Plant growth climbing frame
By designing a combination structure of fixing plates and fixing components, the problems of insufficient position adjustment and stability of the climbing frame are solved. It enables flexible adjustment and improved stability according to the row spacing and plant spacing of the plants, making it suitable for the growth needs of different plants and increasing the service life of the climbing frame.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-25
- Publication Date
- 2026-03-24
AI Technical Summary
Existing climbing frames are difficult to adjust their position flexibly according to the row spacing and plant spacing of plants, and their stability is insufficient.
A plant growth climbing frame was designed, which uses a fixed plate and fixed components. Through the combination structure of bending rods, connecting cylinders, sleeves and connecting rods, the position can be adjusted and the stability can be improved. The fixed plate is provided with plate holes and hanging holes. The climbing rods are fixed by threaded connection and clamps. Stainless steel material is used to improve corrosion resistance.
The climbing frame position can be flexibly adjusted according to the row spacing and plant spacing, which improves the overall stability, is suitable for the growth needs of different plants, and extends the service life.
Smart Images

Figure CN224022456U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of agriculture, especially a plant growth climbing frame. BACKGROUND
[0002] When planting gourd, pumpkin, eggplant, cucumber, zucchini and other climbing vegetables, climbing frame needs to be used for vegetable climbing use to ensure normal growth of vegetables. With the development of large-scale vegetable planting, more types of climbing support are also born. In the planting process, according to the growth characteristics of different plants and in order to facilitate management, generally the land is divided into one ridge by one ridge, and the row spacing and plant spacing of plants are also different, and the existing climbing frame is difficult to adjust flexibly according to the needs. And the lower end of the existing climbing frame is generally inserted into the ground, which is not convenient to insert, and the overall stability is not strong.
[0003] Therefore, it is necessary to set a climbing frame which can adjust the position according to the row spacing and plant spacing of plants and improve the stability. UTILITY MODEL CONTENTS
[0004] In order to solve the above problems, the purpose of the utility model is to provide a plant growth climbing frame which can adjust the position according to the row spacing and plant spacing of plants and improve the stability.
[0005] In order to achieve the above purpose, the technical scheme adopted by the utility model is:
[0006] 2. A plant growth climbing frame, mainly comprising a fixing plate, a plurality of fixing assemblies, a plurality of first climbing poles and a plurality of second climbing poles, wherein a plurality of strip-shaped plate holes are formed on the fixing plate, the length direction of the plate holes is parallel to the length direction of the fixing plate, each of the fixing assemblies is inserted into the plate hole of the fixing plate, and the fixing assemblies are arranged on both sides of the fixing plate; the fixing assembly comprises a bent rod, a connecting cylinder, a sleeve and a connecting rod; the included angle of the bent rod is greater than 90 degrees, the first end of the bent rod is inserted into the ground, the connecting cylinder is slidably connected to the second end of the bent rod, a first connecting hole is formed on the side wall of the connecting cylinder, the axis of the first connecting hole is perpendicular to the axis of the connecting cylinder, a first stud is threadedly connected to the first connecting hole, and the end of the first stud abuts against the side wall of the bent rod in the connecting cylinder; a rotating shaft is perpendicularly connected to the outer side wall of the connecting cylinder, the sleeve is rotatably connected to the rotating shaft, the axis of the rotating shaft is perpendicular to the axis of the sleeve, the connecting rod is slidably connected to the sleeve, a second connecting hole is formed on the side wall of the sleeve, a second stud is threadedly connected to the second connecting hole, and the end of the second stud abuts against the connecting rod in the sleeve; the connecting rod is inserted into the plate hole of the fixing plate, a first nut and a second nut are threadedly connected to the connecting rod, and the first nut and the second nut abut against both sides of the fixing plate; a plurality of clamping blocks are arranged on each of the bent rods, a connecting rope is connected to each of the clamping blocks, and a plurality of first climbing poles are arranged between adjacent two bent rods; the two ends of each of the first climbing poles are placed on the clamping blocks of the adjacent two bent rods, and the connecting rope fixes the first climbing pole on the clamping block at the corresponding position.
