Foundation pit recharge water treatment device for civil construction of rail transit
By using structures such as round boxes, covers, and round seats in the civil construction of rail transit, and combining them with PLC controllers to realize the automatic alternation of filter plates and the timed cleaning of solid impurities, the problem of solid impurity accumulation and blockage in the foundation pit recharge water treatment device is solved, and the degree of automation and work efficiency are improved.
Patent Information
- Application Number
- CN202520378211.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-06
- Publication Date
- 2026-02-06
- Estimated Expiration
- 2035-03-06
AI Technical Summary
Existing water treatment devices for foundation pit recharge in rail transit civil construction suffer from solid impurity accumulation and filter plate clogging, resulting in unsatisfactory automation and convenience, and affecting recharge efficiency.
It adopts a round box, cover plate, round seat, water passage hole, filter plate, slag cleaning and unblocking component and vibration guide component. The PLC controller realizes the automatic alternation of filter plate and the timed cleaning of solid impurities to avoid clogging.
It has improved the automation and convenience of the reinjection water treatment process, prevented solid impurities from entering the reinjection well, improved work efficiency, and reduced manual intervention.
Smart Images

Figure CN223874625U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of rail transit civil construction, specifically to a foundation pit recharge water treatment device for rail transit civil construction. BACKGROUND
[0002] Rail transit civil construction is a kind of building construction, and the foundation pit excavated in the process of rail transit civil construction often enters recharge water to affect the progress of construction. Since the foundation pit is dewatered, the groundwater level around the foundation pit inevitably decreases, thereby causing the original buildings and underground structures around the foundation pit to be damaged to different degrees due to uneven settlement. In order to reduce the above influences or damages, recharge measures should be taken between the foundation pit and the buildings to be protected. According to the stratum characteristics of the foundation pit, the recharge measures use a recharge well outside the pit. Water in the foundation pit is pumped into the recharge well by a water pump to perform recharge operation. In recharge operation, the existing recharge water treatment device usually uses a filtration treatment method to filter and intercept solid impurities to avoid a large amount of solid impurities from entering the recharge well to cause blockage.
[0003] To this end, the building foundation pit recharge water treatment device disclosed in the publication No. CN214695679U includes a box body, walking wheels are arranged at the four corners of the lower surface of the box body, a water inlet pipe is arranged on the left side of the upper surface of the box body, a filter box is arranged on the inner wall of the box body, the water inlet pipe penetrates the upper surface of the filter box, a rotating structure is arranged on the inner wall of the box body and located below the lower surface of the filter box, an extension structure is arranged on the right side of the inner wall of the box body and located behind the rotating structure, a filter plate is arranged on the inner wall of the box body and located below the rotating structure, a material guide structure is arranged below the filter plate, a water collecting tank is arranged at the bottom of the material guide structure, and a water outlet pipe is arranged below the right side of the box body. The device solves the problem that the existing recharge water treatment device usually uses a water pump and a water pipe to extract recharge water, the extracted recharge water is directly discharged to pollute the environment, has no filtration effect, and the recharge well is easily blocked by accumulated sundries, thereby affecting the recharge efficiency.
[0004] The building foundation pit recharge water treatment device disclosed in the above technology sets the box body and the filter plate, and uses the filter plate to filter and intercept solid impurities in recharge water during recharge and drainage work, which effectively prevents a large amount of solid impurities from entering the recharge well to cause blockage. However, this method has the following disadvantages when used.
[0005] 1. The accumulated solid impurities of the filtering interception are in the box body, and personnel need to clean and remove them separately after shutdown, lacking the structure of automatic deslagging during the backwater operation, and the use of automation degree and convenience is not ideal; 2. With the filtration, the filter plate is inevitably blocked, and personnel need to clean and dredge separately, and the filter plate cannot be cleaned and dredged automatically without affecting the backwater operation, and the work efficiency is low. In view of this, the application provides a foundation pit backwater treatment device for rail transit civil construction to solve the above problems. Practical new type content
[0006] The utility model discloses a kind of foundation pit backwater treatment devices for rail transit civil construction, to solve the problems proposed in the above background technology.
