt holes to achieve flexible adjustment. Safety protection is provided by the fixed plate and guard rods, and materials are lifted by hoisting components.

Benefits of technology

It ensures the safety of construction workers, reduces the number of times materials need to be moved, and allows for flexible adjustment of the platform height and position according to construction needs, thus improving ease of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223724126U_ABST
    Figure CN223724126U_ABST
Patent Text Reader

Abstract

The utility model discloses a suspension type steel truss structure construction platform, which belongs to the technical field of construction platforms, and comprises three groups of vertical supporting pieces, and each vertical supporting piece comprises two lower vertical frames and an upper vertical frame arranged above the lower vertical frames. The upper vertical frame and the lower vertical frame are matched with the lock catch component to be assembled, then the transverse frames arranged on the upper vertical frame and the lower vertical frame in a sleeving mode are fixed to the proper positions through the fixing bolts, the fixing plate is laid on the transverse frame on the uppermost layer and fixed through the bolts, and meanwhile the hoisting component is installed on the upper vertical frame on one section of the fixing plate. The protective rods are installed through the adaptive holes in the two ends of the transverse frame, constructors can be effectively protected, meanwhile, part of materials can be conveniently lifted through the hoisting component, the number of times of climbing up and down by workers is reduced, meanwhile, the positions of the transverse frame can be flexibly adjusted through the bolt holes formed in the outer walls of the upper vertical frame and the lower vertical frame, and the safety of the constructors is improved. And flexible adjustment can be carried out according to construction requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a construction platform, and more particularly to a suspended steel truss structure construction platform, belonging to the technical field of construction platform. Background Technology

[0002] Construction platforms are commonly made of steel scaffolding, which can be erected in multiple sections and is frequently used in building construction.

[0003] In the prior art, such as the Chinese authorized patent CN202322081087.7, a suspended steel truss structure construction platform, the platform can be quickly moved to the remaining construction position by pushing the vertical components under the action of the casters, making it more convenient to move. Furthermore, by providing a retractable support component, the platform can be well supported by adjusting the support component after it has been moved to the remaining construction position.

[0004] However, it lacks safety protection components on top, failing to effectively protect workers during construction. Furthermore, its work platform lacks labor-saving lifting devices, requiring workers to move materials up and down, making it inconvenient to use. In addition, conventional steel structure construction platforms are usually of fixed size and cannot be flexibly adjusted according to needs, further complicating their use. Utility Model Content

[0005] The main purpose of this utility model is to solve the problems of ineffective protection for workers during construction, lack of labor-saving lifting devices on the work platform, the need for workers to move materials up and down, inability to adjust the construction height, and inconvenience in use. Therefore, this utility model provides a suspended steel truss structure construction platform.

[0006] The objective of this utility model can be achieved by adopting the following technical solution:

[0007] A suspended steel truss structure construction platform includes three sets of vertical support members. Each vertical support member includes two lower vertical frames and an upper vertical frame installed above the lower vertical frames. A locking component is installed between the lower and upper vertical frames. Two horizontal frames are installed on both the upper and lower vertical frames by fixing bolts. Several assembly holes are opened on the outer walls of the upper and lower vertical frames. A fixing plate is installed on the horizontal frame located on the upper part of the upper vertical frame. A hoisting component is installed on the upper end of the set of vertical support members located on the left side.

[0008] Furthermore, the locking component includes a female buckle and a female buckle installed below the female buckle.

[0009] Further, the upper and lower ends of the upper vertical frame and the upper end of the lower vertical frame are provided with a buckle disc matched with the female buckle, and the male buckle is provided with a locking pin penetrating through the buckle disc.

[0010] Further, the two ends of the horizontal frame are provided with three matching holes, the upper end of the middle part of the horizontal frame is provided with two vertical fixing holes, three assembly holes are arranged between the two vertical fixing holes, and a horizontal connecting hole is arranged on the side wall of the middle part of the horizontal frame.

[0011] Further, the horizontal frame on the upper part of the upper vertical frame is provided with a protective rod.

[0012] Further, the three groups of vertical supports are provided with a connecting frame.

[0013] Further, the hoisting member comprises a supporting frame and a fixed pulley installed on the upper part of the supporting frame, and the fixed pulley is provided with a sling.

[0014] Further, a climbing ladder is installed on the right group of vertical supports.

[0015] Further, one end of the fixing plate is provided with an avoiding opening.

[0016] Further, the other end of the fixing plate is provided with a protrusion matched with the avoiding opening.