[0007] Further, a pressing plate is arranged on the first end of the bent rod, and a plug is arranged on the lower end surface of the pressing plate.
[0008] Further, each component of the climbing frame is made of stainless steel.
[0009] Further, a plurality of hanging holes are formed on the fixing plate along the length direction, and the second climbing poles are movably hung on the hanging holes.
[0010] Further, a plurality of rod holes are formed on the second climbing pole along the length direction, the rod holes are arranged on the same side of the plate hole, and horizontal rods are movably inserted into the rod holes.
[0011] Further, the outer shape of the second climbing pole is spiral.
[0012] Compared with the prior art, the plant growth climbing frame has the following beneficial effects:
[0013] 1、The first end of the bending rod of the fixing assembly can be vertically inserted into the ground, and the bending rod is fixed on the ground, and the second end of the bending rod is connected with the connecting rod, one end of the connecting rod is inserted into the sleeve of the connecting barrel of the bending rod, the other end of the connecting rod is inserted into the plate hole of the fixing plate, and the connecting rod is fixed on the fixing plate through the first nut and the second nut. Because each bending rod on the two sides of the fixing plate is connected with the fixing plate through the connecting rod, each bending rod is supported by the fixing plate and the plurality of bending rods, and the stability of the whole is improved.
[0014] 2、The spacing of the bending rods on the opposite sides of the fixing plate is adjusted through the connecting position of the connecting rod, and is suitable for plants with different row spacings; the connecting rod can be connected in different positions of the plate hole, so that the spacing of the plurality of fixing assemblies on the same side of the fixing plate can be adjusted, and plants with different plant spacings are convenient to use.
[0015] 3、The height of the fixing plate can be adjusted by sliding the fixing assembly on the bending rod, and is suitable for different plants needing to climb height. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 is a schematic diagram of the overall structure provided by the embodiment of the utility model.
[0017] Figure 2 is a front view of the overall structure provided by the embodiment of the utility model.
[0018] Figure 3 is a top view of the overall structure provided by the embodiment of the utility model.
[0019] Among them, 1 is a pressing plate, 2 is a plug, 3 is a bending rod, 4 is a fixing plate, 5 is a plate hole, 6 is a hanging hole, 7 is a second screw column, 8 is a sleeve, 9 is a connecting rod, 10 is a connecting barrel, 11 is a first screw column, 12 is a first nut, 13 is a second nut, 14 is a second climbing rod, 15 is a horizontal rod, 16 is a clamping block, 17 is a connecting rope, and 18 is a first climbing rod. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. The drawings are only used for illustrative description, and the representation is only a schematic diagram, not a physical diagram, and should not be understood as a limitation on the present application. In order to better illustrate the specific embodiments of the present application, some components in the drawings are omitted, enlarged or reduced, and do not represent the size of the actual product. It is understandable for those skilled in the art that some known structures, components and their descriptions in the drawings can be omitted. The "upper", "lower", "left", "right" are described with reference to the drawings, and do not represent the actual position of the product. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor are within the scope of protection of the present application.