[0007] To achieve the above object, the utility model provides the following technical scheme: a kind of foundation pit backwater treatment device for rail transit civil construction, including L-shaped support plate, the bottom four corners of the L-shaped support plate are rotatably installed with universal wheel with lock, the right side inner wall and bottom inner wall of the L-shaped support plate are fixedly connected with the same circular box with open top, the top of circular box is fixedly connected with cover plate, and PLC controller is fixedly installed on the right side top of L-shaped support plate;
[0008] The circular box is movably sleeved with circular seat, two water holes are formed in the top of circular seat, filter plate is fixedly installed in water hole, the bottom left side of circular box is fixedly connected with first hose for pumping water in rail transit civil foundation pit and communicated with the left side water hole, backwater discharge and delivery assembly for drainage is fixedly installed on the top of cover plate and communicated with the left side water hole, servo brake motor with output shaft and circular seat bottom center fixed connection is fixedly installed on the bottom of circular box, and servo brake motor is electrically connected with PLC controller. Servo brake motor is arranged to drive circular seat to rotate half a circle each time under the control of PLC controller, two water holes and two filter plates are rotated and exchanged positions by circular seat, backwater discharge and delivery assembly is used to extract water in rail transit civil foundation pit through the left side water hole and first hose, and discharge to the backwater well arranged outside, and filter plate is used to filter and intercept solid impurities in passing water.
[0009] The top right side of the cover plate is embedded with a slag cleaning and dredging assembly communicated with the water through hole on the right side, and the slag cleaning and dredging assembly is electrically connected with the PLC controller.
[0010] Preferably, the recharge water delivery assembly comprises a water pump fixedly installed on the top left side of the cover plate, the cover plate is fixedly sleeved on the water inlet of the water pump, the water inlet of the water pump is vertically aligned and communicated with the water through hole on the left side, and the water outlet of the water pump is communicated and fixed with a discharge hose.
[0011] Preferably, the slag cleaning and dredging assembly comprises a fixed box embedded and fixed on the top right side of the cover plate, a plurality of blowing pipe heads are communicated and fixed on the bottom of the fixed box and located above and communicated with the water through hole on the right side, a gas pump is fixedly installed on the top right side of the cover plate, the gas outlet of the gas pump is communicated and fixed with the top of the fixed box, and the gas pump is electrically connected with the PLC controller.
[0012] Preferably, the vibration guide assembly comprises a U-shaped guide plate arranged below the slag discharge pipe and inclinedly arranged, the U-shaped guide plate is inclinedly arranged downward and forward, six vertical guide rods are fixedly connected to the bottom of the U-shaped guide plate in a rectangular shape, an L-shaped support plate is slidably sleeved on the six vertical guide rods, six springs are fixedly connected between the bottom of the U-shaped guide plate and the inner wall of the bottom of the L-shaped support plate, the springs are movably sleeved on the corresponding vertical guide rods, and a vibration motor electrically connected with the PLC controller is fixedly connected to the bottom of the U-shaped guide plate.
[0013] Preferably, the right side of the L-shaped support plate is fixedly installed with a storage battery, the PLC controller, the water pump, the vibration motor, the gas pump and the servo brake motor are electrically connected with the storage battery, and the right top of the L-shaped support plate is fixedly connected with a U-shaped handle.
[0014] Preferably, two first support rods are fixedly connected between the inner wall of the bottom of the L-shaped support plate and the bottom of the circular box, and a connecting seat is fixedly connected between the right side of the circular box and the inner wall of the right side of the L-shaped support plate.
[0015] Preferably, sealing rubber pads are fixedly bonded to the top and bottom of the circular seat, the bottom inner wall of the circular box and the bottom of the cover plate are movably contacted with the corresponding sealing rubber pads, and two communication holes respectively communicated with the corresponding water through holes are formed in the top of the sealing rubber pads.
[0016] Preferably, the PLC controller is a numerical control programming controller with timing function, which can conveniently control the servo brake motor, vibration motor and air pump to be opened and closed according to the cleaning requirement.
[0017] Compared with the prior art, the utility model has the beneficial effects that:
[0018] 1、 through cooperation of the circular box, the cover plate, the circular seat, the water passage, the filter plate, the first hose and the recharge water delivery assembly, water in the rail transit civil foundation pit can be pumped to the recharge well for recharge operation, and solid impurities in the water can be filtered and intercepted during recharge to prevent a large amount of solid impurities from entering the recharge well and causing internal blockage.