[0017] The beneficial technical effects of the present application are as follows: according to the suspension type steel truss structure construction platform of the present application, the upper vertical frame and the lower vertical frame are assembled by cooperating with the lock buckle member, then the horizontal frame wrapped on the upper vertical frame and the lower vertical frame is fixed at a suitable position by the fixing bolt, then the horizontal fixing is performed by the connecting frame, the climbing ladder is built, after completion, the fixing plate is laid on the uppermost horizontal frame and is fixed by the bolt, at the same time, the hoisting member is installed on the upper vertical frame of the fixing plate section, and the protective rod is installed through the matching holes at the two ends of the horizontal frame, which can effectively protect the construction personnel, at the same time, the hoisting member can facilitate the lifting of part of the materials, which can avoid reducing the number of times of climbing up and down by the workers, and the multiple bolt holes arranged on the outer walls of the upper vertical frame and the lower vertical frame can flexibly adjust the position of the horizontal frame, thereby the flexible adjustment can be performed according to the construction requirements. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1 It is a whole structure schematic view according to a preferred embodiment of the present application;

[0019] Figure 2 It is a whole structure side view according to a preferred embodiment of the present application;

[0020] Figure 3 It is a vertical support structure schematic view according to a preferred embodiment of the present application;

[0021] Figure 4 Fig. 1 is an exploded structural schematic view of a vertical support according to a preferred embodiment of the present application;

[0022] Figure 5 Fig. 2 is an exploded structural schematic view of a lock member according to a preferred embodiment of the present application;

[0023] Figure 6 Fig. 3 is a structural schematic view of a horizontal frame according to a preferred embodiment of the present application;

[0024] Figure 7 Fig. 4 is a structural schematic view of a fixed plate according to a preferred embodiment of the present application;

[0025] Figure 8 Fig. 5 is a structural schematic view of a fixed pulley according to a preferred embodiment of the present application.

[0026] In the figure: 1, lower vertical frame; 2, connection frame; 3, horizontal frame; 4, lock member; 5, protection rod; 6, hoisting member; 7, fixed plate; 8, climbing ladder; 9, upper vertical frame; 10, female buckle; 11, male buckle; 12, horizontal connection hole; 13, assembly hole; 14, vertical fixing hole; 15, adaptive hole; 16, fixed pulley. DETAILED DESCRIPTION

[0027] In order to make the technical scheme of the present application clearer and more explicit to those skilled in the art, the present application will be further described in detail below in conjunction with the embodiments and the accompanying drawings, but the implementation manner of the present application is not limited thereto.

[0028] As Figures 1-8As shown, the suspension steel truss structure construction platform provided by the embodiment comprises three groups of vertical support members, the vertical support member comprises two lower vertical frames 1 and an upper vertical frame 9 installed above the lower vertical frame 1, the upper and lower ends of the upper vertical frame 9 are provided with buckle plates, the upper vertical frame 9 can continue to be built above, the locking buckle member 4 is installed between the lower vertical frame 1 and the upper vertical frame 9, the upper vertical frame 9 and the lower vertical frame 1 are both provided with two horizontal frames 3 through fixing bolts, a plurality of bolt holes are formed in the outer walls of the upper vertical frame 9 and the lower vertical frame 1, the horizontal frame 3 located at the upper part of the upper vertical frame 9 is provided with a fixing plate 7, the upper end of the vertical support member located on the left side is provided with a hoisting member 6, the upper vertical frame 9 and the lower vertical frame 1 are assembled through the locking buckle member 4, then the horizontal frame 3 sleeved on the upper vertical frame 9 and the lower vertical frame 1 is fixed at a suitable position through the fixing bolt, then the horizontal frame 3 is fixed horizontally through the connecting frame 2, the climbing ladder is built, after completion, the fixing plate 7 is laid on the horizontal frame 3 of the uppermost layer and is fixed through a bolt, meanwhile, the hoisting member 6 is installed on the upper vertical frame 9 of one end of the fixing plate 7, and the protection rod 5 is installed through the adaptive holes at both ends of the horizontal frame 3, which can effectively protect the construction personnel, meanwhile, the hoisting member 6 can facilitate the lifting of part of the materials, which can avoid reducing the climbing times of the workers, meanwhile, the plurality of bolt holes formed in the outer walls of the upper vertical frame 9 and the lower vertical frame 1 can flexibly adjust the position of the horizontal frame 3, thereby the construction demand can be flexibly adjusted.

