Urban park ecological wall structure
The eco-wall structure, designed with modular panels and connecting frames, solves the problem of low installation efficiency in small space designs of existing eco-walls, enabling flexible placement of green plants and efficient assembly and disassembly, thus improving the aesthetics and ease of maintenance of the eco-wall.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-27
- Publication Date
- 2026-03-27
AI Technical Summary
When the space occupied by the existing ecological wall structure is small, the installation and disassembly efficiency is low, and it is not convenient to disassemble and assemble individual mounting panels, which affects the aesthetics and maintenance efficiency.
The design employs modular mounting plates and extended connecting frames, allowing for flexible splicing and fixing of the mounting plates via bolt connections and limiting plugs. This enables plants to be placed freely and maintain their growth status through the sprinkler pipe frame.
It enables rapid installation and disassembly of ecological walls based on greening plans, improving installation aesthetics and maintenance efficiency, facilitating operation of individual mounting panels, and meeting different planning needs.
Smart Images

Figure CN224038042U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to ecological wall technical field, concretely relates to a city park ecological wall structure. BACKGROUND
[0002] Plant wall is the wall body that is planted with green plants, is permanent growth in the vertical building wall surface with the superstrong self -adaptability of the root system of plant to the growing environment in nature, provides a new type organic ecological material for building design and building decoration.
[0003] The ecological wall structure of green building discloses a kind of ecological wall structure of green building, it can be conveniently and quickly replaced to installation frame after installation frame appears damage, guarantee overall replacement efficiency, but the device can only carry out dismounting operation to an ecological wall in the process of using, when the space occupancy planning of green plant design is less, the device still needs to occupy certain space area to install main part.For this, we propose a city park ecological wall structure. UTILITY MODEL CONTENT
[0004] In view of the problems in the prior art, the utility model provides a city park ecological wall structure.
[0005] The utility model solves technical scheme that it adopts is a kind of city park ecological wall structure, including installation module board, the surface of installation module board is equipped with installation panel, the surface of installation panel is equipped with multiple equidistant distribution installation slot, the inside of installation slot is inserted with installation plate, the central part of installation plate is fixedly connected with the embedded rack for placing green plant;
[0006] The side of installation module board away from installation panel is integrally formed with extension connecting frame, the top of extension connecting frame is through and is equipped with insertion hole, the bottom of extension connecting frame is integrally formed with the insertion piece that is compatible with the diameter of insertion hole, one end of the side of installation module board away from installation panel is equipped with splicing groove, the end of installation module board away from splicing groove is equipped with splicing plate by hinge.
[0007] Through adopting the above technical scheme, according to the planning of green plant placement to install embedded rack, the multiple installation slots on the surface of installation panel are inserted one by one, and bolt is rotated into second splicing hole through first splicing hole to complete bolt connection and fixation, when multiple installation plates are installed, the rough pattern structure can be formed on the surface of installation module board, and green plant can be placed in embedded rack, the placement position of green plant can be freely changed, the installation of overall ecological wall is more beautiful, and staff can dismount single installation plate conveniently;
[0008] According to the placement plan of each installation module plate, the embedded frame is installed, then a plurality of installation module plates are spliced and assembled, the bottom installation module plate is fixed on the ground through the support, then the limiting plug-in part is inserted into the limiting sliding groove along the installation module plate, the splicing plate and the splicing groove are aligned, the splicing plate is rotated into the splicing groove and is locked by the bolt to complete the splicing, when the installation module plate needs to be stacked, the plug-in part is inserted into the plug-in hole and the above steps are repeated to complete the assembly of the installation module plate, the embedded frame can be quickly installed and assembled to form a complete ecological wall joint according to different planning requirements, the disassembly, assembly and maintenance efficiency is faster, and the operation of the staff is more convenient.
[0009] Specifically, the side wall of the installation module plate is integrally formed with a limiting plug-in part, and a limiting sliding groove matched with the limiting plug-in part is formed on the side of the installation module plate away from the limiting plug-in part.
[0010] By adopting the above technical scheme, when installing, the two installation module plates are aligned, the limiting plug-in part can be inserted into the limiting sliding groove, so that the splicing plate can be aligned with the corresponding connecting piece, thereby facilitating the assembly of the installation module plate into a complete ecological wall structure.
[0011] Specifically, the surface of the splicing plate and the splicing groove is provided with a fixing hole with a matching aperture.
[0012] By adopting the above technical scheme, the two installation module plates are spliced and fixed by screwing through the fixing hole.
[0013] Specifically, the surface of the installation plate is provided with a first splicing hole at each corner, and the surface of the installation groove is provided with a second splicing hole matched with the first splicing hole.
[0014] By adopting the above technical scheme, the first splicing hole and the second splicing hole are aligned and screwed into the bolt to fix the embedded frame on the installation panel.
[0015] Specifically, the surface of the installation module plate is provided with a spray pipe rack above the installation panel.