[0019] 2、 through cooperation of the circular seat, the water passage, the filter plate, the circular box, the residue removal and dredging assembly, the residue removal pipe, the PLC controller, the servo brake motor and the vibration guide assembly, the two water passages and the two filter plates can be automatically rotated and alternately used and cleaned and dredged at regular intervals, the solid impurities can be effectively removed without stopping the machine at regular intervals, the filter plate can be cleaned and dredged without stopping the machine at regular intervals, the normal recharge water filtering treatment operation is not affected, the degree of automation, convenience and work efficiency are improved, and manual residue removal and dredging work is facilitated.
[0020] The utility model discloses a series of structures are set up, water in the rail transit civil foundation pit can be pumped to the recharge well for recharge operation, and solid impurities in the water can be filtered and intercepted during recharge to prevent a large amount of solid impurities from entering the recharge well and causing internal blockage, the solid impurities can be effectively removed without stopping the machine at regular intervals, the filter plate can be cleaned and dredged without stopping the machine at regular intervals, the normal recharge water filtering treatment operation is not affected, the degree of automation, convenience and work efficiency are improved, and manual residue removal and dredging work is facilitated. BRIEF DESCRIPTION OF DRAWINGS
[0021] Figure 1 It is a structural schematic view of a foundation recharge water treatment device for rail transit civil construction provided by the utility model;
[0022] Figure 2 It is a right view structural schematic view of the utility model; Figure 1
[0023] Figure 3 It is a main view sectional view structural schematic view of a foundation recharge water treatment device for rail transit civil construction provided by the utility model;
[0024] Figure 4 It is an A part enlarged structural schematic view in the utility model; Figure 3
[0025] In the diagram: 1. L-shaped support plate; 2. Round box; 201. Cover plate; 203. First flexible hose; 204. Slag discharge pipe; 3. Round seat; 301. Water passage hole; 302. Filter plate; 4. PLC controller; 5. Water pump; 6. Air pump; 601. Fixing box; 602. Cleaning pipe head; 7. U-shaped guide plate; 701. Vertical guide rod; 702. Spring; 703. Vibration motor; 8. Servo brake motor. Detailed Implementation
[0026] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0027] like Figures 1 to 4 As shown in the figure, the present embodiment proposes a foundation pit recharge water treatment device for rail transit civil construction, including an L-shaped support plate 1. The four corners of the bottom of the L-shaped support plate 1 are rotatably equipped with lockable casters. The same round box 2 with an open top is fixedly connected between the right inner wall and the bottom inner wall of the L-shaped support plate 1. Two first support rods are fixedly connected between the bottom inner wall of the L-shaped support plate 1 and the bottom of the round box 2. A connecting seat is fixedly connected between the right side of the round box 2 and the right inner wall of the L-shaped support plate 1, which serves to fix and support the round box 2. A cover plate 201 is fixedly connected to the top of the round box 2. A PLC controller 4 is fixedly installed on the top right side of the L-shaped support plate 1.
[0028] The circular box 2 is movably sleeved with a circular seat 3, the top of the circular seat 3 is provided with two water passing holes 301, the water passing holes 301 are fixedly installed with filter plates 302, the top and bottom of the circular seat 3 are fixedly bonded with sealing rubber pads, the bottom inner wall of the circular box 2 and the bottom of the cover plate 201 are movably contacted with the corresponding sealing rubber pads, the top of the sealing rubber pad is provided with two communication holes which are communicated with the corresponding water passing holes 301, the bottom left side of the circular box 2 is fixedly communicated with a first hose 203 which is communicated with the left water passing hole 301 and is used for pumping water in the rail transit civil foundation pit, the top of the cover plate 201 is fixedly installed with a recharge water discharging and sending assembly which is communicated with the left water passing hole 301 and is used for drainage, the bottom of the circular box 2 is fixedly installed with a servo brake motor 8 whose output shaft is fixedly connected with the bottom center of the circular seat 3, and the servo brake motor 8 is electrically connected with the PLC controller 4; the servo brake motor 8 is arranged to drive the circular seat 3 to automatically rotate half a circle each time under the control of the PLC controller 4, the circular seat 3 is used to drive the two water passing holes 301 and the two filter plates 302 to rotate and exchange positions for alternating use, the recharge water discharging and sending assembly is used to pump water in the rail transit civil foundation pit through the left water passing hole 301 and the first hose 203 and discharge the water to the recharge well arranged outside, and the filter plate 302 is arranged to filter and intercept solid impurities in the passing water.
