Multi-lifting-point module tool integration device
By improving the connection structure of the tooling integration device, the problem of inconvenient disassembly and replacement of the pull rope was solved, enabling rapid replacement of the pull rope and convenient connection between the device and the lifting device, thus improving the practicality of the device and the stability of the connection.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- QIDONG HUISHENG HAIGONG EQUIPMENT CO LTD
- Filing Date
- 2025-06-23
- Publication Date
- 2026-05-15
AI Technical Summary
In existing tooling integration devices, the connection method between the pull rope and the hanging plate and base plate is not convenient for disassembly and replacement, which affects the practicality of the device.
The design incorporates components such as a hanging plate, base plate, fixed seat, hanging seat, pull rope, fixing bolt, fixing nut, mounting rod, and mounting nut to enable quick disassembly and installation of the pull rope. Components such as mounting sleeve, connecting column, slider, positioning seat, and rotating sleeve enhance the ease and stability of connection between the device and the lifting device.
It enables quick replacement of the pull rope and convenient connection between the device and the lifting device, improving the practicality of the tooling integration device and the stability of the connection.
Smart Images

Figure CN224242527U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of tooling integration device technology, and in particular to a multi-lifting-point modular tooling integration device. Background Technology
[0002] In real life, all industries are developing rapidly. In the fields of construction, maintenance, and production, there are situations where it is necessary to lift objects. In such cases, tooling integration devices are used to lift objects, including multi-point tooling integration devices.
[0003] In existing technologies, steel ropes are mostly used to connect the lifting plate and the base plate of tooling integration devices. In traditional tooling integration devices, the two ends of the ropes are usually directly fixed to the lifting plate and the base plate. This setting makes it inconvenient to disassemble and install the ropes when they are damaged or when replacing them with ropes of different lengths, thus affecting the normal use of the tooling integration device and reducing its practicality. Utility Model Content
[0004] The purpose of this utility model is to address the shortcomings of existing technologies by proposing a multi-point modular tooling integration device.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: a multi-point modular tooling integration device, comprising a lifting plate and a base plate, wherein the base plate is positioned directly below the lifting plate, and fixed seats are fixedly installed at the four ends of the lower surface of the lifting plate and the four ends of the upper surface of the base plate. A lifting seat is rotatably connected to the inner wall of the fixed seat, and a pull rope is provided between the lifting seat of the lifting plate and the lifting seat of the base plate. A fixing bolt is threadedly connected to one side wall of the fixed seat, and a fixing nut is provided on the other side of the fixed seat. Fixed blocks are fixedly installed at both ends of the pull rope, and an installation rod is fixedly installed at the end of the fixed block away from the pull rope. An installation nut is provided inside the lifting seat, and a connecting component is provided on the upper surface of the lifting plate.
[0006] As a further description of the above technical solution: the fixing bolt passes through one side of the fixing seat and extends to the other side of the fixing seat, the fixing nut engages with the fixing bolt, and the fixing nut abuts against the side wall of the fixing seat, in order to install the hanger onto the fixing seat.
[0007] As a further description of the above technical solution: the mounting rod passes through the outer surface of the hanger and extends into the interior of the hanger. The outer surface of the mounting rod is provided with a threaded groove that engages with the mounting nut. The mounting nut abuts against the inner wall of the hanger in order to install the two ends of the pull rope onto the two hangers.
[0008] As a further description of the above technical solution: mounting brackets are fitted around the base plate, baffles are fixedly installed on the upper surface of the mounting brackets, positioning blocks are fixedly installed on the inner wall of the mounting brackets, and mounting bolts are threadedly connected to the upper surface of the mounting brackets to prevent items on the upper surface of the base plate from falling off.
[0009] As a further description of the above technical solution: the side walls around the base plate are provided with positioning grooves that are adapted to the positioning blocks. The mounting bolts penetrate the upper surface of the base plate and extend to the lower surface of the base plate. The mounting bolts are inserted into the positioning blocks to fix the baffle.
