Multi-beam rapid installation device assisted by electric hoist

By using an electric hoist-assisted multibeam rapid installation device, which utilizes the crane's wire rope and limit components, the accuracy and safety issues in the multibeam installation process are resolved, achieving an efficient and stable installation process.

CN224061139UActive Publication Date: 2026-03-31CCCC GUANGZHOU DREDGING CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-26
Publication Date
2026-03-31

AI Technical Summary

Technical Problem

Traditional multi-beam installation methods suffer from problems such as difficulty in ensuring installation accuracy, significant safety hazards, and inconvenience.

Method used

The multi-beam rapid installation device, assisted by an electric hoist, uses a combination of crane wire rope, U-shaped buckle and U-shaped lifting point, along with an electric hoist and limit assembly, to achieve precise movement and fixation of the depth measuring rod.

Benefits of technology

It improves the accuracy and stability of installation, avoids the safety hazards of traditional handling processes, and enhances the convenience and speed of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224061139U_ABST
    Figure CN224061139U_ABST
Patent Text Reader

Abstract

The utility model provides a multi-beam rapid installation device assisted by an electric hoist, which belongs to the field of ocean exploration and comprises a base, a stand column is arranged in the middle of the top of the base, and an installation seat is arranged at the top of the stand column. The bottom end of a crane steel wire rope is woven into a ring through a first U-shaped buckle, the ring is internally matched with a second U-shaped buckle to be connected with a U-shaped lifting point at the top of a sounding rod in a staggered mode, an electric hoist body on an installation base drives the crane steel wire rope to move, and the crane steel wire rope is matched with the first U-shaped buckle, the second U-shaped buckle and the U-shaped lifting point to drive the sounding rod to move. At the moment, an operator pulls the traction steel wire ropes on the two sides of the mounting ring, so that the direction of the sounding rod is controlled, and hidden dangers and inconvenience caused by the traditional carrying and mounting process are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field of ocean exploration, concretely to a multi-beam quick installation device assisted by electric hoist. BACKGROUND

[0002] Multi-beam equipment is widely used in the fields of ocean surveying and mapping, underwater exploration, etc. The traditional multi-beam installation method usually adopts the way of crane or manual carrying. Through the search of the application number CN202223038885.3, a multi-beam sounding system installation device is disclosed, which comprises a flange rod, an antenna fixing structure and an installation assembly. The antenna fixing structure is connected with the top of the flange rod. A positioning directional antenna is connected with the antenna fixing structure. A multi-beam probe is connected with the bottom of the flange rod. A support structure is arranged at the lower part of the flange rod. The installation assembly is connected with the ship body. The upper part of the installation assembly is connected with a limiting piece, and the lower part of the installation assembly is provided with a limiting part. The limiting piece is sleeved on the upper part of the flange rod. The limiting part is supported below the support structure. The stable connection of the flange rod, the antenna fixing structure and the installation assembly enables the multi-beam probe and the positioning directional antenna to be installed on a set of installation device, forming a whole. The position and angle relationship between the devices do not change in the use process, thereby achieving the purpose of carrying the multi-beam sounding system on the easily deformed ship body structure. However, the above description still has the following defects in actual use: it is difficult for manual operation to ensure the installation accuracy during the installation of the multi-beam, and there are safety hazards in the carrying process. Therefore, it is necessary to design a multi-beam quick installation device assisted by electric hoist with high practicality. CONTENT OF THE UTILITY MODEL

[0003] The utility model aims at providing a multi-beam quick installation device assisted by electric hoist to solve the problems in the background art.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a multi-beam quick installation device assisted by electric hoist, comprising: a base, a stand is arranged at the middle part of the top of the base, and a mounting seat is arranged at the top of the stand;

[0005] A hoisting assembly is arranged on one side surface of the mounting seat. The hoisting assembly comprises an electric hoist body. An inside of the electric hoist body extends out a crane steel wire rope. The bottom end of the crane steel wire rope is woven into a ring and fixed by a first U-shaped buckle. A second U-shaped buckle is arranged in the ring at the bottom end of the crane steel wire rope.

[0006] A depth sounding rod is arranged at the bottom of the crane steel wire rope. A U-shaped lifting point is fixed by welding at the edge of the top of the depth sounding rod. The surface of the U-shaped lifting point is cross-connectable with the second U-shaped buckle. A probe is arranged at the bottom of the depth sounding rod. A protective cover is sleeved on the surface of the probe. A support ring is arranged on the surface of the top end of the depth sounding rod.

