Novel vertical double-hole stone box tomb structure
The new vertical double-chamber stone box tomb structure integrates the tombstone and the tomb chamber, combines the drainage hole at the bottom of the tomb chamber with the drainage structure of the tomb area, and uses mortise and tenon splicing technology to solve the problems of traditional tombs having large footprints and poor waterproofing, thus achieving land conservation and ecological improvement.
Patent Information
- Application Number
- CN202322672267.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-07
- Publication Date
- 2026-01-06
- Estimated Expiration
- 2033-10-07
AI Technical Summary
Existing burial plots have a large space occupancy rate and low green coverage. The public has low acceptance of conventional eco-friendly burial methods, and traditional burial waterproofing methods pose the risk of water accumulation and waste of resources.
The tomb adopts a new type of vertical double-chamber stone box tomb structure, with the tombstone and the tomb chamber integrated. The bottom of the tomb chamber is equipped with drainage holes and mortise and tenon splicing technology. The tomb chamber stone box is divided into upper and lower parts. The front side has an entrance for the bone box, and the rear side is sunken and grooved. Combined with the drainage structure of the tomb area, the space of the tombstone and the tomb chamber is overlapped and utilized.
To conserve land resources, increase green coverage, reduce the use of natural stone, solve the problem of water accumulation, lower the price of cemetery plots, and enhance ecological benefits and environmental awareness.
Smart Images

Figure CN223767260U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of burial products, and more particularly to the field of stone burial chambers, specifically referring to a novel vertical double-chamber stone burial chamber structure. Background Technology
[0002] Due to my country's large population and limited land resources, from a macro perspective, the continuous miniaturization of burial products and the conservation of precious land resources have become an inevitable trend in the development of cemeteries in my country. To address the problems of large space occupation, low green coverage, and low public acceptance of conventional eco-friendly burial methods in existing traditional tomb structures, this utility model provides a novel tomb structure that fully utilizes existing land space, thereby reducing the area occupied by the tomb and conserving land resources. In terms of ecological greening, the saved space is used to plant flowers, trees, and other vegetation, increasing the ecological function of the cemetery and reducing its environmental impact. This tomb structure not only makes it more acceptable to the public and saves land resources, thus reducing burial prices, but also protects the environment and improves ecological benefits. In the process of achieving burial space conservation, it can raise people's awareness of land conservation and environmental protection, encouraging more people to consciously choose land-saving burial methods, such as... Figure 1 and Figure 2 As shown. Utility Model Content
[0003] The purpose of this utility model is to overcome the shortcomings of the prior art and provide a new type of vertical double-chamber stone box tomb structure that is simple in structure, saves land, and has a wide range of applications.
[0004] To achieve the above objectives, the novel vertical double-chamber stone coffin tomb structure of this utility model is as follows:
[0005] The main features of this novel vertical double-chamber stone box tomb structure are that the structure includes a burial chamber, a burial base, and a tombstone. The burial chamber is buried deep underground, the tombstone is installed on the burial base, the tombstone and the burial base are installed on the stone box of the burial chamber, and the top of the burial chamber is fixed.
[0006] The burial chamber includes two stone burial chambers, namely an upper stone burial chamber and a lower stone burial chamber. The upper stone burial chamber is placed above the lower stone burial chamber, and the volume of the upper stone burial chamber is smaller than that of the lower stone burial chamber. The lower stone burial chamber is divided into two parallel vertical burial sites, and the upper stone burial chamber has a channel for storing bones.
[0007] Preferably, the burial stone box has an entrance for the bone box on the front side and a sunken groove on the rear side to integrate with the foundation of the main monument.
[0008] Preferably, the tomb chamber is assembled from standard-sized granite slabs using mortise and tenon joints to form a tomb stone box.
[0009] Preferably, the burial chamber is connected to the underground drainage structure, the bottom plate of the burial chamber stone box is perforated and a drainage outlet is provided at the bottom, and the burial chamber is connected to the underground drainage structure through the drainage outlet.
[0010] This utility model adopts a novel vertical double-chamber stone box tomb structure. Starting from changing the way the tombstone is installed, it separates the traditional tombstone from the tomb chamber, and integrates the tombstone and the tomb chamber. It cleverly transforms the tomb chamber structure and makes use of the overlapping space between the tombstone and the tomb chamber, thereby achieving the goal of further saving land. Attached Figure Description
[0011] Figure 1 This is a schematic diagram of an existing vertical double-cavity stone box structure.
[0012] Figure 2 This is a schematic diagram of a traditional tomb structure.
[0013] Figure 3 This is a schematic diagram showing the closed state and component disassembly state of the novel vertical double-cavity stone box tomb structure of this utility model.
[0014] Figure 4 This is a schematic diagram of the construction of the novel vertical double-chamber stone box tomb structure of this utility model.
[0015] Figure 5 This is an exploded view of the novel vertical double-cavity stone box tomb structure of this utility model.
[0016] Figure label:
[0017] 1. Tombstone
[0018] 2. Tomb base
[0019] 3. Tomb
[0020] 11. Base Plate
[0021] 12 low board
[0022] 13 front and rear low plates
[0023] 14 high board
[0024] 15 vertical partitions
[0025] 16 transverse main partitions
[0026] 17 Horizontal secondary partitions
[0027] 18 front and rear high plates
[0028] 19 upper inner high board Detailed Implementation
[0029] To more clearly describe the technical content of this utility model, the following description is provided in conjunction with specific embodiments.
