Temporary pipe support tool for kissirrigation

By designing temporary pipe support fixtures for pipe joint operations, the installation difficulties caused by pipeline deformation and settlement were solved, improving construction efficiency and safety while reducing costs.

CN224301484UActive Publication Date: 2026-05-29GUANGDONG ZHUHAI JINWAN LIQUEFIED NATURAL GAS

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GUANGDONG ZHUHAI JINWAN LIQUEFIED NATURAL GAS
Filing Date
2025-05-07
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

At present, due to site and weather conditions, there are deviations between the construction methods and installation plans in the on-site pipeline connection work, which leads to installation difficulties. In particular, the long-term idleness of the reserved pipe for ORV seawater pipeline connection has caused pipeline deformation and misalignment, which increases the difficulty of installation.

Method used

A temporary pipe support fixture for pipe jointing operations was designed, including a base, a column, a placement platform, and various support structures, to stabilize the pipe joint, adapt to pipe deformation and settlement, improve stability through diagonal supports and support columns, and provide reinforcement devices on the support columns to support the weight of the pipe joint.

Benefits of technology

It improves construction efficiency, reduces installation costs and safety hazards, has a simple structure and is easy to operate, is suitable for various construction scenarios, and is suitable for widespread application.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224301484U_ABST
    Figure CN224301484U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of temporary pipe support tool of mouth operation, including base, base is set as "H" shape, two columns are set on base upper surface parallelly, column upper surface is equipped with placing table, placing table is set as "V" shape, pipeline mouth is placed in "V" shaped groove, the inconvenience brought to mouth operation by deformation and sinking situation caused by pipeline long-term retention is solved.The utility model is simple in structure, easy to operate, applicable to pipeline deformation and settlement mouth operation, wide in application range, improve construction efficiency, reduce the security risk of construction personnel itself, save construction cost, suitable for popularization and application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of mechanical structure technology, and in particular relates to a temporary pipe support tool for jointing operations. Background Technology

[0002] At present, many on-site pipeline connection operations are difficult due to deviations between construction methods and installation plans caused by site conditions and weather.

[0003] For example, during the construction of the ORV seawater pipeline connection, the reserved pipe was left idle for a long time, which caused pipeline deformation on the reserved side. The centers of the first and second phase pipelines were not on the same center line, which made the installation very difficult. Utility Model Content

[0004] The problem this utility model aims to solve is to provide a temporary pipe support fixture for joint operations, which is particularly simple in structure and easy to operate, improving installation efficiency and safety, thereby reducing installation costs.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is: a temporary pipe support fixture for pipe jointing operations, including a base, a column on the upper surface of the base, a placement platform on the upper surface of the column, a groove on the upper surface of the placement platform, and the pipe joint being placed in the groove.

[0006] Furthermore, the base includes a first rod and a second rod, both of which are square tubes. The first rod and the second rod are placed parallel to each other, and a third rod is connected to the center of the side of the first rod and the center of the side of the second rod. The base is arranged in an "H" shape.

[0007] Furthermore, the column includes a first column and a second column, with the first column located at the center of the upper surface of the first pole and the second column located at the center of the upper surface of the second pole.

[0008] Furthermore, both the first and second columns are provided with diagonal supports in the front and rear directions.

[0009] Furthermore, the inclined support includes a first inclined support, a second inclined support, a third inclined support, and a fourth inclined support. The bottom end of the first inclined support is placed on the upper surface of one end of the first rod, and the top end of the first inclined support is placed on one side of the first column. The bottom end of the second inclined support is placed on the upper surface of the other end of the first rod, and the top end of the second inclined support is placed on the other side of the first column. The bottom end of the third inclined support is placed on the upper surface of one end of the second rod, and the top end of the third inclined support is placed on one side of the second column. The bottom end of the fourth inclined support is placed on the upper surface of the other end of the second rod, and the top end of the fourth inclined support is placed on the other side of the second column.

[0010] Furthermore, the placement platform includes a first support rod and a second support rod. One end of the first support rod is connected to one end of the second support rod in a "V" shape. The other end of the first support rod is placed on the upper surface of the first column, and the other end of the second support rod is placed on the upper surface of the second column.

[0011] Furthermore, it also includes a support column, one end of which is placed at the center of the upper surface of the third rod, and the other end of which is placed on the lower surface of the connection between the first support rod and the second support rod.

[0012] Furthermore, the supporting column is equipped with a reinforcement device.

[0013] Furthermore, it also includes side supports, which include a first side support and a second side support, wherein the first side support is placed on the side of the first column and the second side support is placed on the side of the second column.

