Opening anchorage device for building construction
By designing adjustable open anchors for building construction, and utilizing linkage slide bars and ring connecting columns, the problem of difficult anchor installation has been solved, expanding the scope of application, simplifying the operation process, and reducing the labor intensity of workers.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- 杨志东
- Filing Date
- 2025-02-26
- Publication Date
- 2026-05-19
AI Technical Summary
Existing anchors have fixed specifications, making it difficult to install them according to the holes on the anchor plate, resulting in a narrow range of applications and low practicality.
An open anchor for building construction was designed, including an anchor plate, a first anchor and a second anchor. The first anchor and the second anchor are adjustablely connected by a linkage slide rod and an annular connecting column. The stability and applicability are increased by using structures such as T-slots, conical holes and square slots.
This allows anchors to be combined and installed according to the hole diameter on the anchor plate, expanding the scope of application, simplifying the operation process, and reducing the labor intensity and connection time for workers.
Smart Images

Figure CN224259726U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction technology, and in particular to an open anchor for building construction. Background Technology
[0002] Anchors are key components in prestressed concrete, playing a vital role in permanent anchoring. They are widely used in highway bridges, railway bridges, urban overpasses, urban light rail, high-rise buildings, water conservancy and hydropower dams, port terminals, rock slope anchoring, foundation reinforcement, tunnel and mine roof anchoring, prestressed space frames, subways, large buildings, warehouses and factories, tower buildings, heavy lifting, slipform intermittent propulsion, bridge and tunnel jacking, large containers and ships, sleeper replacement, bridge and building reinforcement, steel reinforcement engineering, anti-magnetic and anti-corrosion engineering, and other fields.
[0003] Currently, most existing anchors have fixed specifications, making it difficult to install them according to the holes on the anchor plate. As a result, the applicable range of anchors is narrow and their practicality is low. Utility Model Content
[0004] The purpose of this utility model is to provide an open anchor for building construction, which can solve the problems of difficulty in installing the anchor according to the holes on the anchor plate and the narrow applicability of the anchor.
[0005] To achieve the above objectives, the present invention provides the following technical solution: an open anchor for building construction, comprising an anchor plate, a second anchor and a linkage slide rod, wherein the anchor plate is provided with a first anchor;
[0006] The first anchorage is located inside the second anchorage;
[0007] The linkage slide bar is equipped with an annular connecting post, which is used to limit the first anchor and the second anchor.
[0008] Preferably, the first anchorage has a T-shaped groove inside, and a T-shaped reinforcing bar is fixedly installed inside the T-shaped groove. This arrangement can increase the stability of the first anchorage and the second anchorage.
[0009] Preferably, both the interior of the first anchor and the interior of the second anchor are provided with tapered holes.
[0010] Preferably, the second anchor has a square groove inside, a first fixing block is fixedly installed on the inner wall of the square groove, a return spring is fixedly installed on one side of the first fixing block, an annular connecting plate is fixedly installed on one side of the return spring, a linkage slide rod is fixedly installed on one side of the annular connecting plate, one end of the linkage slide rod extends to one side of the first fixing block and is fixedly installed with a pull rod, the linkage slide rod and the first fixing block are slidably installed, a second fixing block is fixedly installed on the inner wall of the square groove, and an annular connecting column is fixedly installed on the other side of the annular connecting plate.
[0011] Preferably, the second fixing block has a hole inside for the movement of the annular connecting column, and the T-shaped reinforcing bar has a limiting hole inside for the movement of the annular connecting column. One end of the annular connecting column passes through the hole on the second fixing block and extends into the limiting hole inside the T-shaped reinforcing bar.
[0012] Preferably, the anchor plate has a circular hole inside, and a circular groove is formed inside the circular hole. A fixing ring is fixedly installed on the outer wall of the first anchor, and the fixing ring is located in the circular groove on the anchor plate.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: This open anchor for building construction, through the setting of the linkage sliding rod, can drive the annular connecting column to move. After the annular connecting column is moved, the first anchor and the second anchor can be connected. In this way, when the first anchor is used, the first anchor and the second anchor can be combined according to the diameter of the circular hole on the anchor plate. This makes the first anchor applicable to different types of anchor plates, increasing the applicability of the first anchor and the practicality of the device. Moreover, this installation method is relatively simple and easy for workers to operate, which not only reduces the connection time of workers, but also reduces the labor intensity of workers during connection. Attached Figure Description
[0014] The present invention will be further described below with reference to the accompanying drawings and embodiments:
[0015] Figure 1 This is a perspective view of the present utility model;
[0016] Figure 2 This is a cross-sectional view of the present invention;
[0017] Figure 3 This is an enlarged view of part A of this utility model.
[0018] Reference numerals in the attached drawings: 1. Anchor plate; 2. First anchor; 3. Second anchor; 4. T-shaped reinforcing bar; 5. Fixing ring; 6. First fixing block; 7. Return spring; 8. Annular connecting plate; 9. Second fixing block; 10. Annular connecting column; 11. Linkage slide rod; 12. Conical hole. Detailed Implementation
[0019] This section will describe in detail the specific embodiments of the present utility model. The preferred embodiments of the present utility model are shown in the accompanying drawings. The purpose of the drawings is to supplement the textual description with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present utility model, but they should not be construed as limiting the scope of protection of the present utility model.