[0016] By adopting the above technical scheme, the installation module plate provided with the spray pipe rack is placed on the highest layer of the ecological wall body and connected with the water pipe to maintain the state of spraying water mist to maintain the growth state of the ecological wall plants.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] The technical scheme of the present application installs the embedded frame according to the arrangement of the green plants, inserts the installation plates into the plurality of installation grooves formed on the surface of the installation panel one by one, and rotates the bolt through the first splicing hole into the second splicing hole to complete the bolt connection and fixation, so that a rough pattern structure is formed on the surface of the installation module plate after the plurality of installation plates are installed, the green plants can be placed inside the embedded frame, the arrangement position of the green plants can be freely changed, the installation of the overall ecological wall is more beautiful, and the staff can conveniently disassemble and assemble the single installation plate.
[0019] The embedded frame is installed according to the arrangement of each installation module plate, and then the plurality of installation module plates are spliced and assembled, the installation module plates at the bottom are fixed on the ground through the support, the limiting insert is inserted into the limiting sliding groove along the installation module plate, the splicing plate is aligned with the splicing groove, the splicing plate is rotated into the splicing groove and locked through the bolt to complete splicing, when the installation module plate needs to be stacked, the plug-in part is inserted into the plug-in hole, and the above steps are repeated to complete the assembly of the installation module plate, the embedded frame can be quickly installed and assembled to form a complete ecological wall joint according to different planning requirements, the disassembly, assembly and maintenance efficiency is faster, and the staff can operate more conveniently. BRIEF DESCRIPTION OF DRAWINGS
[0020] The present application is further described below in combination with the drawings and embodiments.
[0021] Fig. 1 It is an isometric view of the present application.
[0022] Fig. 2 It is a surface connection structure schematic view of the installation module plate of the present application.
[0023] Fig. 3 It is a back connection structure schematic view of the installation module plate of the present application.
[0024] In the drawings: 1, installation module plate; 2, installation panel; 3, installation groove; 4, second splicing hole; 5, installation plate; 6, first splicing hole; 7, embedded frame; 8, limiting insert; 9, limiting sliding groove; 10, extension connecting frame; 11, plug-in part; 12, plug-in hole; 13, splicing plate; 14, splicing groove; 15, spraying pipe frame. DETAILED DESCRIPTION
[0025] In order to make the technical means, creative features, purposes and effects of the present application easy to understand, the present application is further described below in combination with specific embodiments.
[0026] Please refer to Figs. 1-3The utility model discloses an urban park ecological wall structure, including installation module board 1, the surface of installation module board 1 is equipped with installation panel 2, the surface of installation panel 2 is equipped with multiple equidistance distribution's installation slot 3, the inside plug connection of installation slot 3 is equipped with installation board 5, the central place fixed connection of installation board 5 is equipped with the embedded frame 7 for placing green plant,
[0027] The installation module board 1 is integrally formed with an extension connecting frame 10 away from the installation panel 2 on one side, the top end of the extension connecting frame 10 is provided with a plug-in hole 12, the bottom end of the extension connecting frame 10 is integrally formed with a plug-in part 11 that is in diameter with the plug-in hole 12, one end of the installation module board 1 away from the installation panel 2 is provided with a splicing groove 14, and the other end of the installation module board 1 away from the splicing groove 14 is provided with a splicing plate 13 through a hinge.
[0028] In use, the embedded frame 7 is installed according to the plan of placing green plants, the installation board 5 is inserted into the multiple installation slots 3 on the surface of the installation panel 2, and the bolt is screwed into the second splicing hole 4 through the first splicing hole 6, so that the bolt connection and fixation are completed, when the multiple installation boards 5 are installed, a rough pattern structure is formed on the surface of the installation module board 1, and the green plants are placed in the embedded frame 7, the placing position of the green plants can be freely changed, the installation of the overall ecological wall is more beautiful, and the single installation board 5 is convenient for staff to disassemble and assemble.
[0029] According to the plan of placing the embedded frame 7 on each installation module board 1, the multiple installation module boards 1 are spliced and assembled, the bottom installation module board 1 is fixed on the ground through the support, then the limiting plug-in part 8 is inserted into the limiting sliding groove 9 along the installation module board 1, the splicing plate 13 is aligned with the splicing groove 14, the splicing plate 13 is rotated into the splicing groove 14 and locked through the bolt, and the assembly of the installation module board 1 is completed, the embedded frame 7 can be quickly installed and assembled to form a complete ecological wall joint according to different planning requirements, the disassembly and maintenance efficiency is faster, and the staff operation is more convenient.
[0030] As shown in the drawings, the limiting plug-in part 8 is integrally formed on one side wall of the installation module board 1, and the limiting sliding groove 9 that is matched with the limiting plug-in part 8 is formed on the side of the installation module board 1 away from the limiting plug-in part 8.