[0010] As a further description of the above technical solution: the connecting assembly includes a mounting sleeve and a connecting column. The mounting sleeve is fixedly installed on the upper surface of the hanging plate, and the connecting column is inserted into the interior of the mounting sleeve. A slider is fixedly installed on the inner wall of the mounting sleeve. A positioning seat is fixedly installed on the outer surface of the connecting column above the mounting sleeve. A rotating sleeve is rotatably connected inside the positioning seat. A rotating handle is fixedly installed on the outer surface of the rotating sleeve. A lifting rope is fixedly installed at the top of the connecting column to facilitate the connection of the lifting device and the integrated device.
[0011] As a further description of the above technical solution: the outer surface of the connecting column is provided with a groove that matches the slider, the outer surface of the mounting sleeve is provided with an external thread, and the inner wall of the rotating sleeve is provided with an internal thread that meshes with the external thread, so that the mounting sleeve and the rotating sleeve can be connected.
[0012] This utility model has the following beneficial effects:
[0013] 1. Compared with existing technologies, this multi-point modular tooling integration device, through the coordination of components such as a lifting plate, base plate, fixed seat, lifting base, pull rope, fixing bolt, fixing nut, fixing block, mounting rod, mounting nut, mounting bracket, baffle, positioning block, and mounting bolt, achieves the function of quick and convenient replacement of the pull rope. It improves the connection method between the pull rope and the lifting plate and base plate in existing technologies, so that when the pull rope is damaged or when replacing pull ropes of different lengths, the pull rope can be quickly disassembled and installed, ensuring the normal use of the tooling integration device and improving its practicality.
[0014] 2. Compared with existing technologies, this multi-point modular tooling integration device, through the cooperation of components such as mounting sleeves, connecting columns, sliders, positioning seats, rotating sleeves, throttles, and lifting ropes, achieves the function of quickly and conveniently connecting the tooling integration device to the lifting device. It improves the connection method between the tooling integration device and the lifting device in existing technologies, making it more convenient and the connection more secure. On the original basis, it further enhances the practicality of the tooling integration device. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of a multi-point lifting module tooling integration device proposed in this utility model;
[0016] Figure 2 This is a schematic diagram of the fixing base structure of a multi-suspension point modular tooling integration device proposed in this utility model;
[0017] Figure 3 This utility model proposes a multi-point modular tooling integration device. Figure 2 Enlarged view of point A in the middle;
[0018] Figure 4 This is a schematic diagram of the baffle structure of a multi-lifting-point modular tooling integration device proposed in this utility model;
[0019] Figure 5 This is a schematic diagram of the connection component structure of a multi-suspension point modular tooling integration device proposed in this utility model.
[0020] Legend:
[0021] 1. Hanging plate; 2. Base plate; 3. Fixed seat; 4. Hanging seat; 5. Pull rope; 6. Fixing bolt; 7. Fixing nut; 8. Fixing block; 9. Mounting rod; 10. Mounting nut; 11. Mounting bracket; 12. Baffle; 13. Positioning block; 14. Mounting bolt; 15. Mounting sleeve; 16. Connecting column; 17. Sliding block; 18. Positioning seat; 19. Rotating sleeve; 20. Rotary handle; 21. Hanging rope. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0023] Reference Figures 1 to 5This utility model provides a multi-point modular tooling integration device, including a lifting plate 1 and a base plate 2. The base plate 2 is located directly below the lifting plate 1. Fixing seats 3 are fixedly installed at the four ends of the lower surface of the lifting plate 1 and the four ends of the upper surface of the base plate 2. Lifting seats 4 are rotatably connected to the inner wall of the fixing seats 3. Pull ropes 5 are provided between the lifting seats 4 of the lifting plate 1 and the lifting seats 4 of the base plate 2. Fixing bolts 6 are threadedly connected to one side wall of the fixing seats 3, and fixing nuts 7 are provided on the other side of the fixing seats 3. The fixing bolts 6 penetrate the fixing seats. 3 extends to one side of the fixed seat 3 and to the other side of the fixed seat 3. The fixed nut 7 engages with the fixed bolt 6. The fixed nut 7 abuts against the side wall of the fixed seat 3. Both ends of the pull rope 5 are fixedly installed with fixed blocks 8. The end of the fixed block 8 away from the pull rope 5 is fixedly installed with an installation rod 9. The inside of the hanging seat 4 is provided with an installation nut 10. The installation rod 9 passes through the outer surface of the hanging seat 4 and extends into the inside of the hanging seat 4. The outer surface of the installation rod 9 is provided with a threaded groove that engages with the installation nut 10. The installation nut 10 abuts against the inner wall of the hanging seat 4.