[0021] In the description of the present application, it should be noted that, unless otherwise explicitly specified and limited, the terms "set", "connected" should be understood broadly, for example, it can be fixedly connected, or detachably connected, or integrally connected; it can be mechanically connected, or electrically connected; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the communication between two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0022] The specific embodiment, as shown in the figure, is a preferred embodiment of the utility model. A plant growth climbing frame mainly comprises a fixed plate 4, a plurality of fixed assemblies, a strip-shaped plate hole 5 is formed on the fixed plate 4, the length direction of the plate hole 5 is parallel to the length direction of the fixed plate 4, each fixed assembly is inserted on the plate hole 5 of the fixed plate 4, and a plurality of fixed assemblies are located on both sides of the fixed plate 4; the fixed assembly comprises a bent rod 3, a connecting cylinder 10, a sleeve 8 and a connecting rod 9; the included angle of the bent rod 3 is greater than ninety degrees, the first end of the bent rod 3 is inserted on the ground, the second end of the bent rod 3 is slidably connected with the connecting cylinder 10, a first connecting hole is formed on the side wall of the connecting cylinder 10, the axis of the first connecting hole is perpendicular to the axis of the connecting cylinder 10, a first stud 11 is threadedly connected on the first connecting hole, and the end of the first stud 11 abuts on the side wall of the bent rod 3 in the connecting cylinder 10; a rotating shaft is vertically connected on the outer side wall of the connecting cylinder 10, the sleeve 8 is rotatably connected on the rotating shaft, the axis of the rotating shaft is perpendicular to the axis of the sleeve, the connecting rod 9 is slidably connected in the sleeve 8, a second connecting hole is formed on the side wall of the sleeve 8, a second stud 7 is threadedly connected on the second connecting hole, and the end of the second stud 7 abuts on the connecting rod 9 in the sleeve 8; the connecting rod 9 is inserted on the plate hole 5 of the fixed plate 4, a first nut 12 and a second nut 13 are threadedly connected on the connecting rod 9, and the first nut 12 and the second nut 13 abut on both sides of the fixed plate 4 respectively; a plurality of clamping blocks 16 are annularly arranged on each bent rod 3, a connecting rope 17 is connected on the clamping block 16, a plurality of first climbing rods 18 are arranged between the adjacent two bent rods 3, the two ends of each first climbing rod 18 are placed on the clamping blocks 16 of the adjacent two bent rods, and the connecting rope 17 fixes the first climbing rod 18 on the corresponding clamping block 17.
[0023] Because in the process of planting, generally will be divided into a row of land, help plant growth and artificial management plant. When the plant growth to a certain stage, need to use climbing frame to assist growth. Climbing frame is used the number and position of fixed assembly is determined according to each row of land and plant spacing. The multiple fixed assembly of climbing frame is fixed in each row of land on both sides, fixed plate 4 is located above the row of land. Because the bending rod 3 of each fixed assembly is independent of each other, the plant climbing on the bending rod 3 grows and bears fruit, will cause the overall center of gravity and weight of the bending rod 3 change, stability is weak. Therefore, need to connect the bending rod 3 of multiple fixed assembly together through the fixed plate 4, through the multiple fixed assembly on both sides of the fixed plate 4 support each other, can improve the overall stability. Because the width of each row of land is different, in order to facilitate the adjustment of the width of the climbing frame, further, the connecting rod 9 connected with the fixed plate 4 is slidingly connected in the sleeve 8, the distance from each fixed assembly to the fixed plate 4 is adjusted by sliding the connecting rod 9 in the sleeve 8, so as to adjust the width of the climbing frame, so as to be suitable for different width of the row of land. Because the position of the bending rod 3 installed on both sides of the row of land is placed according to the growth position of the plant, and when the artificial inserts the bending rod 3, if it is necessary to insert the bending rod 3 at the symmetrical position, it is necessary to measure and then insert the bending rod 3 each time, which is time-consuming and laborious, and cannot guarantee that the bending rod 3 on both sides of the row of land is exactly in the opposite position, so the same connecting rod 9 cannot be used to connect the sleeve 8 on the bending rod 3 on both sides of the row of land. Therefore, a connecting rod 9 is connected on each bending rod 3, one end of each connecting rod 9 is slidingly connected in the sleeve 8 of the bending rod 3, the other end can be slidingly connected in the plate hole 5 of the fixed plate 4 according to the position of the bending rod 3, and is fixed by the first nut 12 and the second nut 13 after sliding to the appropriate position, without the position of the bending rod 3 on both sides being opposite to each other, reducing the workload when inserting the bending rod 3.
