Noise reduction type building construction platform

By installing protective nets, railings, anti-slip mats, tool racks, cabinets, and safety ropes on the construction platform, and adding sound insulation panels to the railings, the safety issues and noise impact on the construction platform were resolved, achieving the effects of worker safety protection and noise reduction.

CN224134176UActive Publication Date: 2026-04-17JIANGXI JINMEI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
JIANGXI JINMEI CONSTR ENG CO LTD
Filing Date
2025-01-15
Publication Date
2026-04-17

AI Technical Summary

Technical Problem

Existing construction platforms pose safety risks such as falls, tool drops, and personnel falls, as well as the impact of noise generated during construction on other personnel and surrounding residents.

Method used

Protective netting, guardrails, anti-slip mats, tool racks, cabinets, and safety ropes are installed on the construction platform. Sound insulation panels are added to the guardrails. The deployment and retraction of the protective netting are controlled by a rope winder and steel wire rope. The platform is raised and lowered using a hydraulic cylinder. The anti-slip mats and tool racks enhance safety, while the sound insulation panels reduce noise.

Benefits of technology

It effectively prevents workers from slipping, tools from falling, and people from falling, reduces the impact of construction noise on the surrounding environment, and improves construction safety and noise reduction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224134176U_ABST
    Figure CN224134176U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building equipment, in particular to a noise reduction type building construction platform, and adopts the technical scheme that the noise reduction type building construction platform comprises a base, a shear fork mechanism, a platform main body, a guardrail, a sound insulation plate, a first protective net, a second protective net, a safety rope, a tool rack and a vertical cabinet, a non-slip mat is arranged in the platform body, a tool rack and a vertical cabinet are fixedly connected to the edge of the inner wall of the platform body, the tool rack is located on the left side of the vertical cabinet, a safety rope is installed on a rope rod, a guardrail is fixedly connected to the upper end of the platform body, and sound insulation plates are installed at the right end and the rear end of the guardrail. The tool rack can store tools to prevent the tools from rolling down or stumbling workers, the safety rope and the safety net can prevent the workers from falling down, the construction safety of the workers is improved, and the influence of noise on the workers is reduced through the installed sound insulation plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of building equipment, specifically relating to the field of building construction platforms. Background Technology

[0002] Construction platforms are structural facilities used in construction to provide workers with a safe and stable working space. They are typically used to support personnel, tools, and materials, especially in high-altitude or hard-to-reach locations.

[0003] Existing construction platforms are usually constructed from steel frames and metal platforms, which can provide a stable working environment for construction workers. However, during construction, there may be safety issues such as falls, tools falling, or even people falling. In addition, the noise generated during construction can easily affect other people on the construction site and surrounding residents.

[0004] Therefore, in response to the potential problems of falls, tool drops, and personnel falls, as well as significant noise generation during construction, the aforementioned construction platform was developed to address these issues. By installing anti-slip mats, tool racks, cabinets, safety ropes, and protective nets on the platform, falls, tool drops, and personnel falls can be effectively prevented. Furthermore, soundproofing panels installed on the railings can reduce the impact of noise on other construction workers and surrounding residents. Utility Model Content

[0005] To overcome the safety issues that may arise when working on the construction platform, such as falls, falling tools, or even falling personnel, and the problem that the noise generated during construction may affect other people on the construction site and surrounding residents.

[0006] The technical solution of this utility model is as follows: a noise-reducing construction platform, including a base, a scissor mechanism, a platform body, and guardrails, as well as a sound insulation board, a first protective net, a second protective net, a safety rope, a tool rack, and a cabinet. An anti-slip pad is provided on the lower inner wall of the platform body. A tool rack and a cabinet are fixedly connected to the inner edge of the platform body, with the tool rack located on the left side of the cabinet. Rope poles are fixedly connected to the inner edges of the front and rear ends of the platform body, and safety ropes are installed on the rope poles. A hinge is located at the left edge of the platform body. The platform is equipped with a first protective net and a second protective net hinged to the front edge of the main body. A guardrail is fixed to the upper part of the main body. Sound insulation panels are installed on the right end and the inner wall of the rear end of the guardrail. Two rope winders are installed at the edges of the left end inner wall and the front end inner wall of the guardrail. A first steel wire rope is installed on the rope winder at the left end of the guardrail, and a second steel wire rope is installed on the rope winder at the front end of the guardrail. The lower end of the first steel wire rope is installed on the upper end of the first protective net, and the lower end of the second steel wire rope is installed on the upper end of the second protective net.

