Simple detachable highway hectometer stake

The simple, detachable 100-meter highway bollard design, with its magnetic connection and slot structure, solves the problems of complex installation and difficult maintenance, enabling convenient installation and efficient maintenance, reducing vehicle collision damage, lowering maintenance costs, and improving stability.

CN223780735UActive Publication Date: 2026-01-09JINTA HIGHWAY SECTION JIUQUAN HIGHWAY DEV CENT GANSU PROVINCE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422892166.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2026-01-09
Estimated Expiration
2034-11-26

AI Technical Summary

Technical Problem

The existing 100-meter markers are complex to install, difficult to maintain, and easily damaged by large vehicles, making subsequent cleaning and repair work time-consuming and labor-intensive.

Method used

The simple, detachable 100-meter highway bollard design features a magnetic connection and slot structure. The base is equipped with a magnet and a boss, and the bollard is connected to the base via magnetic attraction and slots. The signboard is removable and replaceable, and the fixing bolts ensure stable installation.

Benefits of technology

It achieves convenient installation, simple and efficient maintenance, reduces vehicle collision damage, lowers maintenance costs, and improves stability in harsh weather conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223780735U_ABST
    Figure CN223780735U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hectometer stakes, in particular to a simple detachable road hectometer stake which comprises a base and a hectometer stake body, a magnet block is fixedly connected to the interior of the base, the lower end of the hectometer stake body is connected to the top of the base in a magnetic attraction mode, and signboards are connected to the four faces of the upper portion of the hectometer stake body. The base is in threaded connection with a plurality of fixing bolts. The fixing bolts are arranged on the base, the base can be fixedly connected to the ground conveniently, the magnet blocks are arranged on the base, the hectometer stake and the base are connected in a magnetic attraction mode, the structure is simple, and the installation efficiency is high; when a vehicle collides with the hundred-meter stake in an accident, the hundred-meter stake can automatically fall off, damage to the vehicle can be reduced, the hundred-meter stake can be protected from being damaged, maintenance personnel can pick up the hundred-meter stake and then reinstall the hundred-meter stake on the base, and maintenance is easy and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of hundred-meter stake, specifically to a simple detachable highway hundred-meter stake. BACKGROUND

[0002] Highway refers to the public road between cities, between urban and rural areas, and between rural areas that can drive cars and is checked and recognized by the traffic and transportation department. In order to provide accurate distance information, assist navigation and positioning, ensure traffic safety, facilitate road management and maintenance, and promote road construction standardization, a hundred-meter stake is usually set. The hundred-meter stake is a sign post set every hundred meters, which is used to identify the hundred-meter distance of the highway. It is usually set between each milestone on the right side of the highway, and one is set every 100 meters between two adjacent kilometer markers, which can help drivers and pedestrians accurately understand their position and distance, and provide an important reference and basis for road construction and management. The existing hundred-meter stake is usually a square column structure made of concrete, and the upper part is marked with numbers. Its installation process is relatively complex, and the installation efficiency is low. At the same time, with the continuous growth of highway traffic, the highway hundred-meter stake is damaged by large vehicles at any time. When the hundred-meter stake is damaged by large vehicles, the subsequent cleaning and repair work is particularly complex and time-consuming. Therefore, it is necessary to develop a simple detachable highway hundred-meter stake with simple structure, convenient installation, and simple and efficient post-maintenance. SUMMARY

[0003] In view of the above technical problems, the utility model provides a simple detachable highway hundred-meter stake with simple structure, convenient installation, and simple and efficient post-maintenance, to solve the problems of complex installation process and difficult post-maintenance of the existing hundred-meter stake.

[0004] To solve the above technical problems, the utility model discloses a simple detachable highway hundred-meter stake, which comprises a base and a hundred-meter stake. The base is internally fixedly connected with a magnet block. The lower end of the hundred-meter stake is magnetically connected to the top of the base. The upper part of the hundred-meter stake is connected with a signboard on four sides. A plurality of fixed bolts are threadedly connected to the base.

[0005] Further, the base is fixedly connected with a boss, and the lower end of the hundred-meter stake is provided with a clamping groove matched with the boss, which is clamped on the boss.

[0006] Further, the magnet block is fixedly connected in the boss.

[0007] Further, the hundred-meter stake is fixedly connected with a connecting plate through a connecting bolt, and the bottom of the connecting plate is in contact with the upper surface of the boss.

[0008] Further, the upper part of the hundred-meter stake is provided with a marking groove on four sides, and the signboard is connected in the marking groove through a bolt.

[0009] Further, the base bottom wall is bolted with a maintenance door.

[0010] Further, the number of the fixing bolts is four and they are evenly distributed on the four corners of the base.

[0011] Further, the distance from the lower surface of the connecting plate to the bottom of the hundred-meter stake is matched with the height of the boss, and the height of the boss is 1-2 cm.

[0012] The utility model has the following advantages compared with prior art:

[0013] The utility model discloses a simple and convenient detachable highway hundred-meter stake, which comprises a base and a hundred-meter stake, the base is internally fixedly connected with a magnet block, the lower end of the hundred-meter stake is connected to the top of the base in a magnetic attraction mode, the upper portion of the hundred-meter stake is connected with a signboard, the signboard is marked with corresponding numbers, and the base is threadedly connected with a plurality of fixing bolts. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 It is a three-dimensional structure diagram of the utility model.

[0015] Figure 2 It is a disassembled three-dimensional view of the utility model.

[0016] Figure 3 It is a sectional view of the utility model.

[0017] In the drawing: 1, base, 2, fixing bolt, 3, hundred-meter stake, 4, boss, 5, magnet block, 6, connecting plate, 7, connecting bolt, 8, mark slot. DETAILED DESCRIPTION

[0018] The utility model will be further described below in combination with the drawings.