[0020] Please see Figure 1-3This utility model provides a technical solution: an open anchor for building construction, including an anchor plate 1, a second anchor 3 and a linkage slide rod 11. The anchor plate 1 is provided with a first anchor 2; the first anchor 2 is located inside the second anchor 3; the linkage slide rod 11 is provided with an annular connecting column 10, which is used to limit the first anchor 2 and the second anchor 3.
[0021] Furthermore, the first anchor 2 has a T-shaped groove inside, and a T-shaped reinforcing rib 4 is fixedly installed inside the T-shaped groove. Both the first anchor 2 and the second anchor 3 have tapered holes 12 inside. The second anchor 3 has a square groove inside, and a first fixing block 6 is fixedly installed on the inner wall of the square groove. A return spring 7 is fixedly installed on one side of the first fixing block 6, and an annular connecting plate 8 is fixedly installed on one side of the return spring 7. A linkage slide rod 11 is fixedly installed on one side of the annular connecting plate 8, with one end of the linkage slide rod 11 extending to one side of the first fixing block 6 and a pull rod fixedly installed thereon. The linkage slide rod 11 and the first fixing block 6 are slidably installed. A second fixing block 9 is fixedly installed on the inner wall of the square groove, and an annular connecting post 10 is fixedly installed on the other side of the annular connecting plate 8. The second fixing block 9 has a hole inside that allows the annular connecting post 10 to move. The T-shaped reinforcing rib 4 also has a hole inside that allows the annular connecting post 10 to move. The limiting hole is provided. One end of the annular connecting column 10 passes through the hole on the second fixing block 9 and extends into the limiting hole inside the T-shaped reinforcing rib 4. The anchor plate 1 has a circular hole inside, and a circular groove is formed inside the circular hole. A fixing ring 5 is fixedly installed on the outer wall of the first anchor 2. The fixing ring 5 is located in the circular groove on the anchor plate 1. This arrangement can drive the annular connecting column 10 to move. After the annular connecting column 10 is moved, the first anchor 2 and the second anchor 3 can be connected. In this way, when the first anchor 2 is used, the first anchor 2 and the second anchor 3 can be combined according to the diameter of the circular hole on the anchor plate 1. This allows the first anchor 2 to be used with different types of anchor plates 1, increasing the applicability of the first anchor 2 and the practicality of the device. Moreover, this installation method is relatively simple and easy for workers to operate. It can not only reduce the connection time of workers, but also reduce the labor intensity of workers during connection.
[0022] Working principle: When in use, the worker pulls the linkage slide rod 11. The movement of the linkage slide rod 11 moves the annular connecting plate 8 and the annular connecting column 10. After the annular connecting column 10 is moved, the first anchor 2 is placed inside the second anchor 3. Then the linkage slide rod 11 is released. After the linkage slide rod 11 is released, it can rebound through the return spring 7. After the return spring 7 rebounds, the annular connecting column 10 can be reset. After the annular connecting column 10 is reset, the first anchor 2 and the second anchor 3 can be connected.
[0023] The embodiments of the present utility model have been described in detail above with reference to the accompanying drawings. However, the present utility model is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present utility model.
Claims
1. An open anchor for building construction, characterized in that, include: Anchor plate (1), and a first anchor (2) is provided on the anchor plate (1); The second anchor (3) is located inside the first anchor (2); Linkage slide rod (11), with an annular connecting column (10) on the linkage slide rod (11), the annular connecting column (10) is used to limit the first anchor (2) and the second anchor (3); The first anchor (2) has a T-shaped groove inside, and a T-shaped reinforcing bar (4) is fixedly installed inside the T-shaped groove. Both the interior of the first anchor (2) and the interior of the second anchor (3) are provided with tapered holes (12); The second anchor (3) has a square groove inside. A first fixing block (6) is fixedly installed on the inner wall of the square groove. A return spring (7) is fixedly installed on one side of the first fixing block (6). An annular connecting plate (8) is fixedly installed on one side of the return spring (7). A linkage slide rod (11) is fixedly installed on one side of the annular connecting plate (8). One end of the linkage slide rod (11) extends to one side of the first fixing block (6) and is fixedly installed with a pull rod. The linkage slide rod (11) and the first fixing block (6) are slidably installed. A second fixing block (9) is fixedly installed on the inner wall of the square groove. An annular connecting column (10) is fixedly installed on the other side of the annular connecting plate (8).
2. The open anchor for building construction according to claim 1, characterized in that: The second fixing block (9) has a hole inside which the annular connecting column (10) can move. The T-shaped reinforcing bar (4) has a limiting hole inside which the annular connecting column (10) can move. One end of the annular connecting column (10) passes through the hole on the second fixing block (9) and extends into the limiting hole inside the T-shaped reinforcing bar (4).
3. The open anchor for building construction according to claim 2, characterized in that: The anchor plate (1) has a circular hole inside, and a circular groove inside the circular hole. A fixing ring (5) is fixedly installed on the outer wall of the first anchor (2), and the fixing ring (5) is located in the circular groove on the anchor plate (1).