[0029] The right side of the top of the cover plate 201 is embedded with a slag cleaning and dredging assembly which is communicated with the right water passing hole 301, the slag cleaning and dredging assembly is electrically connected with the PLC controller 4, the right side of the bottom of the circular box 2 is fixedly communicated with a slag discharging pipe 204 which is communicated with the right water passing hole 301, and a vibration guide assembly which is electrically connected with the PLC controller 4 is arranged below the slag discharging pipe 204 and is installed on the L-shaped supporting plate 1; the slag cleaning and dredging assembly is used to automatically blow and clean and dredge the filter plate 302 rotated to the right side and blow and discharge the solid slag in the water passing hole 301 rotated to the right side integrally and automatically under the control of the PLC controller 4 when alternating use, and the vibration guide assembly is used to vibrate and guide the discharged solid slag to the outside.
[0030] Specifically, the recharge water discharging and sending assembly comprises a water pump 5 fixedly installed on the left side of the top of the cover plate 201, the cover plate 201 is fixedly sleeved on the water inlet of the water pump 5, the water inlet of the water pump 5 is vertically aligned and communicated with the left water passing hole 301, and the water outlet of the water pump 5 is fixedly communicated with a discharging hose; the water pump 5 and the discharging hose are arranged in cooperation, one end of the first hose 203 is arranged in the rail transit civil foundation pit, one end of the discharging hose is arranged in the recharge well arranged outside, the water pump 5 is used to pump water in the left water passing hole 301, the left water passing hole 301 is used to pump water in the rail transit civil foundation pit through the first hose 203, and the water is discharged to the recharge well arranged outside through the discharging hose.
[0031] Further, the slag removal and dredging assembly includes a fixed box 601 embedded and fixed on the top right side of the cover plate 201, wherein the top right side of the cover plate 201 is provided with an embedded hole fixedly connected with the outside of the fixed box 601, a plurality of blowing pipe heads 602 are fixedly connected with the bottom of the fixed box 601, the blowing pipe heads 602 are located above and communicated with the water passage holes 301 on the right side, a gas pump 6 is fixedly installed on the top right side of the cover plate 201, the gas outlet of the gas pump 6 is fixedly communicated with the top of the fixed box 601, and the gas pump 6 is electrically connected with the PLC controller 4; the fixed box 601, the blowing pipe heads 602 and the gas pump 6 are cooperated, air is supplied into the fixed box 601 by the gas pump 6, the gas is blown out downward through the plurality of blowing pipe heads 602, the filter plate 302 on the right side is back-flushed and dredged, and the internal solid slag of the water passage hole 301 on the right side is blown out downward through the slag discharge pipe 204, the two water passage holes 301 and the two filter plates 302 are rotatably adjusted and exchanged in position to be alternately used, the alternate filtering, slag removal and dredging work is conveniently carried out without stopping, the continuous treatment of the recharge water is ensured, the work efficiency and the cleaning automation degree are improved, the manual-free, convenient and automatic cleaning and dredging work is facilitated.
[0032] Further, the vibration guide and discharge assembly includes a U-shaped guide plate 7 arranged below the slag discharge pipe 204 and arranged obliquely, the U-shaped guide plate 7 is arranged obliquely downward, six vertical guide rods 701 are fixedly connected with the bottom of the U-shaped guide plate 7 in a rectangular shape, the L-shaped support plate 1 is slidingly sleeved on the six vertical guide rods 701, six vertical guide holes are formed in the inner wall of the bottom of the L-shaped support plate 1 and respectively slidingly sleeved with the outer sides of the corresponding vertical guide rods 701, which plays a vertical sliding guide effect on the vertical guide rods 701, six springs 702 are fixedly connected between the bottom of the U-shaped guide plate 7 and the inner wall of the bottom of the L-shaped support plate 1, the springs 702 are movably sleeved on the corresponding vertical guide rods 701, a vibration motor 703 electrically connected with the PLC controller 4 is fixedly connected with the bottom of the U-shaped guide plate 7, the PLC controller 4 is a numerical control programming controller with timing function, which plays a convenient timing start and stop effect on the servo brake motor 8, the vibration motor 703 and the gas pump 6 according to the on-site cleaning requirements, a storage battery is fixedly installed on the right side of the L-shaped support plate 1, the PLC controller 4, the water pump 5, the vibration motor 703, the gas pump 6 and the servo brake motor 8 are electrically connected with the storage battery, and a U-shaped handle is fixedly connected with the top right side of the L-shaped support plate 1; the U-shaped guide plate 7, the vertical guide rods 701, the springs 702 and the vibration motor 703 are cooperated, the U-shaped guide plate 7 is vibrated by the vibration motor 703, the vertical guide rods 701 are moved downward and upward when the U-shaped guide plate 7 is vertically vibrated and the springs 702 are compressed and released, the elasticity of the springs 702 provides the vertical vibration condition for the U-shaped guide plate 7, when the solid impurities are discharged through the slag discharge pipe 204, they fall into the U-shaped guide plate 7 and are vibrated and guided to the outside through the vibrated and inclined U-shaped guide plate 7, which realizes the effect of automatically discharging the discharged solid impurities to the outside, and further improves the use convenience.