[0007] The limiting assembly includes two sets of buckles that engage with the surface of the sounding rod. One end of each set of buckles is provided with a connecting block. The two sets of connecting blocks are connected by two stainless steel screws. The other end of each set of buckles is sleeved on the surface of two sets of connecting shafts. The two sets of connecting shafts are set on the inner wall of two slots opened on the end face of two fixing blocks. The other end of the two fixing blocks is welded and fixed to the measuring vessel. The top of the buckle can abut against the bottom of the support ring.

[0008] As a preferred embodiment of this utility model: the bottom end of the sounding rod is provided with a mounting ring, and the middle of both sides of the mounting ring is provided with a traction steel wire rope. The other ends of the two traction steel wire ropes are fixed to the port side of the measuring vessel by a tension buckle. The bottom of the mounting ring abuts against the side of the top of the probe.

[0009] As a preferred embodiment of this utility model, the inner wall of the depth measuring rod is provided with a plurality of probe data power lines.

[0010] As a preferred embodiment of this utility model: a snap-fit ​​sleeve is provided on one side of the bottom of the mounting base, the inner wall of the snap-fit ​​sleeve is snapped into connection with the top of the column, and insertion holes are provided on both sides of the snap-fit ​​sleeve. The inner walls of the two insertion holes are threadedly connected to the grooves provided on both sides of the top of the column by means of pins.

[0011] As a preferred embodiment of this utility model, the four corners of the top of the base are all connected to the surveying vessel structure by fixing bolts.

[0012] As a preferred embodiment of this utility model, adjustable counterweights are provided on both sides of the top of the base.

[0013] As a preferred embodiment of this utility model, reinforcing diagonal braces are provided on the inner walls of the top and bottom of the mounting base.

[0014] Compared with the prior art, the beneficial effects of this utility model are:

[0015] (1) The bottom end of the crane wire rope is woven into a ring by the first U-shaped buckle. The ring is connected to the U-shaped lifting point at the top of the depth measuring rod by the second U-shaped buckle. The electric hoist body on the mounting base drives the crane wire rope to move. The crane wire rope, together with the first U-shaped buckle, the second U-shaped buckle and the U-shaped lifting point, drives the depth measuring rod to move. At this time, the operator pulls the traction wire ropes on both sides of the mounting ring to control the direction of the depth measuring rod, thereby avoiding the hidden dangers and inconveniences caused by the traditional handling and installation process.

[0016] (2) through the depth pole hoist and lift hanging in to the left side of the measuring boat, aligning the depth pole installation position down, until the bottom of the bracket ring and the fixed block above abuts, the surface of the depth pole and the inner wall of the two sets of buckles are inserted and buckled, the two sets of buckles rotate on the surface of the connecting shaft of the two sets of notch inner walls, cooperate with the two sets of connecting blocks to preliminarily buckle the depth pole, then cooperate with the two sets of stainless steel screws to fix it, complete the installation and limiting of the depth pole, and the two traction steel wire ropes cooperate with the front and rear position of the loose buckle fixed on the left side of the measuring boat, so that the probe is prevented from shaking after installation, and the stability of installation is improved. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 It is a structure schematic view of the utility model;

[0018] Figure 2 It is a part structure schematic view of the utility model;

[0019] Figure 3 It is a hoist assembly structure schematic view of the utility model;

[0020] Figure 4 It is a limiting assembly structure schematic view of the utility model.

[0021] In the drawing: 1, base; 11, stand; 12, mounting seat; 13, clamping sleeve; 14, jack; 15, bolt; 16, hole groove; 17, fixed bolt; 18, adjustable counterweight block; 19, reinforcing diagonal; 2, hoist assembly; 21, electric hoist body; 22, crane steel wire rope; 23, first U-shaped buckle; 24, second U-shaped buckle; 3, depth pole; 31, U-shaped lifting point; 32, probe; 33, protective cover; 34, bracket ring; 35, traction steel wire rope; 36, loose buckle; 37, probe data power line; 4, limiting assembly; 41, buckle; 42, connecting block; 43, stainless steel screw; 44, connecting shaft; 45, fixed block; 46, notch. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be described clearly and completely in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0023] Please refer to Figures 1-4The utility model provides a kind of multi-beam fast installation device using electric hoist auxiliary, comprising: base 1, the middle part of the top of base 1 is equipped with stand 11, and the top of stand 11 is provided with mounting seat 12;

[0024] Please refer to Figure 3 Lifting assembly 2, lifting assembly 2 includes the electric hoist body 21 welded with the side surface of mounting seat 12, the inside of electric hoist body 21 extends crane wire rope 22, the bottom end of crane wire rope 22 is woven into ring, and is fixed by first U-shaped buckle 23, and the ring in the bottom end of crane wire rope 22 is provided with second U-shaped buckle 24;

[0025] Depth rod 3, the side of the top of depth rod 3 is welded and fixed with U-shaped lifting point 31, the surface of U-shaped lifting point 31 can be staggered with second U-shaped buckle 24 Connection, the bottom of depth rod 3 is equipped with probe 32, the surface of probe 32 is equipped with protective cover 33, and the surface of the top of depth rod 3 is equipped with bracket ring 34.