[0007] Preferably, the length of the first wire rope is only sufficient for the first protective net to flip perpendicular to the left end of the platform body, and the length of the second wire rope is only sufficient for the second protective net to flip perpendicular to the front end of the platform body.

[0008] Preferably, the safety rope is a double-hook buffer safety belt rope, and the edge of the anti-slip mat fits snugly against the tool rack and cabinet.

[0009] Preferably, a locking block is fixed to the left edge of the sound insulation panel, and a locking groove is opened on the inner wall of the rear end of the guardrail, with the locking block and the locking groove being compatible.

[0010] Preferably, a scissor lift mechanism is installed at the lower end of the platform body, and a hydraulic cylinder is installed inside the scissor lift mechanism.

[0011] Preferably, the lower end of the scissor lift mechanism is fixedly connected to a base, and a ladder is fixedly connected to the right edge of the base.

[0012] Preferably, wheels are symmetrically distributed on both the front and rear ends of the base, and centrally symmetrical support plates are installed on both the front and rear ends and the left and right ends of the base.

[0013] The beneficial effects of this utility model are:

[0014] 1. By installing a safety net on the main platform and a rope winder and steel wire rope on the guardrail, the rotation of the rope winder can tighten or loosen the steel wire rope. The tightening or loosening of the steel wire rope can drive the safety net to be retracted or unfolded. The length of the unslack steel wire rope can control the unfolding angle of the safety net. The safety net flipped to a vertical angle can maximize the fall protection for workers and tools on the main platform. Compared with the existing construction platform structure, the added safety net can protect construction workers and tools and equipment on the main construction platform from fall.

[0015] 2. By installing anti-slip mats, tool racks, cabinets, and safety ropes inside the platform body, the anti-slip mats can reduce workers' slipping, the tool racks and cabinets can store tools to prevent them from rolling off or tripping workers, and the safety ropes can prevent workers from falling. Compared with the existing construction platform structure, the added anti-slip mats, tool racks, cabinets, and safety ropes can further improve the safety of workers during construction.

[0016] 3. By installing soundproof panels on the guardrails, the noise generated during construction can be reduced. The soundproof panels are installed using clips, making them easy to disassemble and clean after long-term use, thus restoring their noise reduction effect. Compared with the existing construction platform structure, the added soundproof panels can effectively reduce noise and minimize its impact on other workers and surrounding residents. Attached Figure Description

[0017] Figure 1 The diagram shown is a three-dimensional structural schematic of the noise-reducing construction platform of this utility model.

[0018] Figure 2 The diagram shown is a three-dimensional structural breakdown of the noise-reducing construction platform of this utility model.

[0019] Figure 3 The diagram shown is a three-dimensional structural breakdown of the guardrail of the noise-reducing construction platform of this utility model.

[0020] Figure 4 The diagram shown is a three-dimensional structural breakdown of the main body of the noise-reducing construction platform of this utility model.

[0021] Figure 5 The diagram shown is a three-dimensional structural breakdown of the noise-reducing construction platform guardrail and the main body of the platform according to this utility model.

[0022] Figure 6 The diagram shown is a three-dimensional structural breakdown of the noise-reducing scissor lift mechanism of the construction platform of this utility model.

[0023] Figure 7 The diagram shown is a three-dimensional structural breakdown of the noise-reducing construction platform base of this utility model.

[0024] Explanation of reference numerals in the attached drawings: 1-base, 2-scissor mechanism, 3-platform body, 4-guardrail, 5-soundproof board, 6-first wire rope, 7-second wire rope, 8-first protective net, 9-second protective net, 10-rope pole, 11-safety rope, 12-anti-slip mat, 13-tool rack, 14-cabinet, 15-block, 16-slot, 17-rope winder, 18-hydraulic cylinder, 19-support plate, 20-ladder. Detailed Implementation