[0024] When the first end of the bending rod 3 is inserted into the ground, the bending rod 3 can be fixed on the ground, and at this time the second end of the bending rod 3 is towards the plant. Because the first end of the bending rod 3 is vertically inserted into the ground, the depth of insertion is deep, which is more stable than the traditional herringbone support which is placed on the ground or is inserted into the ground obliquely. After inserting the bending rod 3 on both sides of the row of land, the connecting rod 9 on the bending rod 3 is connected with the fixed plate 4, and the connecting rod 9 on both sides needs to be at the same height position. But because the depth of insertion of each bending rod 3 is different when it is inserted into the ground, in order to make the height of the connecting rod 9 fixed on the connecting cylinder 10 similar, therefore, the connecting cylinder 10 can slide up and down on the bending rod 3, so that the height of the connecting rod 9 can be adjusted.
[0025] In the installation of the climbing frame, all the bent rods 3 can be fixed on the ground first, and then the height of the connecting cylinder 10 on the first bent rod 3 at the end of the ridge is adjusted to a suitable height suitable for the climbing growth of the plants, the height of the connecting cylinder 10 is fixed by using the first stud 11, then the first connecting rod 9 is inserted into the sleeve 8 connected with the connecting cylinder 10 on the first bent rod 3, and the first connecting rod 9 is fixed in the sleeve 8 by using the second stud 7, then the other end of the first connecting rod 9 is inserted into the plate hole 5 of the fixed plate 4, and the first connecting rod 9 and the fixed plate 4 are connected by using the first nut 12 and the second nut 13. Because the bent rod 3 is inserted into the ground, it cannot be guaranteed that the axis of the sleeve 8 is parallel to the horizontal line, so it cannot be guaranteed that the connecting rod 9 inserted into the sleeve 8 is parallel to the horizontal line, so that the connecting rods 9 on both sides of the fixed plate 4 cannot be inserted into the plate hole 5 at the same time. Therefore, further, the sleeve 8 and the connecting cylinder 10 are rotatably connected, and when the connecting rod 9 is inserted into the sleeve 8, the height of each connecting rod 9 is adjusted by moving the connecting cylinder 10, and the sleeve 8 is rotated, so that each connecting rod 9 can be inserted into the plate hole 5 horizontally. When the sleeve 8 and the connecting cylinder 10 are rotatably connected, the first connecting rod 9 and the fixed plate 4 will rotate with the sleeve 8 on the connecting cylinder 10 of the first bent rod 3. At this time, the second connecting rod 9 connected to the second bent rod 3 opposite to the first bent rod 3 is fixed on the sleeve 8 and the fixed plate 4, at this time, the first connecting rod 9, the second connecting rod 9 and the fixed plate 4 form a fixed whole, at this time, the whole is connected with the sleeve 8 on the first bent rod 3 and the second bent rod 3 respectively, the two sleeves 8 do not rotate under the connection of the whole, and the two sleeves 8 support and fix the first connecting rod 9 and the second connecting rod 9. When the fixed plate 4 has a plurality of fixed assemblies on both sides, the mutual support of a plurality of bent rods 3 can make the whole climbing frame more stable and facilitate the climbing growth of the plants.
[0026] In order to facilitate the upward climbing of the plants, a plurality of first climbing rods 18 are installed between the two adjacent bent rods 3, and the plurality of first climbing rods 18 are fixed on the clamping blocks 16 at different heights by the connecting ropes 17, which provides a foothold for the plants to climb and facilitates the climbing of the plants.
[0027] Because the first end of the bending rod 3 is inserted into the ground, it is difficult to insert the bending rod 3 with hands. Further, the first end of the bending rod 3 is provided with a pressing plate 1, and the lower end surface of the pressing plate 1 is provided with two insertion nails 2. When the first end of the bending rod 3 needs to be inserted, the user holds the bending rod 3 with hands and steps on the pressing plate 1, so that the pressing plate 1 provides a force point, and the bending rod 3 can be conveniently inserted. The two insertion nails 2 provided on the lower end surface of the pressing plate 1 can prevent the first end of the bending rod 3 from shaking to the two sides after being inserted into the ground, thereby improving the stability.