[0030] This utility model discloses a novel vertical double-chamber stone box tomb structure, which includes a tomb chamber, a tomb base, and a tombstone. The tomb chamber is buried deep underground, the tombstone is installed on the tomb base, the tombstone and the tomb base are installed on the stone box of the tomb chamber, and the top of the tomb chamber is fixed.
[0031] The burial chamber includes two stone burial chambers, namely an upper stone burial chamber and a lower stone burial chamber. The upper stone burial chamber is placed above the lower stone burial chamber, and the volume of the upper stone burial chamber is smaller than that of the lower stone burial chamber. The lower stone burial chamber is divided into two parallel vertical burial sites, and the upper stone burial chamber has a channel for storing bones.
[0032] In a preferred embodiment of this utility model, the tomb stone box has an entrance for the bone box on the front side and a sunken groove treatment on the rear side to combine with the foundation of the main monument.
[0033] In a preferred embodiment of this utility model, the tomb is constructed by mortise and tenon jointing of standard granite slabs to form a tomb stone box.
[0034] In a preferred embodiment of this utility model, the tomb is connected to the underground drainage structure, the bottom plate of the tomb stone box is perforated and a drainage outlet is provided at the bottom, and the tomb is connected to the underground drainage structure through the drainage outlet.
[0035] For a detailed description of the embodiments of this utility model, please refer to [link / reference]. Figure 3 As shown, the tombstone box structure of this utility model, in a specific embodiment, starts by changing the installation method of the tombstone, separating the traditional tombstone from the tomb, and integrating the tombstone and tomb into one, cleverly transforming the tomb structure and utilizing the overlapping space between the tombstone and the tomb, thereby achieving the goal of further saving land. Structural comparison: Figure 2 and Figure 4 As shown. The upper stone box serves as the passage for the ossuary, while the lower stone box divides into two vertical burial sites. This ingenious design maximizes the use of above-ground space without compromising the burial function.
[0036] Figure 2 and Figure 4 In the diagram, a represents the length of the tomb, b represents the width of the tomb, and h represents the depth of the tomb.
[0037] Traditional tombstone-style burial chambers are waterproofed using a sealed method, typically employing a semi-buried, integral stone casket with a tongue-and-groove joint at the top to prevent rainwater from entering. While this method is simple and easy to implement, in practice, some tombs may unexpectedly flood due to extreme weather conditions. The temperature difference between the inside and outside of the stone casket causes condensation inside, and because the tomb is a sealed structure, any water that gets in cannot drain, leading to corrosion of the urn containing the ashes.
[0038] This new type of tombstone product changes the traditional approach. The waterproofing of the tomb's stone casket utilizes drainage instead of traditional methods, with drainage holes at the bottom of the tomb, integrating with the sponge city-style civil engineering foundation structure of the cemetery area. This completely eliminates the risk of water accumulation in the tomb. Figure 4 As shown.
[0039] This utility model uses mortise and tenon splicing technology to assemble a set of stone boxes using standardized granite slabs, which reduces the waste of natural stone and land resources. The amount of natural stone used is reduced by 67.1%. The mortise and tenon splicing and cement mortar grouting method make the stone box structure more solid and durable.
[0040] This utility model starts with the structural design of the tomb stone box. The entrance to the ossuary is changed from a single entrance to two entrances located on the front side of the stone box. The rear side is treated with a sunken groove and combined with the foundation of the main monument, thereby increasing the greening rate by 32%.
[0041] For the specific implementation scheme of this embodiment, please refer to the relevant descriptions in the above embodiments, which will not be repeated here.
[0042] It is understood that the same or similar parts in the above embodiments can be referred to each other, and the contents not described in detail in some embodiments can be referred to the same or similar contents in other embodiments.
[0043] It should be noted that in the description of this utility model, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Furthermore, in the description of this utility model, unless otherwise stated, "a plurality of" means at least two.
[0044] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0045] This utility model adopts a novel vertical double-chamber stone box tomb structure. Starting from changing the way the tombstone is installed, it separates the traditional tombstone from the tomb chamber, and integrates the tombstone and the tomb chamber. It cleverly transforms the tomb chamber structure and makes use of the overlapping space between the tombstone and the tomb chamber, thereby achieving the goal of further saving land.
[0046] In this specification, the present invention has been described with reference to specific embodiments thereof. However, it will be apparent that various modifications and variations can be made without departing from the spirit and scope of the present invention. Therefore, the specification and drawings should be considered illustrative rather than restrictive.
Claims
1. A new vertical double-hole stone box tomb structure, characterized in that, The structure comprises a tomb, a tomb base and a tombstone, the tomb is deeply buried underground, the tombstone is installed on the tomb base, the tombstone and the tomb base are installed on a stone box of the tomb, and the top of the tomb is fixed; The tomb comprises an upper stone box and a lower stone box, the stone boxes are assembled through mortise and tenon joint, the upper stone box is placed above the lower stone box, the upper stone box and the lower stone box are separated by a horizontal main partition plate and a horizontal auxiliary partition plate, the upper stone box and the lower stone box are equal in width, the length of the upper stone box is shorter than the length of the lower stone box, the lower stone box is divided into two vertical cavities in parallel by a vertical partition plate, and the upper stone box is provided with a bone box channel; The tomb is connected with underground drainage structure of the cemetery, the bottom plate of the lower stone box is provided with a drainage hole in communication with the bottom of the lower stone box, and the tomb is connected with the underground drainage structure of the cemetery through the drainage hole; The stone box of the tomb is provided with a bone box entrance at the front side and a sinking groove at the rear side, and is combined with the main tombstone base.
2. The vertical dual-cavity stone box tomb structure according to claim 1, characterized in that, The tomb adopts standard granite plates to be assembled into the stone box through mortise and tenon joint.