[0025] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0026] Please see Figures 1-7This utility model provides an embodiment of a noise-reducing construction platform, including a base 1, a scissor mechanism 2, a platform body 3, and a guardrail 4. It also includes a sound insulation board 5, a first protective net 8, a second protective net 9, a safety rope 11, a tool rack 13, and a cabinet 14. An anti-slip pad 12 is provided on the lower inner wall of the platform body 3. The tool rack 13 and the cabinet 14 are fixedly connected to the inner edge of the platform body 3, with the tool rack 13 located to the left of the cabinet 14. Rope rods 10 are fixedly connected to the inner edges of the front and rear ends of the platform body 3. A safety rope 11 is installed. A first protective net 8 is hinged to the left edge of the platform body 3, and a second protective net 9 is hinged to the front edge of the platform body 3. A guardrail 4 is fixed to the upper end of the platform body 3. Sound insulation panels 5 are installed on the inner walls of the right and rear ends of the guardrail 4. Two rope winders 17 are installed at the edges of the inner walls of the left and front ends of the guardrail 4. A first steel wire rope 6 is installed on the rope winder 17 at the left end of the guardrail 4, and a second steel wire rope 7 is installed on the rope winder 17 at the front end of the guardrail 4. The lower end of the first steel wire rope 6 is installed on the first protective net 9. The upper end of the protective net 8 and the lower end of the second steel wire rope 7 are installed on the upper end of the second protective net 9. The first steel wire rope 6 and the second steel wire rope 7 can be tightened or loosened by rotating the two sets of rope winders 17. Tightening or loosening the first steel wire rope 6 can cause the first protective net 8 to retract or expand, and tightening or loosening the second steel wire rope 7 can cause the second protective net 9 to retract or expand. The first steel wire rope 6 and the second steel wire rope 7 can control the expansion angle of the first protective net 8 and the second protective net 9. The first protective net 8 and the second protective net 9 can be flipped to a vertical angle... The safety net 9 can provide maximum fall protection for workers and tools on the platform body 3. The anti-slip mats 12 can prevent workers from slipping during operation. The fixed tool racks 13 and cabinets 14 can store tools and effectively prevent tools from falling and tripping workers. The high-altitude operation safety mechanism composed of rope poles 10 and safety ropes 11 can further prevent workers from falling. The sound insulation panels 5 installed at the rear and right ends of the guardrail 4 can effectively reduce noise and reduce the impact of noise on other workers and surrounding residents.

[0027] Please see Figures 3-5 In this embodiment, the length of the first wire rope 6 is only sufficient for the first protective net 8 to flip perpendicular to the left end of the platform body 3, and the length of the second wire rope 7 is only sufficient for the second protective net 9 to flip perpendicular to the front end of the platform body 3. In use, the lengths of the first wire rope 6 and the second wire rope 7 can limit the maximum unfolding angle of the first protective net 8 and the second protective net 9. The safety rope 11 is a double-hook buffer safety belt rope, and the edge of the anti-slip mat 12 is attached to the perimeter of the tool rack 13 and the cabinet 14. In use, the double hooks of the safety rope 11 can be used with a vest-style safety belt to prevent workers from falling. The anti-slip mat 12 attached to the perimeter of the tool rack 13 and the cabinet 14 can be easily installed.

[0028] Please see Figure 3 In this embodiment, a locking block 15 is fixed to the left edge of the sound insulation panel 5, and a locking groove 16 is provided on the inner wall of the rear end of the guardrail 4. The locking block 15 is adapted to the locking groove 16. In use, the locking groove 16 can fix the sound insulation panel 5 installed at the rear end of the guardrail 4, thereby improving the convenience of disassembling the sound insulation panel 5.

[0029] Please see Figures 2-7 In this embodiment, a scissor lift mechanism 2 is installed at the lower end of the platform body 3. A hydraulic cylinder 18 is installed inside the scissor lift mechanism 2. During use, the opening and closing of the scissor lift frame on the scissor lift mechanism 2 can be controlled through the output end of the hydraulic cylinder 18, thereby driving the platform body 3 to rise and fall. A base 1 is fixedly connected to the lower end of the scissor lift mechanism 2. A ladder 20 is fixedly connected to the right edge of the base 1. During use, the base 1 can support the scissor lift mechanism 2, and the ladder 20 can facilitate workers to climb onto the platform body 3. Wheels are symmetrically distributed on both the front and rear ends of the base 1. Centrally symmetrical support plates 19 are installed on the front and rear ends and the left and right ends of the base 1. During use, the base 1 can be moved easily through the wheels, and the position of the base 1 can be fixed through the support plates 19.