[0033] The use method of the present embodiment is: when the foundation pit recharge water treatment device for rail transit civil construction is used, one end of the first hose 203 is placed in the rail transit civil foundation pit, one end of the discharge hose is placed in the external recharge well, the water pump 5 is started to extract the inside of the left water passage hole 301, the left water passage hole 301 extracts the water in the rail transit civil foundation pit through the first hose 203, and discharges the water to the external recharge well through the discharge hose. When the water passes through the left water passage hole 301, the left filter plate 302 filters and intercepts the solid impurities in the water in the left water passage hole 301, preventing a large amount of solid impurities from entering the recharge well and causing internal blockage;
[0034] The PLC controller 4 is used to pre-set the start of the servo brake motor 8, the opening and closing of the air pump 6, and the opening and closing time of the vibration motor 703 according to the on-site cleaning requirements, and the servo brake motor 8 is preset to start half a circle each time. When the cleaning time is reached, the PLC controller 4 controls the servo brake motor 8, the air pump 6, and the vibration motor 703 to start. When the servo brake motor 8 starts, it drives the circular seat 3 to rotate half a circle, and the circular seat 3 drives the two water passage holes 301 and the two filter plates 302 to rotate and change positions, so that the original left water passage hole 301 and filter plate 302 rotate to the right side to be cleaned, and the original right water passage hole 301 and filter plate 302 rotate to the left side for water filtration work, realizing alternating use. When the air pump 6 starts, it supplies air to the fixed box 601, and the gas well multiple blow cleaning pipe heads 602 blow downward to blow and clean the filter plate 302 that rotates to the right side, and blow and discharge the solid residue in the water passage hole 301 that rotates to the right side downward through the residue discharge pipe 204. When the vibration motor 703 starts, it drives the U-shaped guide plate 7 to vibrate. When the U-shaped guide plate 7 vibrates vertically, it drives the vertical guide rod 701 to move up and down and compresses and releases the spring 702. The elasticity of the spring 702 provides the U-shaped guide plate 7 with the condition of vertical vibration. When the solid impurities are discharged through the residue discharge pipe 204, they fall into the U-shaped guide plate 7 and are guided and discharged to the outside through the vibrating and inclined U-shaped guide plate 7. When the closing time is reached, the PLC controller 4 controls the air pump 6 and the vibration motor 703 to close, and waits for the next cleaning time to start cleaning and discharging again. Through the timed rotation of the two water passage holes 301 and the two filter plates 302, alternating use, combined with the timed automatic blowback cleaning and discharging of solid impurities to the outside, the effect of automatic discharge of solid impurities and cleaning of the filter plate 302 is realized without stopping, and the normal operation of the recharge water filtration treatment is not affected, improving the degree of automation, convenience, and work efficiency, and facilitating automatic cleaning and discharging work without manual intervention.
[0035] Among them, the PLC controller 4, the servo brake motor 8, the air pump 6 and the vibration motor 703 in the utility model are well known to those skilled in the art, belong to conventional means or common general knowledge, and those skilled in the art can make any selection according to their needs or convenience, in addition, the PLC controller 4 controls the servo brake motor 8, the air pump 6 and the vibration motor 703 to start at regular intervals by setting the control time, and the basic numerical control parameter setting control mode well known to those skilled in the art, all belong to conventional means or common general knowledge, and will not be described here.
