Reconnaissance drill rod erecting equipment
By designing a vertical drilling device for exploration, and utilizing the inclined and staggered arrangement of the vertical device, the problems of friction and deformation during drilling rod placement were solved, achieving stable hoisting and easy operation of the drilling rod.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-22
- Publication Date
- 2026-03-27
AI Technical Summary
Traditional drill pipe placement methods can easily lead to end friction and bending deformation of the pipe body, affecting drilling stability.
A drilling rod vertical placement device for exploration is designed, including a vertical placement device that uses a combination of support members, bracing members and connectors, and through an inclined design and staggered arrangement, to stabilize the placement of the drilling rod and reduce friction and deformation.
It improves the stability of drill pipe placement, reduces drill pipe deformation during hoisting, and ensures the stability of the drilling process and the ease of locating and selecting drill pipe.
Smart Images

Figure CN224049120U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a drilling equipment field, especially a surveying drill rod vertical placing equipment. BACKGROUND
[0002] Drilling equipment, equipment for drilling. Broadly speaking, including complete ground equipment for drilling, special drilling tools and drilling instruments. According to function, it is divided into rotation, lifting, circulation, power and transmission, control etc. system, when drilling equipment is drilling, the drill rod needs to be used, however, the traditional drill rod placing mode is generally arranged on two horizontal sleepers on the ground, when personnel need to use a certain drill rod, hoisting equipment is used to hoist it.
[0003] But in the specific hoisting, first the end of the drill rod will be separated from one sleeper and contact with the ground, easy to cause the friction of the end of the drill rod, simultaneously, since the drill rod is generally long, one end is hoisted and the other end contacts with the ground, the pressure will be concentrated in the end contacting with the ground, therefore, the phenomenon that the end of the drill rod is bent and deformed is easy to appear, and the stability of the drill rod when drilling is seriously affected.
[0004] Therefore, a surveying drill rod vertical placing equipment is provided to solve the above problems. UTILITY MODEL CONTENTS
[0005] The utility model discloses a surveying drill rod vertical placing equipment, and the end friction and the problem of rod body bending deformation caused by the placing mode of the traditional drill rod are improved.
[0006] The utility model discloses a surveying drill rod vertical placing equipment, and the end friction and the problem of rod body bending deformation caused by the placing mode of the traditional drill rod are improved.
[0007] The vertical placing device mainly comprises a supporting piece, a supporting piece arranged in the supporting piece and a plug-in piece arranged on the surface of the supporting piece.
[0008] The supporting piece comprises two supporting plates, and a folding plate is hinged between the top of the opposite sides of the two supporting plates.
[0009] The supporting piece comprises a horizontal screw rod and a vertical screw rod arranged between the two supporting plates.
[0010] Preferably, the supporting piece further comprises a sleeve threadedly connected to the surface of the horizontal screw rod, the surface of the sleeve is provided with a connecting rod, and the connecting rod is designed longitudinally. By arranging the sleeve, the interval of the two horizontal screw rods can be adjusted by screwing, so as to adjust the inclination angle of the two supporting plates, and the horizontal stability of the whole device can be maintained at the same time.
[0011] Preferably, the surface of the connecting rod is provided with a vertical pipe, the inner wall of the vertical pipe is threadedly connected with a vertical screw rod, the upper end of the vertical screw rod is provided with an abutting plate through a bearing seat, the upper part of the abutting plate is in contact with a folding plate, and the vertical pipe, the vertical screw rod and the abutting plate can vertically support the whole vertical placing device and keep the whole device stable.
[0012] Preferably, the support further comprises a connecting sleeve threadedly connected to the transverse screw rod on the side close to the support plate, and the surface of the connecting sleeve is fixedly connected with the support plate through a hinged seat, so that the transverse screw rod and the support plate are conveniently connected, the support plate is adjusted, and a quick release effect is achieved, thereby conveniently transporting personnel.
[0013] Preferably, the side view plane of the support plate is designed as a trapezoidal shape, and the support plate is placed obliquely, so that the whole vertical placing device is kept stable, and when the drilling rod is lifted by hoisting equipment, the oblique angle can support the drilling rod when the drilling rod rises, thereby keeping the rising movement of the drilling rod stable.
[0014] Preferably, the plug-in part comprises a placing shell arranged on the surface of the support plate, a plurality of placing shells are arranged in a rectangular array, and two groups of placing shells are arranged in a staggered manner, so that the end of each drilling rod can be independently exposed outside after the drilling rod is placed, thereby conveniently searching and selecting the drilling rod.
[0015] Preferably, a protective pad is arranged at the lower part of the placing shell, and the material of the protective pad is sponge, so that the end of the drilling rod can be wrapped and protected when the drilling rod is inserted into the placing shell after use, thereby preventing the end of the drilling rod from being deformed under pressure.