[0031] In use, during installation, the two installation module boards 1 are aligned, the limiting plug-in part 8 can be inserted into the limiting sliding groove 9, so that the splicing plate 13 can be aligned with each corresponding connecting part, and the installation module boards 1 can be assembled into a complete ecological wall structure.
[0032] As shown in the figure, the surface of the splicing plate 13 and the splicing groove 14 is provided with a fixed hole with a matching aperture.
[0033] In use, two installation module plates 1 are spliced and fixed by screwing through the fixed holes.
[0034] As shown in the figure, the surface of the installation plate 5 is provided with a first splicing hole 6 at each corner, and the surface of the installation groove 3 is provided with a second splicing hole 4 matching the first splicing hole 6.
[0035] In use, the first splicing hole 6 is aligned with the second splicing hole 4, and then a bolt is screwed in to fix the embedded frame 7 on the installation panel 2.
[0036] As shown in the figure, the surface of the installation module plate 1 is provided with a spray pipe frame 15 above the installation panel 2.
[0037] In use, the installation module plate 1 provided with the spray pipe frame 15 is placed on the highest layer of the ecological wall body, and a water pipe is connected to maintain the state of spraying water mist to maintain the growth state of the ecological wall green plants.
[0038] The working principle and use process of the utility model: according to the planning of green plants, the embedded frame 7 is installed, the installation plate 5 is inserted into the multiple installation grooves 3 provided on the surface of the installation panel 2, and the bolt is screwed into the second splicing hole 4 through the first splicing hole 6 to complete the bolt connection and fixation, when the multiple installation plates 5 are installed, a rough pattern structure is formed on the surface of the installation module plate 1, and the green plants are placed in the embedded frame 7, the placement position of the green plants can be freely changed, the installation of the overall ecological wall is more beautiful, and the staff can conveniently disassemble and assemble the single installation plate 5, the embedded frame 7 is installed according to the placement planning of each installation module plate 1, then the multiple installation module plates 1 are spliced and assembled, the bottom installation module plate 1 is fixed on the ground through the support, then the limiting plug-in part 8 is inserted into the limiting sliding groove 9 along the installation module plate 1, the splicing plate 13 is aligned with the splicing groove 14, the splicing plate 13 is rotated into the inside of the splicing groove 14 and is locked by the bolt to complete the splicing, when the installation module plate 1 needs to be stacked, the plug-in part 11 is inserted into the plug-in hole 12 and the above steps are repeated to complete the assembly of the installation module plate 1, according to different planning requirements, the embedded frame 7 can be quickly installed and assembled to form a complete ecological wall joint, the disassembly and maintenance efficiency is faster, and the staff can operate more conveniently, the installation module plate 1 provided with the spray pipe frame 15 is placed on the highest layer of the ecological wall body, and a water pipe is connected to maintain the state of spraying water mist to maintain the growth state of the ecological wall green plants.
[0039] The basic principle, main features and advantages of the present application are shown and described above. Those skilled in the art should understand that the present application is not limited by the above embodiments, and the above embodiments and descriptions in the specification are only to illustrate the principles of the present application. Without departing from the spirit and scope of the present application, various changes and improvements can be made to the present application, and these changes and improvements all fall within the scope of the present application. The scope of protection of the present application is defined by the appended claims and their equivalents.
Claims
1. A city park ecological wall structure, characterized in that, Including installation module board (1), the surface of installation module board (1) is equipped with installation panel (2), the surface of installation panel (2) is equipped with multiple equidistant distribution installation slot (3), the inside of installation slot (3) is inserted with installation board (5), the central part of installation board (5) is fixedly connected with the embedded rack (7) for placing green plants; The side of installation module board (1) away from installation panel (2) is integrally formed with extension connecting frame (10), the top end of extension connecting frame (10) is throughly provided with insertion hole (12), the bottom end of extension connecting frame (10) is integrally formed with insertion piece (11) that is in diameter with insertion hole (12), one end of the side of installation module board (1) away from installation panel (2) is provided with splicing slot (14), the end of installation module board (1) away from splicing slot (14) is hingedly provided with splicing plate (13).
2. The urban park ecological wall structure according to claim 1, characterized in that, The side wall of installation module board (1) is integrally formed with limiting insert (8), the side of installation module board (1) away from limiting insert (8) is provided with limiting sliding slot (9) that is in agreement with limiting insert (8).
3. The urban park ecological wall structure according to claim 1, characterized in that, The surface of splicing plate (13) and splicing slot (14) is provided with fixed hole that is in aperture agreement.
4. The urban park ecological wall structure according to claim 1, characterized in that, The surface of installation board (5) is provided with first splicing hole (6) in four corners, and the surface of installation slot (3) is provided with second splicing hole (4) that is in agreement with first splicing hole (6).
5. The urban park ecological wall structure according to claim 1, characterized in that, The surface of installation module board (1) is provided with spray pipe frame (15) above installation panel (2).
Citation Information
Patent Citations
Ecological wall structure of green building
CN222639188U