[0028] Further, each component of the climbing frame is made of stainless steel material, which has the effect of corrosion resistance and prolongs the service life.
[0029] Further, the fixing plate 4 is provided with a plurality of hanging holes 6 along the length direction, and the second climbing rod 14 is movably hung on the hanging hole 6. The second climbing rod 14 provides more climbing force points for the growing plants, and the plants can not necessarily climb upward through the bending rods 3 on both sides of the ridge. The second climbing rod 14 is hung in the hanging hole 6 of the fixing plate 4 above the place where the plants grow luxuriantly, which is helpful for the plants to climb and grow.
[0030] Further, the second climbing rod 14 is provided with a plurality of rod holes along the length direction, and the plurality of rod holes are located on the same side of the plate hole 5. The horizontal rod 15 is movably inserted into the rod hole, and the horizontal rod 15 can better provide force points for the plants to climb upward.
[0031] Further, the second climbing rod 14 has a spiral shape, which is convenient for the plants to climb upward.
[0032] The above description is a detailed description of the preferred and feasible embodiments of the present application, but the embodiments are not used to limit the patent application range of the present application. Any equivalent changes or modified changes completed under the technical spirit of the present application should belong to the patent range covered by the present application.
Claims
1. A plant growth climbing frame characterised in that: The utility model relates to a kind of climbing frame, including fixed plate, multiple fixed components, long strip-shaped board hole is set on the fixed plate, the length direction of the board hole and the length direction of fixed plate are parallel, each fixed component is inserted on the board hole of fixed plate, and multiple fixed components are located at the both sides of fixed plate respectively;The fixed component includes bending rod, connecting cylinder, sleeve, connecting rod;The included angle of the bending rod is greater than ninety degrees, the first end of the bending rod is inserted into ground, the second end of the bending rod is slidably connected with connecting cylinder, and the connecting cylinder is fixed on the bending rod by fixed component;First connecting hole is set on the lateral wall of the connecting cylinder, the axis of the first connecting hole is perpendicular to the axis of connecting cylinder, first stud is threadedly connected on the first connecting hole, and the end of the first stud is abutted on the lateral wall of the bending rod in connecting cylinder;Perpendicular connecting shaft is connected on the outer lateral wall of the connecting cylinder, the sleeve is rotatably connected on the connecting shaft, the axis of the connecting shaft is perpendicular to the axis of sleeve, connecting rod is slidably connected in the sleeve, second connecting hole is set on the lateral wall of the sleeve, second stud is threadedly connected on the second connecting hole, and the end of the second stud is abutted on the connecting rod in the sleeve, the connecting rod is inserted on the board hole of fixed plate, first nut and second nut are threadedly connected on the connecting rod, and the first nut and the second nut are respectively abutted on the both sides of fixed plate;Multiple clamping blocks are annularly arranged on each bending rod, connecting rope is connected on the clamping block, multiple first climbing rods are installed between the adjacent two bending rods, and the both ends of each first climbing rod are placed on the clamping block of adjacent two bending rods, and the connecting rope fixes the first climbing rod on the clamping block in corresponding position.
2. A plant growth climbing frame as claimed in claim 1 characterised in that: The first end of the bending rod is provided with a pressing plate, and the lower end surface of the pressing plate is provided with a plug at both ends.
3. A plant growth climbing frame as claimed in claim 1 characterised in that: Each component of the climbing frame is made of stainless steel material.
4. A plant growth climbing frame as claimed in claim 1 characterised by: The fixed plate is provided with multiple hanging holes along the length direction, and the second climbing rod is movably hung on the hanging hole.
5. A plant growth climbing frame as claimed in claim 4, characterised in that: The second climbing rod is provided with multiple rod holes along the length direction, and multiple rod holes are located on the same side of the board hole.
6. A plant growth climbing frame as claimed in claim 4, characterised in that: The outer shape of the second climbing rod is spiral.