[0014] Furthermore, the first side support includes a first base rod and a first diagonal rod. One end of the first base rod is vertically connected to the center of the outer side of the first rod, one end of the first diagonal rod is connected to the other end of the first base rod, and the other end of the first diagonal rod is connected to the top of the outer side of the first column.

[0015] The advantages and positive effects of this utility model are:

[0016] This utility model has a simple structure and is easy to operate. It is suitable for joint operations involving pipeline deformation and settlement, has a wide range of applications, improves construction efficiency, reduces safety hazards for construction workers, and saves construction costs. It is suitable for widespread application. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the overall structure and usage state of an embodiment of this utility model.

[0018] Figure 2 This is a schematic diagram of the overall structure of an embodiment of this utility model.

[0019] In the picture:

[0020] 1. Base; 1-1. First rod; 1-2. Second rod;

[0021] 1-3, Third pole; 2, Post; 2-1, First post;

[0022] 2-2. Second column; 2-3. Support column; 3. Placement platform;

[0023] 3-1, First support rod; 3-2, Second support rod; 4, Diagonal support;

[0024] 4-1, First diagonal support; 4-2, Second diagonal support; 4-3, Third diagonal support;

[0025] 4-4, Fourth diagonal support; 5, Side support; 5-1, First base rod;

[0026] 5-2, First diagonal brace; 6, Pipeline joint; 7, Reinforcing device. Detailed Implementation

[0027] The technical solution of this utility model will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this utility model. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

[0028] In the description of this utility model, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0029] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0030] The embodiments of this utility model will be further described below with reference to the accompanying drawings:

[0031] like Figure 1 As shown, a temporary pipe support fixture for pipe jointing includes a base 1, a column 2 on the upper surface of the base 1, a placement platform 3 on the upper surface of the column 2, and a groove on the upper surface of the placement platform 3. The pipe joint 6 is placed in the groove to avoid pipe deformation and settlement.

[0032] Specifically, such as Figure 2As shown, the base 1 provided in this embodiment includes a first rod 1-1 and a second rod 1-2. Both the first rod 1-1 and the second rod 1-2 are square tubes. The first rod 1-1 and the second rod 1-2 are placed in parallel. A third rod 1-3 is connected to the center of the side of the first rod 1-1 and the center of the side of the second rod 1-2. The base 1 is arranged in an "H" shape.

[0033] The support column 2 includes a first support column 2-1 and a second support column 2-2. The first support column 2-1 is located at the center of the upper surface of the first pole 1-1, and the second support column 2-2 is located at the center of the upper surface of the second pole 1-2. The support column 2 can be specifically set according to the height of the pipeline connection 6, or the support column 2 can be set as a height-adjustable telescopic support column 2 to meet the inconvenience caused by deformation and subsidence of pipelines due to long-term retention in various construction sites.

[0034] Preferably, in this embodiment, both the first column 2-1 and the second column 2-2 are provided with diagonal supports 4 in the front and rear directions. Specifically, the diagonal supports 4 include a first diagonal support 4-1, a second diagonal support 4-2, a third diagonal support 4-3, and a fourth diagonal support 4-4. The bottom end of the first diagonal support 4-1 is placed on the upper surface of one end of the first column 1-1, and the top end of the first diagonal support 4-1 is placed on one side of the first column 2-1. The bottom end of the second diagonal support 4-2 is placed on the upper surface of the other end of the first column 1-1, and the top end of the second diagonal support 4-2 is placed on the other side of the first column 2-1. The bottom end of the third diagonal support 4-3 is placed on the upper surface of one end of the second column 1-2, and the top end of the third diagonal support 4-3 is placed on one side of the second column 2-2. The bottom end of the fourth diagonal support 4-4 is placed on the upper surface of the other end of the second column 1-2, and the top end of the fourth diagonal support 4-4 is placed on the other side of the second column 2-2.

[0035] The placement platform 3 has a groove for accommodating the pipe connection 6, preventing it from slipping off. Specifically, the placement platform 3 and the groove can have various structures, as long as they fulfill the aforementioned functions. Specifically, the placement platform 3 provided in this embodiment includes a first support rod 3-1 and a second support rod 3-2. One end of the first support rod 3-1 and one end of the second support rod 3-2 are connected in a "V" shape. The other end of the first support rod 3-1 rests on the upper surface of the first column 2-1, and the other end of the second support rod 3-2 rests on the upper surface of the second column 2-2. Specifically, the angle between the first support rod 3-1 and the second support rod 3-2 can be adjusted according to the diameter of the pipe connection 6.

[0036] like Figure 2 As shown, it also includes a support column 2-3. One end of the support column 2-3 is placed at the center of the upper surface of the third rod 1-3, and the other end of the support column 2-3 is placed on the lower surface of the connection between the first support rod 3-1 and the second support rod 3-2. The support column 2-3 is used to support the placement platform 3 and bear the weight of the cable contact 6. Preferably, the support column 2-3 is provided with a reinforcement device 7.