[0036] Finally, it should be pointed out that: the above only for the preferred embodiments of the utility model, and does not limit the utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can modify the technical scheme recorded in the foregoing embodiments, or make equivalent replacement to part of the technical features. Any modification, equivalent replacement, improvement, etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A foundation pit recharge water treatment device for rail transit civil construction, comprising an L-shaped support plate (1), a locking universal wheel is rotatably installed at the bottom of each corner of the L-shaped support plate (1), characterized in that: A same circular box (2) with an open top is fixedly connected between the right side inner wall and the bottom inner wall of the L-shaped support plate (1), and the top of the circular box (2) is fixedly connected with a cover plate (201); and a PLC controller (4) is fixedly installed on the right top of the L-shaped support plate (1). A circular seat (3) is movably sleeved in the circular box (2), two water passing holes (301) are formed in the top of the circular seat (3), and a filter plate (302) is fixedly installed in each water passing hole (301); a first hose (203) for pumping water in the rail transit civil foundation pit is fixedly communicated to the left water passing hole (301); a backwater discharge assembly for drainage is fixedly installed on the top of the left water passing hole (301); a servo brake motor (8) is fixedly installed on the bottom of the circular box (2) and fixedly connected with the bottom center of the circular seat (3); and the servo brake motor (8) is electrically connected with the PLC controller (4). A slag cleaning and dredging assembly is embedded on the right water passing hole (301) of the top of the cover plate (201) and electrically connected with the PLC controller (4); a slag discharge pipe (204) is fixedly communicated to the right water passing hole (301) on the bottom right of the circular box (2); and a vibration guide assembly is arranged below the slag discharge pipe (204) and electrically connected with the PLC controller (4).
2. The foundation pit recharge water treatment device for rail transit civil construction of claim 1, characterized in that: The backwater discharge assembly comprises a water pump (5) fixedly installed on the top left of the cover plate (201); the cover plate (201) is fixedly sleeved on the water inlet of the water pump (5); the water inlet of the water pump (5) is vertically aligned and communicated with the left water passing hole (301); and a discharge hose is fixedly communicated with the water outlet of the water pump (5).
3. The foundation pit recharge water treatment device for rail transit civil construction of claim 2, characterized in that: The slag cleaning and dredging assembly comprises a fixed box (601) embedded and fixed on the top right of the cover plate (201); a plurality of blowing pipe heads (602) are fixedly communicated to the bottom of the fixed box (601) and located above and communicated with the right water passing hole (301); an air pump (6) is fixedly installed on the top right of the cover plate (201); the air outlet of the air pump (6) is fixedly communicated with the top of the fixed box (601); and the air pump (6) is electrically connected with the PLC controller (4).
4. The foundation pit recharge water treatment device for rail transit civil construction of claim 3, characterized in that: The vibration guide assembly comprises a U-shaped guide plate (7) arranged below the slag discharge pipe (204) and inclinedly arranged; the U-shaped guide plate (7) is inclinedly arranged downward and forward; six vertical guide rods (701) are fixedly connected to the bottom of the U-shaped guide plate (7) in a rectangular shape; the L-shaped support plate (1) is slidably sleeved on the six vertical guide rods (701); six springs (702) are fixedly connected between the bottom of the U-shaped guide plate (7) and the bottom inner wall of the L-shaped support plate (1); the springs (702) are movably sleeved on the corresponding vertical guide rods (701); and a vibration motor (703) electrically connected with the PLC controller (4) is fixedly connected to the bottom of the U-shaped guide plate (7).
5. The foundation pit recharge water treatment device for rail transit civil construction of claim 4, characterized in that: The right side of the L-shaped support plate (1) is fixedly provided with a battery, the PLC controller (4), the water pump (5), the vibration motor (703), the air pump (6) and the servo brake motor (8) are electrically connected with the battery, and the right top of the L-shaped support plate (1) is fixedly connected with a U-shaped handle.
6. The foundation pit recharge water treatment device for rail transit civil construction of claim 1, characterized in that: Two first supporting rods are fixedly connected between the bottom inner wall of the L-shaped support plate (1) and the bottom of the circular box (2), and a connecting seat is fixedly connected between the right side of the circular box (2) and the right inner wall of the L-shaped support plate (1).
7. The foundation recharge water treatment device for rail transit civil construction of claim 1, characterized in that: The top and bottom of the circular seat (3) are fixedly bonded with sealing rubber pads, the bottom inner wall of the circular box (2) and the bottom of the cover plate (201) are movably contacted with corresponding sealing rubber pads, and the top of each sealing rubber pad is provided with a communication hole communicated with a corresponding water hole (301).
8. The foundation pit recharge water treatment device for rail transit civil construction of claim 1, characterized in that: The PLC controller (4) is a numerical control programming controller with timing function.