[0024] To prevent items from falling off the upper surface of the base plate 2, mounting brackets 11 are fitted around the base plate 2. A baffle 12 is fixedly installed on the upper surface of the mounting bracket 11, and a positioning block 13 is fixedly installed on the inner wall of the mounting bracket 11. Positioning grooves that match the positioning blocks 13 are opened on the side walls around the base plate 2. Mounting bolts 14 are threadedly connected to the upper surface of the mounting bracket 11. The mounting bolts 14 penetrate the upper surface of the base plate 2 and extend to the lower surface of the base plate 2. The mounting bolts 14 are inserted into the positioning blocks 13.
[0025] By setting up a hanging plate 1, a base plate 2, a fixed seat 3, a hanging seat 4, a pull rope 5, a fixing bolt 6, a fixing nut 7, a fixing block 8, a mounting rod 9, a mounting nut 10, a mounting bracket 11, a baffle 12, a positioning block 13, and a mounting bolt 14, the function of quickly and conveniently replacing the pull rope 5 is realized. This improves the connection method between the pull rope 5 and the hanging plate 1 and the base plate 2 in the existing technology, so that when the pull rope 5 is damaged or when replacing the pull rope 5 with a different length, the pull rope 5 can be quickly disassembled and installed, ensuring the normal use of the tooling integration device and improving the practicality of the tooling integration device.
[0026] A connecting assembly is provided on the upper surface of the hanging plate 1. The connecting assembly includes a mounting sleeve 15 and a connecting post 16. The mounting sleeve 15 is fixedly installed on the upper surface of the hanging plate 1. The connecting post 16 is inserted into the interior of the mounting sleeve 15. A slider 17 is fixedly installed on the inner wall of the mounting sleeve 15. A groove adapted to the slider 17 is opened on the outer surface of the connecting post 16. A positioning seat 18 is fixedly installed on the outer surface of the connecting post 16 above the mounting sleeve 15. A rotating sleeve 19 is rotatably connected inside the positioning seat 18. An external thread is opened on the outer surface of the mounting sleeve 15. An internal thread that meshes with the external thread is opened on the inner wall of the rotating sleeve 19. A handle 20 is fixedly installed on the outer surface of the rotating sleeve 19. A hanging rope 21 is fixedly installed on the top of the connecting post 16.
[0027] By setting up the installation sleeve 15, connecting column 16, slider 17, positioning seat 18, rotating sleeve 19, throttle 20 and lifting rope 21, the tooling integration device can be quickly and conveniently connected to the lifting device. This improves the connection method between the tooling integration device and the lifting device in the existing technology, making it more convenient and the connection more secure. On the original basis, the practicality of the tooling integration device is further enhanced.
[0028] Working principle: Before using the tooling integration device to lift an object, connect the tooling integration device to the lifting device, lower the height of the lifting rope 21 so that the connecting column 16 moves closer to the mounting sleeve 15, align the connecting column 16 with the mounting sleeve 15, align the slider 17 with the slide groove, and move the connecting column 16 so that it slides into the mounting sleeve 15. When the slider 17 slides inside the slide groove, the rotating sleeve 19 simultaneously slides onto the outer surface of the mounting sleeve 15. Then, rotate the rotating sleeve 19 by the handle 20 so that the rotating sleeve 19 rotates on the outer surface of the mounting sleeve 15. At this time, under the action of the external thread on the mounting sleeve 15 and the internal thread on the rotating sleeve 19, the mounting sleeve 15 and the rotating sleeve 19 are connected to each other. This allows the tooling integration device to be connected to the lifting device via the hoisting rope 21. Then, the item is placed on the upper surface of the base plate 2, and the four baffles 12 are brought close to the perimeter of the base plate 2, so that the mounting frame 11 is aligned with the perimeter of the base plate 2 and the positioning block 13 is aligned with the positioning groove. The baffles 12 are moved so that the mounting frame 11 is fitted onto the perimeter of the base plate 2 and the positioning block 13 is inserted into the positioning groove. Then, the mounting bolts 14 are tightened so that the mounting bolts 14 pass through the base plate 2 and the positioning block 13 to fix the mounting frame 11 and the baffles 12. Finally, the hoisting device pulls the hoisting rope 21 upward, and the hoisting rope 21 pulls the pull rope 5 upward through the hoisting plate 1, thereby lifting the item through the base plate 2.