[0037] It also includes side support 5, which includes a first side support and a second side support. The first side support is placed on the side of the first column 2-1, and the second side support is placed on the side of the second column 2-2.

[0038] like Figure 2 As shown, the first side support includes a first base rod 5-1 and a first diagonal rod 5-2. One end of the first base rod 5-1 is perpendicularly connected to the center of the outer side of the first rod 1-1, and one end of the first diagonal rod 5-2 is connected to the other end of the first base rod 5-1. The other end of the first diagonal rod 5-2 is connected to the top of the outer side of the first column 2-1. The side support 5 increases the floor area of ​​the base 1, making the base 1 more stable and preventing the entire support from tilting left and right. Preferably, the second side support structure is the same as the first side support structure.

[0039] The working principle of this utility model is as follows:

[0040] In ORV seawater pipeline connection 6 operations, this utility model is placed below the pipeline connection 6, so that the pipeline connection 6 is placed in the groove on the placement platform, which solves the inconvenience caused by the deformation and sinking of the pipeline due to long-term retention and improves work efficiency.

[0041] The advantages and positive effects of this utility model are:

[0042] This utility model has a simple structure and is easy to operate. It is suitable for joint operations involving pipeline deformation and settlement, has a wide range of applications, improves construction efficiency, reduces safety hazards for construction workers, and saves construction costs. It is suitable for widespread application.

[0043] The embodiments of this utility model have been described in detail above, but the content described is only a preferred embodiment of this utility model and should not be considered as limiting the scope of implementation of this utility model. All equivalent changes and improvements made in accordance with the claims of this utility model should still fall within the patent coverage of this utility model.

Claims

1. A temporary pipe support fixture for jointing operations, characterized in that: The system includes a base, an upper surface of which is provided with a column, an upper surface of which is provided with a placement platform, an upper surface of which is provided with a groove, and a pipe connection is placed in the groove. The base includes a first rod and a second rod, both of which are square tubes. The first rod and the second rod are placed parallel to each other. A third rod is connected to the center of the side of the first rod and the center of the side of the second rod. The base is arranged in an "H" shape.

2. The temporary pipe support fixture for jointing operations according to claim 1, characterized in that: The column includes a first column and a second column, with the first column located at the center of the upper surface of the first pole and the second column located at the center of the upper surface of the second pole.

3. The temporary pipe support fixture for jointing operations according to claim 2, characterized in that: Both the first and second columns are equipped with diagonal supports in the front and rear directions.

4. The temporary pipe support fixture for jointing operations according to claim 3, characterized in that: The diagonal support includes a first diagonal support, a second diagonal support, a third diagonal support, and a fourth diagonal support. The bottom end of the first diagonal support is placed on the upper surface of one end of the first rod, and the top end of the first diagonal support is placed on one side of the first column. The bottom end of the second diagonal support is placed on the upper surface of the other end of the first rod, and the top end of the second diagonal support is placed on the other side of the first column. The bottom end of the third diagonal support is placed on the upper surface of one end of the second rod, and the top end of the third diagonal support is placed on one side of the second column. The bottom end of the fourth diagonal support is placed on the upper surface of the other end of the second rod, and the top end of the fourth diagonal support is placed on the other side of the second column.

5. A temporary pipe support fixture for jointing operations according to any one of claims 2 to 4, characterized in that: The placement platform includes a first support rod and a second support rod. One end of the first support rod is connected to one end of the second support rod in a "V" shape. The other end of the first support rod is placed on the upper surface of the first column, and the other end of the second support rod is placed on the upper surface of the second column.

6. The temporary pipe support fixture for jointing operations according to claim 5, characterized in that: It also includes a support column, one end of which is placed at the center of the upper surface of the third rod, and the other end of which is placed on the lower surface of the connection between the first support rod and the second support rod.

7. A temporary pipe support fixture for jointing operations according to claim 6, characterized in that: The supporting column is equipped with a reinforcement device.

8. A temporary pipe support fixture for jointing operations according to any one of claims 2 to 4, characterized in that: It also includes side supports, which include a first side support and a second side support, wherein the first side support is placed on the side of the first column and the second side support is placed on the side of the second column.

9. A temporary pipe support fixture for jointing operations according to claim 8, characterized in that: The first side support includes a first base rod and a first diagonal rod. One end of the first base rod is perpendicularly connected to the center of the outer side of the first rod. One end of the first diagonal rod is connected to the other end of the first base rod, and the other end of the first diagonal rod is connected to the top of the outer side of the first column.