[0026] Specific use: first U-shaped buckle 23 is engaged and limited to the structure that the bottom end of crane wire rope 22 is woven into ring, and the ring is connected with the U-shaped lifting point 31 of the top of depth rod 3 in the cooperation of second U-shaped buckle 24, and the electric hoist body 21 on mounting seat 12 drives crane wire rope 22 to move, and crane wire rope 22 cooperates with first U-shaped buckle 23, second U-shaped buckle 24 and U-shaped lifting point 31 to drive depth rod 3 to move, when operator pulls the traction wire rope 35 on both sides of installation ring, the direction of depth rod 3 is controlled, the hidden danger and inconvenience brought by traditional carrying installation process are avoided, and the quick convenience of installation is improved.

[0027] Please refer to Figure 4 Limiting assembly 4, limiting assembly 4 includes two groups of buckles 41 connected with the surface of depth rod 3, one end of two groups of buckles 41 is equipped with connecting block 42, two groups of connecting block 42 are connected by two stainless steel screws 43 between threaded, the other end of two groups of buckles 41 is sleeved on the surface of two groups of connecting shafts 44, two groups of connecting shafts 44 are arranged in the inner wall of two grooves 46 that are set in the end face of two fixed blocks 45, the other end of two fixed blocks 45 is welded and fixed with surveying ship, and the top of buckle 41 can be abutted with the bottom of bracket ring 34.

[0028] Specific use: the depth pole 3 is lifted and suspended in the left side of the measuring ship, and is lowered until the bottom of the support ring 34 and the fixed block 45 above abut, the surface of the depth pole 3 is inserted and engaged with the inner wall of the two sets of buckles 41, the two sets of buckles 41 rotate on the surface of the connecting shaft 44 of the inner wall of the two sets of notches 46, and the two sets of connecting blocks 42 cooperate to preliminarily engage the depth pole 3, and then cooperate with the two sets of stainless steel screws 43 to fix the depth pole 3, complete the installation and limiting of the depth pole 3, and the two traction steel wires 35 cooperate with the elastic buckles 36 at both ends to be fixed at the front and rear positions of the left side of the measuring ship, so that the probe 32 is prevented from shaking after installation, and the stability of installation is improved.

[0029] Please refer to Figure 4 , the surface of the bottom end of the depth pole 3 is provided with a mounting ring, the middle of the two sides of the mounting ring is provided with a traction steel wire 35, the other end of the two traction steel wires 35 is fixed in the front and rear positions of the left side of the measuring ship through the elastic buckle 36, and the bottom of the mounting ring abuts against the side of the top of the probe 32.

[0030] Specific use: the electric hoist body 21 cooperates with the crane steel wire 22, the first U-shaped buckle 23, the second U-shaped buckle 24 and the U-shaped lifting point 31 to drive the depth pole 3 to move, the operator pulls the traction steel wires 35 on both sides of the mounting ring to control the direction of the depth pole 3, and the two traction steel wires 35 cooperate with the elastic buckles 36 at both ends to be fixed at the front and rear positions of the left side of the measuring ship, so that the probe 32 is prevented from shaking after installation.

[0031] Please refer to Figure 4 , the inner wall of the depth pole 3 is provided with a plurality of probe data power lines 37.

[0032] Specific use: the plurality of probe data power lines 37 on the inner wall of the depth pole 3 facilitate the transmission of the data detected by the probe 32 to the receiving equipment of the measuring ship.

[0033] Please refer to Figure 2 , one side of the bottom of the mounting seat 12 is provided with a clamping sleeve 13, the inner wall of the clamping sleeve 13 is connected with the top end of the stand 11, both sides of the clamping sleeve 13 are provided with insertion holes 14, and the inner walls of the two insertion holes 14 are screwed and connected with the hole grooves 16 provided in the top ends of the two sides of the stand 11 through the insertion pins 15.

[0034] Specific use: the inner wall of the clamping sleeve 13 is clamped with the top end of the stand 11, so that the mounting seat 12 and the stand 11 are preliminarily fixed, and the two insertion pins 15 are inserted into the two insertion holes 14 and the hole grooves 16, so that the mounting seat 12 and the stand 11 are conveniently installed and disassembled.

[0035] Please refer to Figure 2 , the four corners of the top of the base 1 are connected with the structure of the measuring ship through the fixed bolts 17.

[0036] The base 1 top of both sides are provided with adjustable counterweight 18.