[0029] When the pull rope 5 needs to be replaced, tighten the mounting nuts 10 inside the hanging brackets 4 at both ends of the pull rope 5 so that the mounting nuts 10 move away from the mounting rod 9 through the threaded groove on the outer surface of the mounting rod 9. After both mounting nuts 10 are separated from the mounting rod 9, the restriction and fixation on the mounting rod 9 are released. Then, remove the two mounting rods 9 from the two hanging brackets 4 to complete the disassembly of the pull rope 5. Then, take out the new pull rope 5 and reverse the above operation to complete the replacement of the pull rope 5.
[0030] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A multi-point lifting modular tooling integration device, comprising a lifting plate (1) and a base plate (2), characterized in that: The base plate (2) is located directly below the hanging plate (1). Fixing seats (3) are fixedly installed at the four ends of the lower surface of the hanging plate (1) and the four ends of the upper surface of the base plate (2). The inner wall of the fixing seat (3) is rotatably connected to the hanging seat (4). A pull rope (5) is provided between the hanging seat (4) of the hanging plate (1) and the hanging seat (4) of the base plate (2). A fixing bolt (6) is threadedly connected to one side wall of the fixing seat (3). A fixing nut (7) is provided on the other side of the fixing seat (3). Fixing blocks (8) are fixedly installed at both ends of the pull rope (5). An installation rod (9) is fixedly installed at the end of the fixing block (8) away from the pull rope (5). An installation nut (10) is provided inside the hanging seat (4). A connecting component is provided on the upper surface of the hanging plate (1).
2. The multi-point lifting module tooling integration device according to claim 1, characterized in that: The fixing bolt (6) passes through one side of the fixing seat (3) and extends to the other side of the fixing seat (3). The fixing nut (7) engages with the fixing bolt (6) and abuts against the side wall of the fixing seat (3).
3. The multi-point lifting module tooling integration device according to claim 1, characterized in that: The mounting rod (9) penetrates the outer surface of the hanger (4) and extends into the interior of the hanger (4). The outer surface of the mounting rod (9) is provided with a threaded groove that engages with the mounting nut (10). The mounting nut (10) abuts against the inner wall of the hanger (4).
4. The multi-point lifting module tooling integration device according to claim 1, characterized in that: The base plate (2) is fitted with mounting brackets (11) around its perimeter. A baffle (12) is fixedly installed on the upper surface of the mounting bracket (11). A positioning block (13) is fixedly installed on the inner wall of the mounting bracket (11). A mounting bolt (14) is threadedly connected to the upper surface of the mounting bracket (11).
5. The multi-point lifting module tooling integration device according to claim 4, characterized in that: The side walls around the base plate (2) are provided with positioning grooves that are compatible with the positioning block (13). The mounting bolt (14) passes through the upper surface of the base plate (2) and extends to the lower surface of the base plate (2). The mounting bolt (14) is inserted into the positioning block (13).
6. The multi-point lifting module tooling integration device according to claim 1, characterized in that: The connecting assembly includes a mounting sleeve (15) and a connecting post (16). The mounting sleeve (15) is fixedly installed on the upper surface of the hanging plate (1). The connecting post (16) is inserted into the interior of the mounting sleeve (15). A slider (17) is fixedly installed on the inner wall of the mounting sleeve (15). A positioning seat (18) is fixedly installed on the outer surface of the connecting post (16) above the mounting sleeve (15). A rotating sleeve (19) is rotatably connected inside the positioning seat (18). A handle (20) is fixedly installed on the outer surface of the rotating sleeve (19). A hanging rope (21) is fixedly installed at the top of the connecting post (16).
7. The multi-point lifting module tooling integration device according to claim 6, characterized in that: The outer surface of the connecting column (16) is provided with a groove that matches the slider (17), the outer surface of the mounting sleeve (15) is provided with an external thread, and the inner wall of the rotating sleeve (19) is provided with an internal thread that meshes with the external thread.