[0019] As Figure 1 , 2 , 3 shows a simple and convenient detachable highway hundred-meter stake, which comprises a base 1 and a hundred-meter stake 3, the base 1 is internally fixedly connected with a magnet block 5, the lower end of the hundred-meter stake 3 is connected to the top of the base 1 in a magnetic attraction mode, the upper portion of the hundred-meter stake 3 is connected with a signboard, the signboard is marked with corresponding numbers, and the base 1 is threadedly connected with a plurality of fixing bolts 2. It should be noted that in the embodiment, the base 1 can also be connected with a steel nail, and the base 1 is fixedly connected with the ground by using the steel nail.

[0020] In order to improve the stability of the hundred-meter pile 3, ensure that it is not blown away in bad weather such as strong wind, the base 1 is fixedly connected with the boss 4, the lower end of the hundred-meter pile 3 is provided with the clamping groove matched with the boss 4, and the clamping groove is clamped on the boss 4. It should be noted that in the embodiment, the lower end of the boss 4 is in communication with the base 1.

[0021] In order to improve the connection stability, the magnet block 5 is fixedly connected in the boss 4 and the base 1, and the lower part in the base 1 is connected with the fixed plate through the bolt, and the lower surface of the magnet block 5 can be pressed against the fixed plate, so that the magnet block 5 can be fixedly installed.

[0022] In order to facilitate the connection of the hundred-meter pile 3, the connecting plate 6 is fixedly connected in the hundred-meter pile 3 through the connecting bolt 7, and the bottom of the connecting plate 6 is in contact with the upper surface of the boss 4. It should be noted that in the embodiment, in order to ensure the appearance, recesses are arranged on both sides of the hundred-meter pile 3, and the end of the connecting bolt 7 is located in the recess after connection.

[0023] In order to facilitate the use of the signboard when the hundred-meter pile 3 is damaged, the marking groove 8 is arranged on the upper part of the hundred-meter pile 3, and the signboard is connected in the marking groove 8 through the bolt. It should be noted that the thickness of the marking groove 8 is matched with the thickness of the signboard, and the thickness of the marking groove 8 is less than 0.5 cm.

[0024] In order to facilitate the maintenance and repair of the magnet block 5, the maintenance door is connected to the bottom wall of the base 1 through the bolt.

[0025] In order to ensure that the base 1 can be stably installed on the ground, the number of fixed bolts 2 is four and is uniformly distributed on the four corners of the base 1. It should be noted that in the embodiment, in order to avoid that the upper end of the fixed bolt 2 causes excessive damage to the vehicle in case of accident, the recess is arranged on the base 1, and the upper end of the fixed bolt 2 is located in the recess after being connected to the ground.

[0026] In order to ensure the connection stability, the distance from the lower surface of the connecting plate 6 to the bottom of the hundred-meter pile 3 is matched with the height of the boss 4, and the height of the boss 4 is 1-2 cm. It should be noted that in the embodiment, the height of the boss 4 is 1.5 cm.

[0027] It should be noted that in the embodiment, the magnet block 5 adopts a high-performance rare earth permanent magnet with strong adsorption force; the base 1, the hundred-meter pile 3, the boss 4 and the connecting plate 6 all adopt metal materials with good magnetic attraction.

[0028] The working process of the embodiment is as follows:

[0029] First open the maintenance door of the base 1 bottom magnet block 5 is installed in the boss 4 and the base 1, then use the fixing bolt 2 is installed in the corresponding position in the base 1, in the mark slot 8 with bolt installation corresponding sign, then the end of the stake 3 corresponding to the card slot alignment boss 4 plug, at this time in the magnet block 5 will be connected to the plate 6 under the action of the suction. When the vehicle collision and other accidents, the stake 3 automatically falls, not only can reduce the vehicle on the stake 3 damage, but also can ensure the integrity of the stake 3, maintenance personnel only need to pick up after the reinstallation on the base 1 can be. If the stake 3 is damaged seriously, can be removed sign installed in the new stake 3 mark slot 8 continue to use.

Claims

1. A simple, detachable 100-meter highway bollard, characterized in that: Includes a base (1) and a 100-meter stake (3). A magnet (5) is fixedly connected inside the base (1). The lower end of the 100-meter stake (3) is magnetically connected to the top of the base (1). A boss (4) is fixedly connected to the base (1). A slot matching the boss (4) is opened at the lower end of the 100-meter stake (3). The slot is locked onto the boss (4). A sign is connected to the four sides of the upper part of the 100-meter stake (3). Several fixing bolts (2) are threadedly connected to the base (1).

2. The simplified detachable highway 100-meter marker according to claim 1, characterized in that: The magnet block (5) is fixedly connected to the boss (4).

3. The simplified detachable highway 100-meter marker according to claim 2, characterized in that: The 100-meter pile (3) is fixedly connected to a connecting plate (6) by connecting bolts (7), and the bottom of the connecting plate (6) is in contact with the upper surface of the boss (4).

4. The simplified detachable highway 100-meter marker according to claim 1, characterized in that: The 100-meter stake (3) has marking grooves (8) on all four sides of its upper part, and the marking grooves (8) are connected to the sign by bolts.

5. The simplified detachable highway 100-meter marker according to claim 1, characterized in that: The base (1) has a maintenance door connected to its bottom wall by bolts.

6. The simplified detachable highway 100-meter marker according to claim 1, characterized in that: The number of fixing bolts (2) is four and they are evenly distributed on the four corners of the base (1).

7. The simplified detachable highway 100-meter marker according to claim 3, characterized in that: The distance from the lower surface of the connecting plate (6) to the bottom of the 100-meter pile (3) is matched with the height of the boss (4), and the height of the boss (4) is 1-2 centimeters.