[0037] Specific use: base 1 top of four corners with fixed bolts 17 facilitate and measuring the structure of the ship installation and disassembly, while the base 1 top of both sides of the adjustable counterweight 18 facilitate the increase of electric hoist body 21 installation and use of stability.

[0038] Please refer to Figure 2 , the mounting seat 12 top and bottom of the inner wall are provided with reinforcing inclined rod 19.

[0039] Specific use: mounting seat 12 top and bottom of the inner wall of two reinforcing inclined rod 19 facilitate further increase and decrease the stability of the structure during hoisting, to avoid damage to the structure to cause security risks.

[0040] In use, the first U-shaped buckle 23 on the bottom end of the ring structure of the steel wire rope 22 weaving carding, ring with the second U-shaped buckle 24 and depth probe 3 top U-shaped lifting point 31 staggered connection, the electric hoist body 21 on the mounting seat 12 drive the crane steel wire rope 22 to move, the crane steel wire rope 22 with the first U-shaped buckle 23, the second U-shaped buckle 24 and U-shaped lifting point 31 drive depth probe 3 move, at this time the operator pulls the installation ring both sides of the traction steel wire rope 35, the direction of the depth probe 3 control, depth probe 3 hoist and lift suspension to the left side of the measuring ship, align the installation position of depth probe 3 down, until the bottom of the bracket ring 34 and the fixed block 45 abut, the surface of the depth probe 3 and the inner wall of the two groups of buckle 41 are inserted and buckled, and then the two groups of stainless steel screws 43 are fixed, the installation of the depth probe 3 is completed, and the two traction steel wire ropes 35 are fixed at the front and rear positions of the left side of the measuring ship respectively, to prevent the probe 32 from shaking after installation.

[0041] The contents not described in detail in the description belong to the prior art known to those skilled in the art, although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the utility model shall be included in the protection scope of the utility model.

Claims

1. A multi-beam quick-mounting device assisted by an electric hoist, characterized in that, Include: Base (1), the middle part of the top of the base (1) is provided with a stand (11), and the top of the stand (11) is provided with a mounting seat (12); Hoisting assembly (2), the hoisting assembly (2) includes a side surface of the mounting seat (12) welded with an electric hoist body (21), a crane wire rope (22) extends out of the inside of the electric hoist body (21), the bottom end of the crane wire rope (22) is woven into a ring, and is fixed through a first U-shaped buckle (23), a second U-shaped buckle (24) is arranged in the ring of the bottom end of the crane wire rope (22); The depth probe (3) is welded and fixed with a U-shaped lifting point (31) on the side of the top of the depth probe (3), the surface of the U-shaped lifting point (31) can be staggered with the second U-shaped buckle (24), the bottom of the depth probe (3) is provided with a probe (32), the surface of the probe (32) is provided with a protective cover (33), and the surface of the top end of the depth probe (3) is provided with a support ring (34); The limiting assembly (4) includes two groups of buckles (41) clamped and connected with the surface of the depth probe (3), one end of the two groups of buckles (41) is provided with a connecting block (42), the two groups of connecting blocks (42) are screw connected through two stainless steel screws (43), the other end of the two groups of buckles (41) is sleeved on the surface of two connecting shafts (44), the two groups of connecting shafts (44) are arranged in the inner wall of two notches (46) formed in the end face of two fixed blocks (45), the other end of the two fixed blocks (45) is welded and fixed with the surveying ship, and the top of the buckle (41) can abut against the bottom of the support ring (34).

2. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: The surface of the bottom end of the depth probe (3) is provided with a mounting ring, the middle part of the two sides of the mounting ring is provided with a traction wire rope (35), the other end of the two traction wire ropes (35) is fixed in the left side of the surveying ship through a loose buckle (36), and the bottom of the mounting ring abuts against the side of the top of the probe (32).

3. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: The inner wall of the depth probe (3) is provided with a plurality of probe data power lines (37).

4. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: One side of the bottom of the mounting seat (12) is provided with a clamping sleeve (13), the inner wall of the clamping sleeve (13) is clamped and connected with the top end of the stand (11), both sides of the clamping sleeve (13) are provided with a jack (14), and the inner wall of the two jacks (14) is screw connected with the hole groove (16) formed in the top end of the stand (11) through a jack (15).

5. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: The top of the base (1) is connected with the structure of the surveying ship through a fixing bolt (17).

6. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: The two sides of the top of the base (1) are provided with adjustable counterweights (18).

7. A multi-beam quick-mounting device assisted by an electric hoist according to claim 1, characterized in that: The inner walls of the top and bottom of the mounting seat (12) are provided with reinforcing inclined rods (19).

Citation Information

Patent Citations

  • Multi-beam sounding system installation device

    CN218751253U