[0016] The utility model discloses the beneficial effect is:
[0017] 1. By setting up the supporting piece and the plug-in part, a plurality of drilling rods can be arranged and vertically inserted and placed in a staggered manner before personnel carry out well drilling operation, so that the end of each drilling rod can be independently exposed outside after the drilling rod is placed, thereby conveniently searching and selecting the drilling rod.
[0018] 2. By setting up support components, not only can the support plate and folding plate be supported to form a stable and detachable drill rod placement seat, but the angle of the support plate and the support height of the drill rod can also be adjusted according to the terrain and the length of the drill rod, which can effectively maintain the stability of the drill rod when it is placed. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the structure of this utility model;
[0020] Figure 2 This is a schematic diagram of the disassembled structure of the support component of this utility model;
[0021] Figure 3 This is a schematic diagram of the folded form of the support component of this utility model;
[0022] Figure 4 This is a partial structural diagram of the support member of this utility model.
[0023] Figure 5 This is a partial cross-sectional view of the connector of this utility model.
[0024] In the diagram: 1. Vertical placement device; 11. Support component; 111. Support plate; 112. Folding plate; 12. Support component; 121. Sleeve; 122. Horizontal lead screw; 123. Connecting sleeve; 124. Connecting rod; 125. Vertical tube; 126. Vertical lead screw; 127. Abutment plate; 13. Insertion component; 131. Placement shell; 132. Protective pad. Detailed Implementation
[0025] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0026] In practical implementation: such as Figures 1-5 As shown, a drilling pipe vertical placement device includes: a vertical placement device 1;
[0027] The vertical placement device 1 mainly consists of a support member 11, a support member 12 disposed in the support member 11, and a connector 13 disposed on the surface of the support member 11.
[0028] It should be noted that drill rods are generally placed in an arrangement on two horizontal sleepers on the ground. When personnel need to use a particular drill rod, it is then lifted up using hoisting equipment.
[0029] The support 12 and the support plates 111 are in contact with the ground, and the whole device is basically located beside the drilling equipment to facilitate the hoisting equipment to transport different drill pipes. Since the vertical placement device 1 is in the shape of a trapezoid, it can be stably placed in contact with the ground. If necessary, personnel can use inverted U-shaped nails to position the sleeve 121 on the ground to achieve stable contact with the ground and maintain the stability of the whole device.
[0030] As shown in Figure 1 , Figure 2 and Figure 3 , the support 11 includes two support plates 111, and the two support plates 111 are hinged with a folding plate 112 between the top of the opposite sides. The side view of the support plate 111 is in the shape of a trapezoid, and the support plate 111 is placed obliquely.
[0031] In specific use, first, the two support plates 111 are unfolded and placed on the ground. At this time, the support plate 111 and the folding plate 112 are in the shape of M. Since the side view of the support plate 111 is in the shape of a trapezoid, the stability of the whole vertical placement device 1 can be maintained.
[0032] As shown in Figure 1 , Figure 2 and Figure 4 , the support 12 includes a horizontal screw rod 122 and a vertical screw rod 126 arranged between the two support plates 111. The support 12 further includes a sleeve 121 threadedly connected to the surface of the horizontal screw rod 122. The surface of the sleeve 121 is provided with a connecting rod 124, which is designed longitudinally. The surface of the connecting rod 124 is provided with a vertical pipe 125, and the inner wall of the vertical pipe 125 is threadedly connected with the vertical screw rod 126. The upper end of the vertical screw rod 126 is provided with an abutting plate 127 through a bearing seat, and the upper part of the abutting plate 127 is in contact with the folding plate 112. The support 12 further includes a connecting sleeve 123 threadedly connected to the horizontal screw rod 122 near the side of the support plate 111. The surface of the connecting sleeve 123 is fixedly connected with the support plate 111 through a hinged seat.
[0033] Then, the support 12 is placed between the two support plates 111, and the horizontal screw rod 122 is screwed out of the sleeve 121 so that it extends into the connecting sleeve 123. Continue to screw the horizontal screw rod 122, which will continuously move out of the sleeve 121, and at the same time, the other end of the horizontal screw rod 122 will gradually screw into the connecting sleeve 123. Until the four horizontal screw rods 122 between the two support plates 111 are connected with the four connecting sleeves 123, the whole horizontal support of the vertical placement device 1 is completed.
[0034] Then, the staff can adjust the distance between the two screw rods by screwing the sleeve 121 forward or backward to determine the inclination angle of the support plate 111.