[0029] In the embodiment, as shown, Figures 3-8 the locking buckle member 4 comprises a female buckle 10 and a male buckle 11 installed below the female buckle 10, the upper and lower ends of the upper vertical frame 9 and the upper end of the lower vertical frame 1 are provided with the buckle plates adapted to the female buckle 10, the male buckle 11 is provided with a locking bolt penetrating the buckle plate, the upper vertical frame 9 and the lower vertical frame 1 are locked through the female buckle 10 and the male buckle 11, which is used for building a higher construction platform, the two ends of the horizontal frame 3 are provided with three adaptive holes 15, which are used for loading the protection rod, the protection net buckle and other components according to the demand, the upper end of the middle part of the horizontal frame 3 is provided with two vertical fixing holes 14, the horizontal frame 3 can be fixed on the arranged bolt holes of the upper vertical frame 9 and the lower vertical frame 1 through the bolt of the side wall of the horizontal frame 3, three assembly holes 13 are arranged between the two vertical fixing holes 14, the lateral connecting hole 12 is formed in the middle part of the side wall of the horizontal frame 3, which is used for cooperating with the connecting frame 2, the protection rod 5 is installed on the horizontal frame 3 located at the upper part of the upper vertical frame 9, the connecting frame 2 is arranged between the three groups of vertical support members, the hoisting member 6 comprises a support frame and a fixed pulley 16 installed on the upper part of the support frame, the fixed pulley 16 is provided with a sling, the climbing ladder 8 is installed on the vertical support member located on the right side, one end of the fixing plate 7 is provided with an avoiding hole, the other end of the fixing plate 7 is provided with a protrusion adapted to the avoiding hole, the existing wood board or bamboo board cannot be effectively fixed, and the construction personnel is not safe enough when stepping, the fixing plate 7 can be more effectively laid through the mutual clamping, which can prevent sliding.

[0030] To sum up, only for the further embodiment of the present application, but the protection scope of the present application is not limited to this, any skilled person in the art within the scope of the present application, according to the technical scheme and the conception of the present application, equivalent replacement or change, all belong to the protection scope of the present application.

Claims

1. A suspended steel truss construction platform comprising three groups of vertical supports, said vertical supports comprising two lower verticals (1) and an upper vertical (9) mounted above said lower verticals (1), characterised in that, Locking members (4) are mounted between the lower vertical frame (1) and the upper vertical frame (9), two horizontal frames (3) are mounted on the upper vertical frame (9) and the lower vertical frame (1) through fixing bolts, a plurality of bolt holes are formed in the outer walls of the upper vertical frame (9) and the lower vertical frame (1), a fixing plate (7) is mounted on the horizontal frame (3) at the upper portion of the upper vertical frame (9), and a hoisting member (6) is mounted on the upper ends of the vertical support members on the left side.

2. The suspended steel truss structure construction platform according to claim 1, wherein, The locking members (4) comprise female buckles (10) and sub-buckles (11) mounted below the female buckles (10).

3. The suspended steel truss structure construction platform according to claim 2, wherein, The upper and lower ends of the upper vertical frame (9) and the upper end of the lower vertical frame (1) are provided with buckle discs adapted to the female buckles (10), and locking bolts penetrating the buckle discs are arranged on the sub-buckles (11).

4. The suspended steel truss structure construction platform according to claim 3, wherein, Three adaptive holes (15) are formed at the two ends of the horizontal frame (3), two vertical fixing holes (14) are formed on the upper middle portion of the horizontal frame (3), three assembly holes (13) are arranged between the two vertical fixing holes (14), and a horizontal connection hole (12) is formed on the side wall of the middle portion of the horizontal frame (3).

5. The suspended steel truss structure construction platform according to claim 4, wherein, The horizontal frame (3) at the upper portion of the upper vertical frame (9) is provided with a protective rod (5).

6. The suspended steel truss structure construction platform according to claim 1, wherein, Three groups of vertical support members are provided with connection frames (2).

7. The suspended steel truss structure construction platform according to claim 1, wherein, The hoisting member (6) comprises a support frame and a fixed pulley (16) mounted on the upper portion of the support frame, and a sling is arranged on the fixed pulley (16).

8. The suspended steel truss structure construction platform according to claim 1, wherein, A climbing ladder (8) is mounted on the vertical support members on the right side.

9. The suspended steel truss structure construction platform according to claim 1, wherein, One end of the fixing plate (7) is provided with an avoiding opening.

10. The suspended steel truss structure construction platform according to claim 9, wherein, The other end of the fixing plate (7) is provided with a protruding block adapted to the avoiding opening.

Citation Information

Patent Citations

  • Large-span steel frame structure construction platform

    CN221219583U