Prefabricated shear wall dry connection module
By using the splicing design of prefabricated dry connection modules for shear walls, the problem of grout leakage during shear wall construction has been solved, achieving higher connection strength and stability, and improving the durability and construction efficiency of the building structure.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- 中电建路桥集团有限公司
- Filing Date
- 2025-07-15
- Publication Date
- 2026-06-02
AI Technical Summary
During the construction of existing shear walls, grout leakage is prone to occur during concrete pouring, resulting in incomplete filling at the wall joints, reducing concrete strength, and affecting the load-bearing capacity of the shear wall structure.
The prefabricated dry connection module of the shear wall is adopted, and modular splicing is achieved through components such as splicing columns, connecting plates, connecting columns and reinforcing bars. The stability and sealing of the splicing are ensured by using connection methods such as clamps, limit bolts and fixing screws.
It improved the strength and stability of the shear wall joints, reduced grout leakage, enhanced the overall building structure's durability and construction efficiency, and shortened the construction period.