[0035] It should be noted that the end of the connecting rod 124 close to the sleeve 121 is provided with a movable sleeve, which is sleeved on the surface of the sleeve 121, so it does not affect the personnel to rotate the sleeve 121;
[0036] After debugging is completed, the staff twists the vertical screw rod 126 in the vertical pipe 125, at this time the vertical screw rod 126 will move out from the inside of the vertical pipe 125 upwards, until the abutting plate 127 at the upper end of the vertical screw rod 126 contacts the lower part of the folding plate 112, the V-shaped folding plate 112 is abutted to the letter-shaped, at this time the overall structure is completed;
[0037] As shown in Figure 1 and Figure 5 The plug-in part 13 includes the placement shell 131 arranged on the surface of the support plate 111, the placement shell 131 is arranged in a rectangular array and has a plurality of groups, and the two groups of placement shells 131 are arranged in an interlaced manner; the inner lower part of the placement shell 131 is provided with the protective pad 132, and the material of the protective pad 132 is sponge;
[0038] Finally, the staff can insert a plurality of drill rods into a plurality of placement shells 131 in sequence, because the two groups of placement shells 131 on the surface of the two support plates 111, the number of the placement shells arranged on one side is double, and the number of the placement shells arranged on the other side is base, so the two groups of placement shells 131 are designed in an interlaced manner, at this time the drill rods inserted into the placement shells 131 are arranged in an inclined and poor manner, not only can the inclined design angle be used to support the drill rod when it is lifted by the lifting equipment in the subsequent use, keep the stability of the ascending movement of the drill rod, and reduce the pressure borne by the lower end of the drill rod when it ascends, but also the plurality of arranged drill rods can facilitate the staff to find and select;
[0039] Working principle: in specific use, first, the staff will support 12 between two support plate 111, then the horizontal screw 122 from the sleeve 121 out, so that its extension to the connecting sleeve 123, then continue to twist the horizontal screw 122, the horizontal screw 122 will be constantly removed from the sleeve 121, at the same time, the other end of the horizontal screw 122 will also be gradually screwed into the connecting sleeve 123, until the four horizontal screw 122 between the two support plate 111 and four connecting sleeve 123 connection is completed, the staff can adjust the sleeve 121 to adjust the inclination angle of support plate 111, after the adjustment is completed, the staff will be vertical screw 126 in the vertical pipe 125, at this time the vertical screw 126 will be removed from the inside of the vertical pipe 125, until the abutting plate 127 on the upper end of the vertical screw 126 and the lower part of the folding plate 112 contact, the V-shaped folding plate 112 is abutted to the letter type, at this time the overall structure is built, then the staff can insert multiple drill pipe into multiple placement shell 131, because the two support plate 111 surface of the two groups of placement shell 131, one side of the number is double, the other side is the base, so the two groups of placement shell 131 will be staggered design, at this time the drill pipe inserted into the placement shell 131 will be inclined and poor arrangement, not only in the subsequent use of lifting equipment will be lifted when the drill pipe using the angle of inclination design can be supported when the drill pipe rises, keep the drill pipe rising movement stable, reduce the pressure on the lower end of the drill pipe when rising, but also multiple arrangement of the drill pipe can facilitate personnel search and selection.
[0040] Furthermore, it should be understood that although the present specification is described in terms of embodiments, not every embodiment contains only one independent technical solution, and the description of the specification is only for the sake of clarity, and those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can be combined appropriately to form other embodiments that those skilled in the art can understand.
Claims
1. A surveying device for a drill rod, characterized in that, Include: Vertical device (1); The vertical device (1) is mainly composed of a supporting piece (11), a supporting piece (12) arranged in the supporting piece (11), and a plug-in piece (13) arranged on the surface of the supporting piece (11). The supporting piece (11) comprises two support plates (111), and a folding plate (112) is hinged between the top of the opposite side of the two support plates (111). The supporting piece (12) comprises a horizontal screw rod (122) and a vertical screw rod (126) arranged between the two support plates (111).
2. A surveying drill rod storage apparatus as claimed in claim 1, wherein: The supporting piece (12) further comprises a sleeve (121) threadedly connected to the surface of the horizontal screw rod (122), the surface of the sleeve (121) is provided with a connecting rod (124), and the connecting rod (124) is designed longitudinally.
3. A surveying drill rod storage apparatus as claimed in claim 2, wherein: The surface of the connecting rod (124) is provided with a vertical pipe (125), the inner wall of the vertical pipe (125) is threadedly connected with the vertical screw rod (126), the upper end of the vertical screw rod (126) is provided with an abutting plate (127) through a bearing seat, and the upper part of the abutting plate (127) is in contact with the folding plate (112).
4. The surveying drill rod storage apparatus of claim 1, wherein: The supporting piece (12) further comprises a connecting sleeve (123) threadedly connected to the horizontal screw rod (122) near the side of the support plate (111), and the surface of the connecting sleeve (123) is fixedly connected with the support plate (111) through a hinged seat.
5. The surveying drill rod storage apparatus of claim 1, wherein: The side view of the support plate (111) is designed as a trapezoidal shape, and the support plate (111) is placed obliquely.
6. A surveying drill rod storage apparatus as defined in claim 1 wherein: The plug-in piece (13) comprises a placing shell (131) arranged on the surface of the support plate (111), and a plurality of placing shells (131) are arranged in a rectangular array, and two groups of placing shells (131) are arranged alternately.
7. A surveying drill rod storage device as claimed in claim 6, wherein: The inner lower part of the placing shell (131) is provided with a protection pad (132), and the material of the protection pad (132) is sponge.