[0030] Before starting work, first move the base 1 to the working position using the wheels, then fix the position of the base 1 using the support plate 19. Next, climb up the platform body 3 using the ladder 20 and enter the interior of the platform body 3 from the top of the guardrail 4. Pick up the safety rope 11 on the rope bar 10 and connect the hook of the safety rope 11 to the safety vest you are wearing. Then start the hydraulic cylinder 18, which drives the scissor frame of the scissor mechanism 2 to rotate, causing the scissor mechanism 2 to extend. The extension of the scissor mechanism 2 raises the platform body 3 supported by the upper end. After the platform body 3 is raised to the working surface, rotate the rope winder 17 at the front and left ends of the platform body 3 to loosen the first wire rope 6 and the second wire rope 7, so that the first protective net 8 and the second protective net 9 can be unfolded. Finally, take out the tools from the cabinet 14.

[0031] When working, tools that are not in use can be placed on the tool rack 13. After long-term use, the card block 15 can be removed from the card slot 16. The sound insulation board 5 on the inner wall of the rear end and the inner wall of the right end of the detachable guardrail 4 can be removed. Then, the anti-slip pad 12 on the inner wall of the lower end of the platform body 3 can be removed, cleaned and then put back.

[0032] Through the above steps, the anti-slip mat 12 can prevent workers from slipping during operation, the tool rack 13 and cabinet 14 can store tools, effectively preventing tools from falling and tripping workers, the high-altitude operation safety mechanism composed of rope pole 10 and safety rope 11 can prevent workers from falling, the unfolded first protective net 8 and second protective net 9 can further prevent tools and personnel from falling, and the sound insulation board 5 installed at the rear and right end of the guardrail 4 can effectively reduce noise. This solves the safety problems of tools falling and personnel falling that may occur when working on the platform body 3, and the problem that the noise generated during construction affects other workers and surrounding residents.

[0033] The embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention.

Claims

1. A noise-reducing construction platform, comprising a base (1), a scissor mechanism (2), a platform main body (3) and a guardrail (4), characterized in that: It also includes a soundproof panel (5), a first protective net (8), a second protective net (9), a safety rope (11), a tool rack (13), and a cabinet (14). The lower inner wall of the platform body (3) is provided with an anti-slip mat (12). The tool rack (13) and the cabinet (14) are fixedly connected to the inner edge of the platform body (3). The tool rack (13) is located on the left side of the cabinet (14). Rope poles (10) are fixedly connected to the inner edges of the front and rear ends of the platform body (3). A safety rope (11) is installed on the rope poles (10). The first protective net (8) is hinged to the left edge of the platform body (3). A second protective net (9) is hinged at the front edge of the platform. A guardrail (4) is fixed at the upper end of the platform body (3). Soundproofing plates (5) are installed on the right end and the inner wall of the rear end of the guardrail (4). Two rope winders (17) are installed at the edges of the inner wall of the left end and the inner wall of the front end of the guardrail (4). A first steel wire rope (6) is installed on the rope winder (17) at the left end of the guardrail (4). A second steel wire rope (7) is installed on the rope winder (17) at the front end of the guardrail (4). The lower end of the first steel wire rope (6) is installed on the upper end of the first protective net (8), and the lower end of the second steel wire rope (7) is installed on the upper end of the second protective net (9).

2. The noise reducing construction platform of claim 1, wherein: The length of the first wire rope (6) is only enough for the first protective net (8) to flip perpendicular to the left end of the platform body (3), and the length of the second wire rope (7) is only enough for the second protective net (9) to flip perpendicular to the front end of the platform body (3).

3. The noise reducing construction platform of claim 2, wherein: The safety rope (11) is a double-hook buffer safety belt rope, and the edge of the anti-slip mat (12) fits against the tool rack (13) and the cabinet (14).

4. The noise reducing construction platform of claim 3, wherein: A locking block (15) is fixed to the left edge of the soundproof panel (5), and a slot (16) is provided on the inner wall of the rear end of the guardrail (4). The locking block (15) and the slot (16) are compatible.

5. The noise reducing construction platform of claim 4, wherein: The lower end of the platform body (3) is equipped with a scissor mechanism (2), and a hydraulic cylinder (18) is installed inside the scissor mechanism (2).

6. The noise reducing construction platform of claim 5, wherein: The lower end of the scissor mechanism (2) is fixedly connected to a base (1), and a ladder (20) is fixedly connected to the right edge of the base (1).

7. The noise reducing construction platform of claim 6, wherein: The front and rear ends of the base (1) are rotatably mounted with wheels that are symmetrically distributed on the left and right. The front and rear ends and the left and right ends of the base (1) are mounted with centrally symmetrical support plates (19).